Home / Browse projects / Solapur, Maharashtra / MAGESTY BLOSSOM

Registered No litigation declared Residential / Group Housing project

MAGESTY BLOSSOM

By MAGESTY BUILDERS & DEVELOPERS

RG-MH-16900 · RERA P52600028277 · Last updated on MahaRERA portal: 8 Apr 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 43 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 43 months from the original
0 of 11Construction stages donefurthest along: Excavation, 10%
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

MAGESTY BLOSSOM is a Residential / Group Housing project by MAGESTY BUILDERS & DEVELOPERS in Solapur, Maharashtra, registered with MahaRERA as P52600028277 on 18 Feb 2021. Possession is promised by 30 Jun 2027. The completion date has moved by 43 months from the original filing.

At a glance

Project

  • NameMAGESTY BLOSSOM
  • TypeResidential / Group Housing
  • Location
    • VIJAPUR ROAD
    • NEHARU NAGER
    • Solapur (M Corp.)
    • Solapur North
    • Solapur
    • 413004
  • Pincode413004
  • RERA no.P52600028277
  • ReraGenie IDRG-MH-16900

Builder

  • NameMAGESTY BUILDERS & DEVELOPERS
  • Entity typePartnership
  • PartnersSANTOSH DATTATRAYA KALKUTGI, VANDANA TANAJI JADHAV, VIDYALATA SAMEER SALGAR
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2021First promiseNov 2023Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Feb 2021
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 1 Nov 2023)
  • Buildings1 building record
  • Documents filed82 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MAGESTY BLOSSOMNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 10%.

MAGESTY BLOSSOM: 1% average across the applicable activities

ActivityProgress
Excavation10%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area838 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1928.55
Proposed, not sanctioned1,153 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR BESKAR TOWER ,201/1/15 MAHAVIR CHOWK CIVIL LINES SOLPUR 413003

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR RAHUL S KHAMITKAR
EngineerKISHORI JOSHI
Chartered AccountantCHETAN NOGAJA
PartnerRole in project
MAGESTY BUILDERS & DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52600017292Nov 2023 → Oct 2024

Reason as filed by the promoterUPLOADING TDR AND SUBMISSION OF REVISE PLAN PERMISSION

EXT52600024720Nov 2023 → Jun 2027

Reason as filed by the promoterDue to delays caused by material shortages, labor shortages, and insufficient funding, the project has been delayed. However, with the funding now available, we kindly request an extension until 30/06/2027 to complete the project

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Feb 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Feb 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Feb 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: FORM B.pdf8 Apr 2025
Disclosure of sold/ booked inventoryFile: 30092022.pdf8 Apr 2025
Disclosure of sold/ booked inventoryFile: 30032023.pdf8 Apr 2025
Disclosure of sold/ booked inventoryFile: 30062023.pdf8 Apr 2025
Disclosure of sold/ booked inventoryFile: 30092023.pdf8 Apr 2025
Disclosure of sold/ booked inventoryFile: 30122023.pdf8 Apr 2025
Disclosure of sold/ booked inventoryFile: 30032024.pdf8 Apr 2025
Disclosure of sold/ booked inventoryFile: 30062024.pdf8 Apr 2025
Disclosure of sold/ booked inventoryFile: 30092024.pdf8 Apr 2025
Disclosure of sold/ booked inventoryFile: 30122024.pdf8 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 30062024.pdf7 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 30092024.pdf7 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 30122024.pdf7 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 30032023.pdf5 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 30062023.pdf5 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 30092023.pdf5 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 30122023.pdf5 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 30032024.pdf5 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 30062024.pdf5 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 30092024.pdf5 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 30122024.pdf5 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf5 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5.pdf5 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30032023.pdf3 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30122024_compressed (1).pdf3 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30092024.pdf3 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30062024.pdf3 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30032024.pdf3 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30122023.pdf3 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30092023.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30062023.pdf1 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30092023.pdf1 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30122023.pdf1 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30032024.pdf1 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30062024.pdf1 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30092024.pdf1 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30122024.pdf1 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30032023.pdf1 Mar 2025
Details of encumbrances concerned to FinanceFile: 2LEGAL encumbarance.pdf19 Feb 2025
Details of encumbrances concerned to FinanceFile: Financial Encumbrance Certificate1.pdf19 Feb 2025
CERSAI detailsFile: CERSAI DECLARATION.pdf19 Feb 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration of Separate Bank Account (1) (1).pdf19 Feb 2025
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter.pdf19 Feb 2025
Details of encumbrances concerned to LegalFile: 2LEGAL encumbarance.pdf19 Feb 2025
Details of encumbrances concerned to LegalFile: Financial Encumbrance Certificate1.pdf19 Feb 2025
Other - TechnicalFile: ANNEXURE A - DECLARATION CUM UNDERTAKING (1).pdf19 Feb 2025
Deviation Report with respect to model copy of AgreementFile: 7 Deviation Report to Agreement.pdf19 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other organisations.pdf19 Feb 2025
Building plan approvalFile: SK SMC PLAN.pdf25 Jun 2024
Building plan approvalFile: SK CERTIFICATE.pdf25 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: SK SMC PLAN.pdf25 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: SK CERTIFICATE.pdf25 Jun 2024
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate.pdf23 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: CA Certificate Annual Report 20-21.pdf23 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA Certificate Annual Report 19-20.pdf23 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA Certificate Annual Report 20-21.pdf23 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Certificate Annual Report 21-22.pdf23 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Certificate Annual Report 22-23.pdf23 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account Details Including No Encumbrances On The Bank Account .pdf23 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf16 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Quality Assurance Certificate 2019-2020.pdf16 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Quality Assurance Certificate 2020-21.pdf16 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Quality Assurance Certificate 2021-22.pdf16 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Quality Assurance Certificate 2022-23.pdf16 Jan 2024
CERSAI detailsFile: CERSAI.pdf16 Jan 2024
Disclosure of sold/ booked inventoryFile: SOLD AND BOOKED INVENTORY.pdf16 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: SOLD AND BOOKED INVENTORY.pdf16 Jan 2024
Proforma of Agreement for saleFile: PERFORMA OF AGRREMENT OF SALE.pdf16 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: NA Order.pdf10 Feb 2021
Declaration in FORM BFile: Affidavit Cum Declaration.pdf10 Feb 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificates.pdf10 Feb 2021
Proforma of Allotment letterFile: Allotment Letter.pdf10 Feb 2021
Layout approvalFile: Layout.pdf5 Feb 2021
Building plan approvalFile: Building Permission.pdf5 Feb 2021
Copy of the legal title reportFile: LEGAL REPORT.pdf5 Feb 2021
Copy of Layout Approval (in case of layout)File: Layout.pdf5 Feb 2021
Building Plan Approval / NA Order for plotted developmentFile: Building Permission.pdf5 Feb 2021
Commencement Certificates / NA Order for plotted developmentFile: Building Permission.pdf5 Feb 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Cost Of Project.pdf5 Feb 2021
Proforma of Allotment letterFile: perform aof agreement for sale.pdf5 Feb 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SANVI ARCADEPLOT NO 3&4 NATH HOMES VIJAPUR ROAD SOLAPUR12CompletedJan 2018Jan 2018

How this compares with Solapur

15%of Solapur projects moved their completion datethis one moved by 43 months
39%of Solapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 550+ Solapur projects on ReraGenie, from their own filings.

Keep MAGESTY BLOSSOM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEHARU NAGER550+ in Solapur

Builder: MAGESTY BUILDERS & DEVELOPERS

MAGESTY BUILDERS & DEVELOPERS has 1 registration on MahaRERA, including MAGESTY BLOSSOM. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Solapur district page.

Frequently asked questions

What are my rights if MAGESTY BLOSSOM is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAGESTY BLOSSOM?

The registered promoter entity is MAGESTY BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAGESTY BLOSSOM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MAGESTY BLOSSOM?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAGESTY BLOSSOM?

The professionals named in the filing: Architect: AR RAHUL S KHAMITKAR; Engineer: KISHORI JOSHI; Chartered Accountant: CHETAN NOGAJA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAGESTY BLOSSOM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAGESTY BLOSSOM. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAGESTY BLOSSOM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.