Home / Browse projects / Mumbai Suburban, Maharashtra / MAGATHANE PRESS ENCLAVE CHSL

Registered No litigation declared Residential / Group Housing project

MAGATHANE PRESS ENCLAVE CHSL

By DHARIWAL DEVELOPERS (INDIA) PRIVATE LIMITED

RG-MH-56170 · RERA P51800034383 · Last updated on MahaRERA portal: 25 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Basement (if any), 0%
42 of 113Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

MAGATHANE PRESS ENCLAVE CHSL is a Residential / Group Housing project by DHARIWAL DEVELOPERS (INDIA) PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800034383 on 5 Apr 2022. Possession is promised by 10 Mar 2027. 71 of the 113 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameMAGATHANE PRESS ENCLAVE CHSL
  • TypeResidential / Group Housing
  • Location
    • BUILDING NO 63 MAHATHANE
    • MAGATHANE
    • Borivali
    • Mumbai Suburban
    • 400066
  • Pincode400066
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800034383
  • ReraGenie IDRG-MH-56170

Builder

  • NameDHARIWAL DEVELOPERS (INDIA) PRIVATE LIMITED
  • Entity typeCompany
  • Managing DirectorsPREETI SANJEEV MALHOTRA, SANJEEV MOTILAL MALHOTRA
  • DirectorSANJEEV MOTILAL MALHOTRA
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredApr 2022PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Apr 2022
  • Promised completion10 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed73 files

Current status

63%71 of 113 units booked
97.0%Work done, per cost certificate

Figures as on 25 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MAGATHANE PRESS ENCLAVE CHSLNA32241130113

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

MAGATHANE PRESS ENCLAVE CHSL: 45% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed61

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots61
Closed/Covered61

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area993 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Oct 2025
LandownerVillageDistrict
MAGATHANE PRESS ENCLAVE CHSLBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMHADA
Permissible FSI4974.14
Proposed, not sanctioned4,974 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJAYDEV HOUSE PLOT NO 93A GOVT IND ESTATE KANDIVALI WEST MUMBAI 400067
Estimated costRs 88.66 cr
Cost incurredRs 86.00 cr
Work done97.0%
BuildingWingEstimatedIncurred
MAGATHANE PRESS ENCLAVE CHSLNARs 44.33 crRs 43.00 cr
-NARs 44.33 crRs 43.00 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRITHVI ARCH
EngineerCSE CONSULTANTS
Chartered AccountantABHAY H SHAH& CO
PartnerRole in project
DHARIWAL DEVELOPERS (INDIA) PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 10 Mar 2027

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architect Certificate Q4 Press Enclave Jan 2026 to March 2026.pdf25 May 2026
Withdrawal Update Form 2File: form 2.pdf25 May 2026
Withdrawal Update Form 3File: Form 3 CA Certificate Q4 Press Enclave 1st Jan to 31st March.pdf25 May 2026
Withdrawal Update Form 1File: Form 1 Q3 2025-26 Magathane press enclave.pdf13 Mar 2026
Withdrawal Update Form 2File: engineer form 2 Q3 Press.pdf13 Mar 2026
Withdrawal Update Form 3File: Magathane form 3 Q 3 Revised .pdf13 Mar 2026
Withdrawal Update Form 1File: form 1.pdf13 Jan 2026
Withdrawal Update Form 2File: FORM2.pdf13 Jan 2026
Withdrawal Update Form 3File: form 3 Q2 press enclave_compressed.pdf13 Jan 2026
Withdrawal Update Form 1File: form 1.pdf3 Jan 2026
Withdrawal Update Form 2File: Press Engineer Certificate Q1 .pdf3 Jan 2026
Withdrawal Update Form 3File: form 3_compressed (2).pdf3 Jan 2026
form 229 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3 for magathane press enclave Q4.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate for period jan to march 2025 press enclave edited.pdf1 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate form 3 october to december for Project magathane press enclave (1) (1).pdf21 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3 july to sep 24 (2).pdf1 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 April 2022 - june2022 (1).pdf26 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 3 january 2023 March 2023 (1).pdf26 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer form - 2.pdf29 Jan 2025
Building plan approvalFile: IOA.pdf25 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf25 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: IOA.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3.pdf18 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Certificate form 5 23-24.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate form 1 october to December 2023.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate 1 jan to march 2024.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate 1 April to June 2024.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1 july to September 2024.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1 october to December 2024.pdf10 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Form 2A 23-24.pdf10 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: jan to march 24 qtr Form 3.pdf1 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE.pdf2 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE.pdf2 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold - Booked Inventory-Press Enclave.pdf2 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 06 22.pdf29 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 09 22.pdf29 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 12 22.pdf29 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 03 23.pdf29 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 06 23.pdf29 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 09 23.pdf29 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 12 23.pdf29 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-23.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 23 Q3.pdf19 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf16 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: press enclave -Engineer form 2A.pdf17 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 -press enclave.pdf14 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate form 2.pdf6 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect form quarter 1.pdf3 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect form quarter 2.pdf3 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect form quarter 3.pdf3 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect form quarter 4.pdf3 Apr 2023
Copy of the legal title reportFile: title certificate- Press enclave.pdf31 Mar 2022
Layout approvalFile: plans 1 and 2.pdf30 Mar 2022
Layout approvalFile: plans 3 and 4.pdf30 Mar 2022
Layout approvalFile: plans 5 and 6.pdf30 Mar 2022
Copy of Layout Approval (in case of layout)File: plans 1 and 2.pdf30 Mar 2022
Copy of Layout Approval (in case of layout)File: plans 3 and 4.pdf30 Mar 2022
Copy of Layout Approval (in case of layout)File: plans 5 and 6.pdf30 Mar 2022
Declaration about Commencement CertificateFile: Form D -Press enclave.pdf30 Mar 2022
Proforma of Allotment letterFile: draft 1.pdf26 Mar 2022
Building plan approvalFile: APPROVAL.pdf23 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: APPROVAL.pdf23 Mar 2022
Details of encumbrancesFile: press enclave -No Encumbrance certificate.pdf12 Mar 2022
Declaration in FORM BFile: affidavit1.pdf12 Mar 2022
Declaration in FORM BFile: afdvt 2.pdf12 Mar 2022
Declaration in FORM BFile: afdvt3.pdf12 Mar 2022
Declaration in FORM BFile: afdvt 4.pdf12 Mar 2022
CERSAI detailsFile: CERSAI REPORT.pdf12 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE FORM 3.pdf12 Mar 2022
Proforma of Allotment letterFile: DRAFT press AGREEMENT FOR SALE.pdf12 Mar 2022
PAN CardFile: 1 PAN Card.pdf11 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: 5639_firstcc_signed.pdf11 Mar 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
OM SAI CHSLCTS NO 445 445-1 TO 20 VILLAGE PAHADI GOREGAON EAST MUMBAI 40006360CompletedFeb 2017Feb 2017

How this compares with Mumbai Suburban

63%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MAGATHANE PRESS ENCLAVE CHSL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MAGATHANE6,700+ in Mumbai Suburban

2 kmMAGATHANE PRESS ENCLAVE Completed 98Lapsed / revoked 64Other 142Dot size: filed unitsN

Filed coordinates, straight-line distance. 304 registered projects within 2 km.

Builder: DHARIWAL DEVELOPERS (INDIA) PRIVATE LIMITED

DHARIWAL DEVELOPERS (INDIA) PRIVATE LIMITED has 3 registrations on MahaRERA, including SIDDHARTH NAGAR SWAMI VIVEKANAND CHSL and MAGATHANE PRESS ENCLAVE CHSL. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if MAGATHANE PRESS ENCLAVE CHSL is delayed beyond 10 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MAGATHANE PRESS ENCLAVE CHSL?

The registered promoter entity is DHARIWAL DEVELOPERS (INDIA) PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MAGATHANE PRESS ENCLAVE CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MAGATHANE PRESS ENCLAVE CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MAGATHANE PRESS ENCLAVE CHSL?

The professionals named in the filing: Architect: PRITHVI ARCH; Engineer: CSE CONSULTANTS; Chartered Accountant: ABHAY H SHAH& CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MAGATHANE PRESS ENCLAVE CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MAGATHANE PRESS ENCLAVE CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MAGATHANE PRESS ENCLAVE CHSL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.