Registered No litigation declared Residential / Group Housing project

MADHUBAN

By VRINDAVAN LAND DEVELOPERS

RG-MH-76659 · RERA P52000019615 · Last updated on MahaRERA portal: 26 Mar 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 36 months from the original
14 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 40%
89 of 114Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

MADHUBAN is a Residential / Group Housing project by VRINDAVAN LAND DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000019615 on 14 Feb 2019. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 25 of the 114 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete.

At a glance

Project

  • NameMADHUBAN
  • TypeResidential / Group Housing
  • Location
    • UMROLI
    • AASHANE KOSHANE WATERFALL
    • Karjat
    • Raigarh
    • 410201
  • Pincode410201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000019615
  • ReraGenie IDRG-MH-76659

Builder

  • NameVRINDAVAN LAND DEVELOPERS
  • Entity typePartnership

Key dates

this monthRegisteredFeb 2019First promiseDec 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Feb 2019
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2023)
  • Buildings2 building records
  • Documents filed89 files

Current status

22%25 of 114 units booked

Figures as on 26 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TYPE - ANA5566066
TYPE - BNA5548048

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 26 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 40%.

TYPE - A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TYPE - B41%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 26 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,432 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Dec 2025

Approvals and building plan

Sanctioning authorityGroup Grampanchayat Umroli / Nagar Rachana Raigad Alibaugh
Permissible FSI2420.23
Proposed, not sanctioned2,420 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMULUND WEST

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKIRAN RAVINDRA TERSE
EngineerISHAN AGARWAL
Chartered AccountantVimal Masrani
Chartered AccountantURVI D PATEL
PartnerRole in project
VRINDAVAN LAND DEVELOPERS-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000018644Dec 2023 → Dec 2024

Reason as filed by the promoterDelay in Plan Pass from Alibaugh Plan Passing Committee

EXT52000025750Dec 2023 → Dec 2025

Reason as filed by the promoterType A Wing A OC has been received Type A Wing B all flats are ready to possession Extension is requested for Type B Building were only 2 flats are sold. Resolutaion for the same has been passed.

EA16122518710Dec 2023 → Dec 2026

Reason as filed by the promoterType A all flats are ready for possession. Extension is requested for Type B Building were only 2 flats are sold. Resolution for the same has been passed. Due to adverse market condition, sales of flat is getting tough due to which construction of Type B Building is taking time. We have already reached second slab construction for Type B Building. Plan to complete construction by September 2026 and receive OC accordingly.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jan 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Feb 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Feb 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jan 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 24 Dec 2024

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Oct 25 to Dec 25_compressed.pdf26 Mar 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate .pdf26 Mar 2026
Withdrawal Update Form 3File: Form 3 Oct 25 to Dec 25.pdf26 Mar 2026
Withdrawal Update Form 1File: Vrindavan Land Developers Form 1 30062025.pdf16 Dec 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate .pdf16 Dec 2025
Withdrawal Update Form 3File: Form 3 Vrindavan 30062025-signed.pdf16 Dec 2025
Form 1File: Vrindavan Land Developers Form 1 31032025.pdf4 Dec 2025
Form 2File: Vrindavan Land developers Form 2 31032025.pdf4 Dec 2025
Form 3File: Form 3 Vrindavan 31032025.pdf4 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory .pdf4 Dec 2025
Form 1File: Form 1 Architech Certificate.pdf4 Dec 2025
Form 2File: Form 2 Engineers Certificate.pdf4 Dec 2025
Form 3File: Form 3 Vrindavan 311224 signed.pdf4 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory .pdf4 Dec 2025
Withdrawal Update Form 1File: Vrindavan Land Developers Form 1 30092025.pdf4 Dec 2025
Withdrawal Update Form 1File: Vrindavan Land Developers Form 1 30062025.pdf4 Dec 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate .pdf4 Dec 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate .pdf4 Dec 2025
Withdrawal Update Form 3File: Form 3 Vrindavan 30092025-signed.pdf4 Dec 2025
Withdrawal Update Form 3File: Form 3 Vrindavan 30062025-signed.pdf4 Dec 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A FY 2019- 20-signed.pdf27 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A FY 2020- 21-signed.pdf27 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A FY 2021- 22-signed.pdf27 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 2022- 23-signed.pdf27 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 2023- 24-signed.pdf27 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Certificate FY 202324.pdf27 Feb 2025
Details of encumbrancesFile: Details of Encumbrance .pdf28 Jan 2025
Details of encumbrancesFile: Form B Notarized .pdf28 Jan 2025
Declaration in FORM BFile: Form B Notarized .pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architech Certificate.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf28 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory .pdf28 Jan 2025
CERSAI detailsFile: Form B Notarized .pdf28 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration about Rera Bank Account .pdf28 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate .pdf28 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Engineers Certificate for Quality Assurance.pdf28 Jan 2025
Declaration in FORM BFile: Form B Vrindavan Land Developers .pdf11 Jan 2025
Certificates of CA (Form 3)File: Form 3 Vrindavan 311224 signed.pdf9 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Vrindavan land developers.pdf4 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Vrindavan land developers.pdf4 Jan 2025
Certificates of CA (Form 3)File: Form 3 Vrindavan 310324.pdf24 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Certificate.pdf24 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory 310324 signed.pdf24 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Certificate FY 202324.pdf24 Dec 2024
Declaration in FORM BFile: Form B for Extension .pdf15 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory 311223.pdf15 Feb 2024
Certificates of CA (Form 3)File: Form 3 Vrindavan 311223.pdf15 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate .pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate .pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf2 Jan 2024
Certificates of CA (Form 3)File: Form 3 Vrindavan 310323.pdf2 Jan 2024
Certificates of CA (Form 3)File: Form 3 Vrindavan 300623.pdf2 Jan 2024
Certificates of CA (Form 3)File: Form 3 Vrindavan 300923.pdf2 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Certificate FY 2022-23.pdf2 Jan 2024
Certificates of CA (Form 3)File: Form 3 Vrindavan 310319.pdf22 Apr 2023
Certificates of CA (Form 3)File: Form 3 Vrindavan 310320.pdf22 Apr 2023
Certificates of CA (Form 3)File: Form 3 Vrindavan 310321.pdf22 Apr 2023
Certificates of CA (Form 3)File: Form 3 Vrindavan 310322.pdf22 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 Certificate FY 2017-18.pdf22 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Certificate FY 2018-19.pdf22 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Certificate FY 2019-20.pdf22 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Certificate FY 2020-21.pdf22 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Certificate FY 2021-22.pdf22 Apr 2023
Layout approvalFile: Layout.pdf7 Feb 2019
Layout approvalFile: Type A.pdf7 Feb 2019
Layout approvalFile: Type B.pdf7 Feb 2019
Building plan approvalFile: Plan Passing.pdf7 Feb 2019
Copy of Layout Approval (in case of layout)File: Layout.pdf7 Feb 2019
Copy of Layout Approval (in case of layout)File: Type A.pdf7 Feb 2019
Copy of Layout Approval (in case of layout)File: Type B.pdf7 Feb 2019
Building Plan Approval (IOD)File: Plan Passing.pdf7 Feb 2019
Details of encumbrancesFile: FORM 'B' AFFIDAVIT CUM DECELARATION.pdf2 Feb 2019
Declaration in FORM BFile: FORM 'B' AFFIDAVIT CUM DECELARATION.pdf2 Feb 2019
PAN CardFile: PAN Card.pdf31 Jan 2019
Copy of the legal title reportFile: chindu kamlu hire purchase.pdf31 Jan 2019
Copy of the legal title reportFile: ashok sitaram hire.pdf31 Jan 2019
Copy of the legal title reportFile: ganesh kaluram hire purchase.pdf31 Jan 2019
Copy of the legal title reportFile: gautam kasinath hire.pdf31 Jan 2019
Copy of the legal title reportFile: haribhau rambhau hire.pdf31 Jan 2019
Copy of the legal title reportFile: narayan keshav hire.pdf31 Jan 2019

How this compares with Raigarh

22%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 36 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MADHUBAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AASHANE KOSHANE WATERFALL5,900+ in Raigarh

2 kmMADHUBANCompleted 2Lapsed / revoked 8Other 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 16 registered projects within 2 km.

Builder: VRINDAVAN LAND DEVELOPERS

VRINDAVAN LAND DEVELOPERS has 1 registration on MahaRERA, including MADHUBAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if MADHUBAN is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MADHUBAN?

The registered promoter entity is VRINDAVAN LAND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MADHUBAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MADHUBAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MADHUBAN?

The professionals named in the filing: Architect: KIRAN RAVINDRA TERSE; Engineer: ISHAN AGARWAL; Chartered Accountant: Vimal Masrani; Chartered Accountant: URVI D PATEL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MADHUBAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MADHUBAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MADHUBAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.