Home / Browse projects / Nagpur, Maharashtra / MADAN RATAN CITY

Registered No litigation declared Others project

MADAN RATAN CITY

By EMAAR DEVELOPERS & BUILDERS PVT LTD

RG-MH-00821 · RERA P50500001473 · Last updated on MahaRERA portal: 7 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 66 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 66 months from the original
28 of 77Construction stages doneacross 7 buildings; furthest along: Sanitary Fittings within the flats /..., 95%
48 of 48Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 176 documents Report an error

MADAN RATAN CITY is a Others project by EMAAR DEVELOPERS & BUILDERS PVT LTD in Nagpur, Maharashtra, registered with MahaRERA as P50500001473 on 28 Jul 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 66 months from the original filing. 0 of the 48 units on this registration are recorded sold or booked, and 28 of 77 construction stages are filed complete.

At a glance

Project

  • NameMADAN RATAN CITY
  • TypeOthers
  • Location
    • MOUZA CHIKHALI KHURD
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440032
  • Pincode440032
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500001473
  • ReraGenie IDRG-MH-00821

Builder

  • NameEMAAR DEVELOPERS & BUILDERS PVT LTD
  • Entity typeCompany
  • Managing DirectorMADAN BALAJI RATAN
  • Declared earlier projects2 →

Key dates

this monthRegisteredJul 2017First promiseJun 2021Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Jul 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2021)
  • Buildings7 building records
  • Documents filed176 files

Current status

0%0 of 48 units booked

Figures as on 7 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AMARO APARTMENT G-6NA80000
AMARO APARTMENT 7TH FLOORNA10000
AMBER G-6 FLOORNA7048048
ADEN VILLA-1NA20000
ADEN VILLA-2NA30000
ADEN VILLA-3NA20000
AMBER 7TH FLOORNA10000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

28 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

AMARO APARTMENT G-673%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises55%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
AMARO APARTMENT 7TH FLOOR0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
AMBER G-6 FLOOR83%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.55%
ADEN VILLA-178%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
ADEN VILLA-274%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
ADEN VILLA-380%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
AMBER 7TH FLOOR0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes85%
Water SupplyYes25%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes70%
Street LightingYes55%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes25%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes25%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes55%
Electrical meter room, sub-station, receiving stationYes35%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
Entrance Gate and Security CabinYes85%

Parking filed106

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots106
Closed/Covered78
Open Space28
BuildingClosed/CoveredOpen SpaceTotal
AMARO APARTMENT G-651051
AMARO APARTMENT 7TH FLOOR088
AMBER G-6 FLOOR101
ADEN VILLA-1909
ADEN VILLA-2808
ADEN VILLA-3909
AMBER 7TH FLOOR02020

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area17,971 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityCREDAI NAGPUR
Permissible FSI21089.5
Proposed, not sanctioned14,317 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRAVI NAGAR CHOWK NAGPUR 440033

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR ADITYA INDURKAR
EngineerER MUQSIT AHMED SHAIKH
EngineerAAJ ENGINEERS & CONSULTANTS PVT LTD
EngineerER ARUN UTTARWAR
Chartered AccountantKhanzode & Shenwai Chartered Accountants
Chartered AccountantA M DABKE & ASSOCIATES
Chartered AccountantRAKESH THAKRE & CO
PartnerRole in project
EMAAR DEVELOPERS & BUILDERS PVT LTD-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500009696Jun 2021 → Jun 2022

Reason as filed by the promoterDUE TO PENDAMIC THERE WAS COMPLETE LOCK DOWN IN 2020,WHICH WAS SLOWLY LIFTED FROM JUNE TO AUGUST 2020. MIGRANT LABOURERS RETURNED TO WORK ONLY AFTER DIWALI 2020.CONSTRUCTION ACTIVITY RESUMED IN NOVEMBER 2020.AGAIN IN MARCH 2021 A LOCK DOWN WAS IMPOSED IN MAHARASHTRA WHICH IS STILL CONTIUNING TILL DATE .CONSTRUCTION ACTIVITY CAN NOT BE STARTED FOR NON AVAILABILITY OF LABOUR AND MATERIAL. UNDER THE CIRCUMSTANCES WE REQUEST YOU TO EXTEND THE COMPLETION DATE TO 30/06/2022.LETTER TO THE EFFECT IS ENCLOSED.

EXT50500013138Jun 2021 → Dec 2024

Reason as filed by the promoterThe housing project is on Land admeasuring 18200 sq. mts. The permissible builtup area is 21090 sq. mts Sanctioned FSI is 14317 sq. mts. Since the permissible built up area is more than 20000 sq. mts promoters are required to construct and hand over 54 1BHK apartments to MHADA for LIG category people. The project was initially delayed due to introduction of GST as there was confusion among customers because of GST impact and booking suffered on this account. After that due to demonetization of high value currency notes booking was further impacted and construction was delayed. After these issu

EXT50500025309Jun 2021 → Dec 2026

Reason as filed by the promoterDELAY IN GETTING REVISED SANCTIONED MAP AND STP WORK AND ENVIRONMENTAL CLEARANCE IS PENDING DUE TO THE NECESSARY APPROVALS FROM THE COMPETENT AUTHORITIES OF THE STATE GOVERNMENT AS THE NEW STATE GOVERNMENT IS YET TO BE FORMED IN MAHARASHTRA. CPM PERT AND JUSTIFICATION FOR DELAY IN WORK ATTACHED HEREWITH ALONG WITH OTHER DOCUMENTS INCLUDING QUARTERLY PROGRESS FORMS

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed176

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 176 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Architech Certificate Q4 FY 25-26.pdf7 May 2026
Form 2File: Form 2 Engineer Certificate Q4 FY 25-26.pdf7 May 2026
Form 3File: Form 3 CA Certificate Q4 FY 25-26.pdf7 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold inventory.pdf7 May 2026
Self-declaration of Quarterly ProgressFile: Self Declaration.pdf7 May 2026
Form 1File: Form 1 Q3 FY 25-26.pdf20 Jan 2026
Form 2File: Form 2 Q3 FY 25-26.pdf20 Jan 2026
Form 3File: Form3 Q3 FY 25-26.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold - unsold.pdf20 Jan 2026
Self-declaration of Quarterly ProgressFile: Self Declaration.pdf20 Jan 2026
Form 1File: Form 1 Q2 FY 25-26.pdf12 Oct 2025
Form 2File: Form 2 Q2 FY 25-26.pdf12 Oct 2025
Form 3File: Form 3 Q2 FY 25-26.pdf12 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Q2 FY 25-26.pdf12 Oct 2025
Self-declaration of Quarterly ProgressFile: Self Declaration.pdf12 Oct 2025
Form 2A (FY 2024-2025)File: FORM-2A.pdf29 Sep 2025
Form 5 (FY 2024-2025)File: Emaar Form 5.pdf27 Sep 2025
Form 1File: Form 1.pdf20 Jul 2025
Form 2File: Form 2.pdf20 Jul 2025
Form 3File: Form 3 Q1 FY 25-26.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and Unsold Inventory.pdf20 Jul 2025
Self-declaration of Quarterly ProgressFile: Self Declaration.pdf20 Jul 2025
Form 1File: FORM 1 Architect Certificate 30624.pdf3 Jun 2025
Form 2File: FORM 2 Engineer Certificate30624.pdf3 Jun 2025
Form 3File: Form 3 Q1 FY 24-25.pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 30-06-24.pdf3 Jun 2025
Form 1File: Form1 Architect Certificate 30924.pdf3 Jun 2025
Form 2File: Form 2 Engineer Certificate 30924.pdf3 Jun 2025
Form 3File: Form 3 Q2 FY 24-25.pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold 30-09-24.pdf3 Jun 2025
Form 1File: Form 1 Architects Certificate.pdf3 Jun 2025
Form 2File: Form 2 Engineers Certificate.pdf3 Jun 2025
Form 3File: Form 3 CA Certificate Q3 FY 24-25.pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold-booked inventory.pdf3 Jun 2025
Form 1File: Emaar Form 1.pdf3 Jun 2025
Form 2File: Emaar Form 2.pdf3 Jun 2025
Form 3File: FORM-3_compressed.pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold 31032025.pdf3 Jun 2025
Form 1File: Form 1 30-06-2023.pdf3 Jun 2025
Form 2File: Form 2 30-06-2023.pdf3 Jun 2025
Form 3File: Form 3 30-06-2023.pdf3 Jun 2025
Form 1File: Form 1 30-09-2023.pdf3 Jun 2025
Form 2File: Form 2 30-09-2023.pdf3 Jun 2025
Form 3File: Form 3 30-09-2023.pdf3 Jun 2025
Form 1File: Form 1 31-12-2023.pdf3 Jun 2025
Form 2File: Form 2 31-12-2023.pdf3 Jun 2025
Form 3File: Form 3 31-12-2023.pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold- Booked Inventory.pdf3 Jun 2025
Form 1File: Form 1 31-03-24.pdf3 Jun 2025
Form 2File: Form 2 31-03-24.pdf3 Jun 2025
Form 3File: FORM 3 31-03-2024.pdf3 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architects Certificate.pdf10 Feb 2025
Certificates of CA (Form 3)File: Form 3 CA Certificate Q3 FY 24-25.pdf10 Feb 2025
Certificates of CA (Form 5)File: Form 5.pdf10 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate.pdf10 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold-booked inventory.pdf10 Feb 2025
Other - TechnicalFile: CPM PERT.pdf1 Feb 2025
Other - TechnicalFile: Justification for Extension.pdf1 Feb 2025
Other - TechnicalFile: Mada Letter.pdf1 Feb 2025
Other - TechnicalFile: Map Revision Application.pdf1 Feb 2025
Other - TechnicalFile: MHDA Indemnity bond.pdf1 Feb 2025
Declaration in FORM BFile: Form B Emaar project Extensioncompressed.pdf11 Dec 2024
Declaration in FORM BFile: Form B Emaar _compressed.pdf2 Dec 2024
Declaration in FORM BFile: Form B Emaar _compressed.pdf2 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf2 Dec 2024
Certificates of CA (Form 3)File: Form 3_compressed.pdf2 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate.pdf2 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 30-06-24.pdf25 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 30-09-24.pdf25 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Architect Certificate 30624.pdf23 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 Architect Certificate 30924.pdf23 Oct 2024
Certificates of CA (Form 3)File: Form 3 Q1 FY 24-25.pdf23 Oct 2024
Certificates of CA (Form 3)File: Form 3 Q2 FY 24-25.pdf23 Oct 2024
Certificates of CA (Form 5)File: Form 5 23-24.pdf23 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate 30924.pdf23 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineer Certificate30624.pdf23 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf23 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf23 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-03-24.pdf6 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31-03-24.pdf6 Jun 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
RATAN GOVERDHAN PLAZAHOUSE NO 551 & 369 C GAWALIPURA MAHAL NAGPUR 44003252CompletedJun 2016May 2016
RATAN HEIGHT477 MEDICAL CHOWK NAGPUR 44000965CompletedDec 2014Nov 2014

How this compares with Nagpur

0%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 66 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MADAN RATAN CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nagpur (M Corp.)2,800+ in Nagpur

2 kmMADAN RATAN CITYCompleted 12Lapsed / revoked 9Other 18Dot size: filed unitsN

Filed coordinates, straight-line distance. 39 registered projects within 2 km.

Builder: EMAAR DEVELOPERS & BUILDERS PVT LTD

EMAAR DEVELOPERS & BUILDERS PVT LTD has 1 registration on MahaRERA, including MADAN RATAN CITY. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if MADAN RATAN CITY is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MADAN RATAN CITY?

The registered promoter entity is EMAAR DEVELOPERS & BUILDERS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MADAN RATAN CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for MADAN RATAN CITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MADAN RATAN CITY?

The professionals named in the filing: Architect: AR ADITYA INDURKAR; Engineer: ER MUQSIT AHMED SHAIKH; Engineer: AAJ ENGINEERS & CONSULTANTS PVT LTD; Engineer: ER ARUN UTTARWAR; Chartered Accountant: Khanzode & Shenwai Chartered Accountants; Chartered Accountant: A M DABKE & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MADAN RATAN CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MADAN RATAN CITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MADAN RATAN CITY to a free account