Home / Browse projects / Wardha, Maharashtra / MAA MAHALAXMI RESIDENCY
MAA MAHALAXMI RESIDENCY
RG-MH-95726 · RERA P50400020774 · Last updated on MahaRERA portal: 17 Feb 2023
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Wardha registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MAA MAHALAXMI RESIDENCY is a Residential / Group Housing project by MAA VAISHNAVI INFRA in Wardha, Maharashtra, registered with MahaRERA as P50400020774 on 9 May 2019. The registration is recorded completed; possession was promised by 30 Dec 2023.
At a glance
Project
- NameMAA MAHALAXMI RESIDENCY
- TypeResidential / Group Housing
- Location
- MOUZA NO 143
- SINDHI (MEGHE)
- Sindi Turf Hindnagar (CT)
- Wardha
- 442001
- Pincode442001
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50400020774
- ReraGenie IDRG-MH-95726
Builder
- NameMAA VAISHNAVI INFRA
- Entity typePartnership
- PartnersPRADIP DEVIDAS RITHE, HOMESHWAR VASANTRAO THAMEKAR, GAJANAN TIMAJI GURNULE, PRANITA ANIL JUMDE
- Other registrations1 more →
- Completed1 of 2
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on9 May 2019
- Promised completion30 Dec 2023
- Revised completionNone
- Buildings2 building records
- Documents filed77 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING-1 | NA | 6 | 0 | 0 | 0 | 0 |
| WING-2 | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 17 Feb 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
21 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
WING-1100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING-291%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 17 Feb 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed4
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| WING-1 | 1 | 1 | 2 |
| WING-2 | 1 | 1 | 2 |
Land and ownership4
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| PRADIP RITHE | Pipri (CT) | Wardha |
| Homeshwar Thamekar | Wardha (M Cl) | Wardha |
| Gajanan Gurnule | Sawangi (Meghe) (CT) | Wardha |
| Pranita Jumde | Wardha (M Cl) | Wardha |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Swapnil khedikar |
| Engineer | Sachin Pahade |
| Engineer | Dinesh Lakade |
| Chartered Accountant | APJ & Associates |
| Chartered Accountant | Pravin Dhiran & Co |
| Partner | Role in project |
|---|---|
| MAA VAISHNAVI INFRA | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 May 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 May 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 May 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 May 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 17 Feb 2023
Documents filed77
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-03-2021.pdf | 17 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-12-2021.pdf | 17 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-03-2022.pdf | 17 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1_Form 2 30-09-2019.pdf | 17 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2_Form 2 31-12-2019.pdf | 17 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3_Form 2 31-03-2020.pdf | 17 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4_Form 2 30-06-2020.pdf | 17 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5_Form 2 30-09-2020.pdf | 17 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 6_Form 2 31-12-2020.pdf | 17 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 7_Form 2 31-03-2021.pdf | 17 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 8_Form 2 31-12-21.pdf | 17 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 9_Form 2 31-03-2022.pdf | 17 Feb 2023 |
| Form 2AFile: Form 2A 31-03-2021.pdf | 17 Feb 2023 |
| Form 2AFile: Form 2A 31-3-2022.pdf | 17 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Annexure 29 31-12-2021.pdf | 17 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Annexure 29 31-03-2022.pdf | 17 Feb 2023 |
| Certificates of CA (Form 3)File: Form3 31-12-2021.pdf | 17 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3 31-03-2022.pdf | 17 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Vaishnavi_Infra_Mahalaxmi_Residency_20-21.pdf | 17 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Vaishnavi_Infra_Mahalaxmi_Residency_21-22.pdf | 17 Feb 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: म्हाडा Wing-2.pdf | 17 Feb 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: SWAPNASHILP.pdf | 17 Feb 2023 |
| Certificates of CA (Form 3)File: 3 Form 3_30-6-19.pdf | 8 Feb 2023 |
| Certificates of CA (Form 3)File: 3 Form 3_30-9-19.pdf | 8 Feb 2023 |
| Certificates of CA (Form 3)File: 3 Form 3_31-12-19.pdf | 8 Feb 2023 |
| Certificates of CA (Form 3)File: 3 Form 3_31-3-20.pdf | 8 Feb 2023 |
| Certificates of CA (Form 3)File: 3 Form 3_30-6-20.pdf | 8 Feb 2023 |
| Certificates of CA (Form 3)File: 3 Form 3_30-9-20.pdf | 8 Feb 2023 |
| Certificates of CA (Form 3)File: 3 Form 3_31-12-20.pdf | 8 Feb 2023 |
| Certificates of CA (Form 3)File: 3 Form 3_31-3-21.pdf | 8 Feb 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate_Sindhi (Meghe).pdf | 8 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 25 May 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Cert.pdf | 25 May 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 25 May 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form_1_31-03-20.pdf | 25 May 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form_1_30-06-20.pdf | 25 May 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form_1_30-09-20.pdf | 25 May 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form_1_31-12-20.pdf | 25 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 25 May 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form_2A_30-09-20.pdf | 25 May 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form_2A_31-12-20.pdf | 25 May 2022 |
| Form 2AFile: Form_2A_30-09-20.pdf | 22 Jul 2021 |
| Form 2AFile: Form_2A_31-12-20.pdf | 22 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 30-06-20.pdf | 22 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 30-09-20.pdf | 22 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 31-12-20.pdf | 22 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form_2A_30-06-20.pdf | 22 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form-5 Vaishnavi Infra 310320.pdf | 19 Jul 2021 |
| Form 2AFile: Form_2A_31-03-20.pdf | 22 Feb 2021 |
| Form 2AFile: Form_2A_30-06-20.pdf | 22 Feb 2021 |
| Form 2AFile: Form_2A_30-09-20.pdf | 22 Feb 2021 |
| Form 2AFile: Form_2A_31-12-20.pdf | 22 Feb 2021 |
| OtherFile: Application to SDO for receiving Occupation Certificate_02-10-20.pdf | 15 Feb 2021 |
| OtherFile: Completion Certificate_Architect_Form_G.pdf | 15 Feb 2021 |
| OtherFile: Completion Certificate_Sindhi (Meghe).pdf | 15 Feb 2021 |
| Form 2AFile: Form 2A.pdf | 20 Feb 2020 |
| Form 2AFile: Form 2A.pdf | 20 Feb 2020 |
| Form 2AFile: Form 2A.pdf | 27 Jul 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Form_2 Engineer.pdf | 5 May 2019 |
| Layout approvalFile: 13 layout Sanction.pdf | 4 May 2019 |
| Layout approvalFile: 12 Layout Map.pdf | 4 May 2019 |
| Building plan approvalFile: Sanction Map - 2.pdf | 4 May 2019 |
| Building plan approvalFile: Sanction Map - 1.pdf | 4 May 2019 |
| PAN CardFile: Pan Card of Firm.pdf | 4 May 2019 |
| Copy of the legal title reportFile: 4 Search Report.pdf | 4 May 2019 |
| Details of encumbrancesFile: 5 Encumbrance Certificate.pdf | 4 May 2019 |
| Copy of Layout Approval (in case of layout)File: 13 layout Sanction.pdf | 4 May 2019 |
| Copy of Layout Approval (in case of layout)File: 12 Layout Map.pdf | 4 May 2019 |
| Building Plan Approval (IOD)File: Sanction Map - 2.pdf | 4 May 2019 |
| Building Plan Approval (IOD)File: Sanction Map - 1.pdf | 4 May 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: 9 Building Permit from TP.pdf | 4 May 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: 10 Building Permit from GP.pdf | 4 May 2019 |
| Declaration in FORM BFile: 6 Form B.pdf | 4 May 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 Architect Cert Form 1.pdf | 4 May 2019 |
| Certificates of CA (Form 3)File: 3 Form_3.pdf | 4 May 2019 |
| Proforma of Allotment letterFile: 7 Agreement to Sale.pdf | 4 May 2019 |
| Proforma of Allotment letterFile: 8 Allotment Letter.pdf | 4 May 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Wardha
Computed across the 290+ Wardha projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 77 filed documents as one ZIP, foldered, with a manifest
Keep MAA MAHALAXMI RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SINDHI (MEGHE)290+ in Wardha
Filed coordinates, straight-line distance. 16 registered projects within 2 km.
Shri Ram Vatika
Krishnagiri Developers
LITTLE EARTH UNIT 11
SANJAY P. MANMODE, GANESH P. ATKAR AND MOH
Shree Sadguru Krushnagiri Nagari
Shree Samarth Infra
DATTADHAM PART 4
HARIBHAU WASUDEORAO WAZURKAR
Mahalaxmi CIty Part-2
Krushna Builders & Developers
ISHWAR NAGAR
Mahesh Batra & 2 Others
See every Wardha project, with the district possession charts
Builder: MAA VAISHNAVI INFRA
MAA VAISHNAVI INFRA has 2 registrations on MahaRERA, including MAA MAHALAXMI RESIDENCY and TARA COMMERCIAL COMPLEX. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Wardha district page.
Frequently asked questions
What are my rights if MAA MAHALAXMI RESIDENCY is delayed beyond 30 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MAA MAHALAXMI RESIDENCY?
The registered promoter entity is MAA VAISHNAVI INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MAA MAHALAXMI RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MAA MAHALAXMI RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MAA MAHALAXMI RESIDENCY?
The professionals named in the filing: Architect: Swapnil khedikar; Engineer: Sachin Pahade; Engineer: Dinesh Lakade; Chartered Accountant: APJ & Associates; Chartered Accountant: Pravin Dhiran & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MAA MAHALAXMI RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback