Home / Browse projects / Nagpur, Maharashtra / Maa Chandika Nagar

Registered No litigation declared Plotted project

Maa Chandika Nagar

By Wasudeorao Anadrao Deshmukh

RG-MH-68094 · RERA P50500054396 · Last updated on MahaRERA portal: 26 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
21 of 49Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

Maa Chandika Nagar is a Plotted project by Wasudeorao Anadrao Deshmukh in Nagpur, Maharashtra, registered with MahaRERA as P50500054396 on 18 Jan 2024. Possession is promised by 31 Dec 2026. 28 of the 49 units on this registration are recorded sold or booked.

At a glance

Project

  • NameMaa Chandika Nagar
  • TypePlotted
  • Location
    • Kh No 46/1
    • Mouza - Katol
    • P.H.No. 44
    • Tah - Katol
    • Distt - Nagpur
    • Katol
    • Katol (M Cl)
    • Nagpur
    • 441302
  • Pincode441302
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500054396
  • ReraGenie IDRG-MH-68094

Builder

  • NameWasudeorao Anadrao Deshmukh
  • Entity typeIndividual
  • Other registrations1 more →

Key dates

this monthRegisteredJan 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Jan 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed79 files

Current status

57%28 of 49 units booked
82.4%Work done, per cost certificate

Figures as on 26 Jun 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 26 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes85%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes80%
Street LightingYes80%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes80%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,581 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Jun 2025

Approvals and building plan

Sanctioning authorityOffice of the Thasildhar Katol

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKatol Main Road
Estimated costRs 1.00 cr
Cost incurredRs 82.42 lakh
Work done82.42%
BuildingWingEstimatedIncurred
-NARs 1.00 crRs 82.42 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAshish Khobraghade
ArchitectVaibhav Khadse
EngineerParesh Shelke
EngineerVaibhav Khadse
Chartered AccountantRishi Lashkare Lashkare
Chartered AccountantRavindra Lashkare
PartnerRole in project
Wasudeorao Anadrao Deshmukh-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2026-2027)File: Form 2A march 2027.pdf26 Jun 2026
Form 5 (FY 2023-2024)File: form 5 Ma Chandika Nagar- march 2024.pdf26 Jun 2026
Form 5 (FY 2024-2025)File: form 5 Ma Chandika Nagar -march 2025.pdf26 Jun 2026
Form 5 (FY 2025-2026)File: form 5 Ma Chandika Nagar- march 2026.pdf26 Jun 2026
Withdrawal Update Form 1File: FORM 1 - Arch Certificate - MAA CHANDIKA NAGAR - Sept 2025.pdf21 May 2026
Withdrawal Update Form 1File: FORM 1 - Arch Certificate - MAA CHANDIKA NAGAR - Dec 2025.pdf21 May 2026
Withdrawal Update Form 1File: FORM 1 - Arch Certificate - MAA CHANDIKA NAGAR - March 2026.pdf21 May 2026
Withdrawal Update Form 2File: FORM 2 - Engineer Certificate - MAA CHANDIKA NAGAR - Sept 2025.pdf21 May 2026
Withdrawal Update Form 2File: FORM 2 - Engineer Certificate - MAA CHANDIKA NAGAR - Dec 2025.pdf21 May 2026
Withdrawal Update Form 2File: FORM 2 - Engineer Certificate - MAA CHANDIKA NAGAR - March 2026.pdf21 May 2026
Withdrawal Update Form 3File: FORM 3 - CA Certificate - MAA CHANDIKA NAGAR - Sept 2025.pdf21 May 2026
Withdrawal Update Form 3File: FORM 3 - CA Certificate - MAA CHANDIKA NAGAR - Dec 2025.pdf21 May 2026
Withdrawal Update Form 3File: FORM 3 - CA Certificate MAA CHANDIKA NAGAR - March 2026.pdf21 May 2026
Form 2A (FY 2023-2024)File: Form 2A 2023-2024 new.pdf12 Mar 2026
Form 2A (FY 2024-2025)File: Form 2A 2024-2025 new.pdf12 Mar 2026
Form 2A (FY 2025-2026)File: Form 2A 2025-2026 new.pdf12 Mar 2026
Withdrawal Update Form 1File: Maa Chandika Nagar - Form 1 - June 2025.pdf5 Sep 2025
Withdrawal Update Form 2File: Maa Chandika Nagar - Form 2 - June 2025.pdf5 Sep 2025
Withdrawal Update Form 3File: Maa Chandika Nagar - Form 3 - June 2025_compressed.pdf5 Sep 2025
Form 1File: Maa Chandika Nagar - Form 1 - March 2025.pdf17 Aug 2025
Form 2File: Maa Chandika Nagar - Form 2 - March 2025.pdf17 Aug 2025
Form 3File: Maa Chandika Nagar - Form 3 - March 2025.pdf17 Aug 2025
Disclosure of Sold and Booked InventoryFile: Maa Chandika Nagar - Disclosure - March 2025.pdf17 Aug 2025
Form 1File: Maa Chandika Nagar - Form 1- December 2024.pdf26 Jun 2025
Form 2File: Maa Chandika Nagar - Form 2 - December 2024.pdf26 Jun 2025
Form 3File: Maa Chandika Nagar - Form 3 - December 2024.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: Maa Chandika Nagar - Disclosure - December 2024.pdf26 Jun 2025
Form 1File: Maa Chandika Nagar - Form 1 - September 2024.pdf26 Jun 2025
Form 2File: Maa Chandika Nagar - Form 2 - September 2024.pdf26 Jun 2025
Form 3File: Maa Chandika Nagar - Form 3 - September 2024.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: Maa Chandika Nagar - Disclosure - September 2024.pdf26 Jun 2025
Form 1File: Maa Chandika Nagar - Form 1 - June 2024.pdf26 Jun 2025
Form 2File: Maa Chandika Nagar - Form 2 - June 2024.pdf26 Jun 2025
Form 3File: Maa Chandika Nagar - Form 3 - June 2024.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: Maa Chandika Nagar - Disclosure - June 2024.pdf26 Jun 2025
Form 1File: Architect Certificate - March 2024.pdf26 Jun 2025
Form 2File: Engineer Certificate - March 2024.pdf26 Jun 2025
Form 3File: CA Certificate - March 2024_compressed (5).pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold - March 2024.pdf26 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - March 2024.pdf12 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Maa Chandika Nagar - Form 1 - June 2024.pdf12 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Maa Chandika Nagar - Form 1 - September 2024.pdf12 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Maa Chandika Nagar - Form 1- December 2024.pdf12 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - March 2024_compressed (5).pdf12 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Maa Chandika Nagar - Form 3 - June 2024_compressed.pdf12 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Maa Chandika Nagar - Form 3 - September 2024_compressed.pdf12 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Maa Chandika Nagar - Form 3 - December 2024_compressed.pdf12 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - March 2024.pdf12 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Maa Chandika Nagar - Form 2 - June 2024.pdf12 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Maa Chandika Nagar - Form 2 - September 2024.pdf12 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Maa Chandika Nagar - Form 2 - December 2024.pdf12 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold - March 2024.pdf12 Mar 2025
Disclosure of sold/ booked inventoryFile: Maa Chandika Nagar - Disclosure - June 2024.pdf12 Mar 2025
Disclosure of sold/ booked inventoryFile: Maa Chandika Nagar - Disclosure - September 2024.pdf12 Mar 2025
Disclosure of sold/ booked inventoryFile: Maa Chandika Nagar - Disclosure - December 2024.pdf12 Mar 2025
Other - TechnicalFile: Verification CC Maa Chandika.pdf7 Jan 2024
Other - TechnicalFile: Reply to Query.pdf1 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Maachandika Form 3 CA certificate.pdf18 Aug 2023
Layout approvalFile: Sanction Map.pdf8 Aug 2023
Building plan approval or NA orderFile: NA Order.pdf8 Aug 2023
PAN CardFile: Wasudeo Deshmukh PAN.pdf8 Aug 2023
Copy of the legal title reportFile: legal title report.pdf8 Aug 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate - Finance.pdf8 Aug 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate - Legal.pdf8 Aug 2023
Details of encumbrances concerned to LegalFile: Encumbrance Certificate - Finance.pdf8 Aug 2023
Details of encumbrances concerned to LegalFile: Encumbrance Certificate - Legal.pdf8 Aug 2023
Copy of Layout Approval (in case of layout)File: Sanction Map.pdf8 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: NA Order.pdf8 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: NA Order.pdf8 Aug 2023
Declaration about Commencement CertificateFile: Format D Declaration of CC.pdf8 Aug 2023
Declaration in FORM BFile: Form B - Maa Chandika Nagar.pdf8 Aug 2023
CERSAI detailsFile: CERSAI.pdf8 Aug 2023
CERSAI detailsFile: Self Declaration of CERSAI.pdf8 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Format A - Declaration of Interest in Other Organisation.pdf8 Aug 2023
Proforma of Agreement for saleFile: Draft Agreement to Sell.pdf8 Aug 2023
Proforma of Allotment letterFile: Allotment Letter.pdf8 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Bank Statement.pdf8 Aug 2023
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment Letter.pdf8 Aug 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to Model agreement.pdf8 Aug 2023

How this compares with Nagpur

57%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Maa Chandika Nagar on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Katol2,800+ in Nagpur

2 kmMaa Chandika NagarCompleted 4Other 8Dot size: filed unitsN

Filed coordinates, straight-line distance. 12 registered projects within 2 km.

Builder: Wasudeorao Anadrao Deshmukh

Wasudeorao Anadrao Deshmukh has 2 registrations on MahaRERA, including Maa Chandika Nagar and NEW CHANDIKA NAGARI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Maa Chandika Nagar is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Maa Chandika Nagar?

The registered promoter entity is Wasudeorao Anadrao Deshmukh, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Maa Chandika Nagar?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Maa Chandika Nagar?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Maa Chandika Nagar?

The professionals named in the filing: Architect: Ashish Khobraghade; Architect: Vaibhav Khadse; Engineer: Paresh Shelke; Engineer: Vaibhav Khadse; Chartered Accountant: Rishi Lashkare Lashkare; Chartered Accountant: Ravindra Lashkare. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Maa Chandika Nagar?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Maa Chandika Nagar. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Maa Chandika Nagar to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.