ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / M BARIA GRACE

Registered No litigation declared Others project

M BARIA GRACE

By MORESHWAR KRUSHNA BARIA

RG-MH-18220 · RERA P99000056216 · Last updated on MahaRERA portal: 1 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Internal walls, 80%
21 of 42Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

M BARIA GRACE is a Others project by MORESHWAR KRUSHNA BARIA in Palghar, Maharashtra, registered with MahaRERA as P99000056216 on 22 May 2024. Possession is promised by 31 Dec 2026. 21 of the 42 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameM BARIA GRACE
  • TypeOthers
  • Location
    • BHATI BUNDER ROAD
    • AGASHI
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401301
  • Pincode401301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000056216
  • ReraGenie IDRG-MH-18220

Builder

  • NameMORESHWAR KRUSHNA BARIA
  • Entity typeIndividual
  • Other registrations2 more →
  • Completed2 of 3

Key dates

this monthRegisteredMay 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 May 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed88 files

Current status

50%21 of 42 units booked
57.7%Work done, per cost certificate

Figures as on 1 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RESIDENTIALBLDGNA7742042

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.

RESIDENTIALBLDG: 43% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed15

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots15
Closed/Covered13
Open Space2

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,010 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Nov 2025

Approvals and building plan

Sanctioning authorityVVCMC
Permissible FSI1999.29
Proposed, not sanctioned1,923 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchM BARIA LAKE VIEW, OPP HANUMAN TEMPLE, BAZAR PETH, AGASHI NAGAR, TALUKA VASAI DIST PALGHAR, PIN 401
Estimated costRs 5.27 cr
Cost incurredRs 3.04 cr
Work done57.69%
BuildingWingEstimatedIncurred
RESIDENTIALBLDGNARs 5.19 crRs 3.04 cr
-NARs 8.90 lakh-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMEGHA KAMOTHI FERNANDES
EngineerPARESH UNNARKAR
EngineerPARESH RAMANIKLAL UNNARKAR
Chartered AccountantBRIJESH SAMPAT
Chartered AccountantBRIJESH DEVENDRA SAMPAT
Chartered AccountantMUKUND T PHADNIS
Chartered AccountantHBK & ASSOCIATES LLP
PartnerRole in project
MORESHWAR KRUSHNA BARIA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf1 Jun 2026
Withdrawal Update Form 2File: form 2 31032026.pdf1 Jun 2026
Withdrawal Update Form 3File: FORM 3 M BARIA GRACE 21052026.pdf1 Jun 2026
Withdrawal Update Form 1File: FORM 1 30122025.pdf25 Feb 2026
Withdrawal Update Form 1File: FORM 1 30122025.pdf25 Feb 2026
Withdrawal Update Form 2File: FORM 2 31122025.pdf25 Feb 2026
Withdrawal Update Form 2File: FORM 2 31122025.pdf25 Feb 2026
Withdrawal Update Form 3File: FORM 3 CA 10022026.pdf25 Feb 2026
Withdrawal Update Form 3File: FORM 3 CA 10022026.pdf25 Feb 2026
Form 1File: FORM 1 30122025.pdf24 Feb 2026
Form 2File: FORM 2 31122025.pdf24 Feb 2026
Form 3File: FORM 3 CA 10022026.pdf24 Feb 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE 10022026.pdf24 Feb 2026
Form 1File: FORM 1.pdf11 Nov 2025
Form 2File: FORM 2.pdf11 Nov 2025
Form 3File: FORM 3.pdf11 Nov 2025
Disclosure of Sold and Booked InventoryFile: INVENTORIES.pdf11 Nov 2025
Form 1File: FORM 1 30 06 2025.pdf29 Oct 2025
Form 2File: FORM 2 30 06 2025.pdf29 Oct 2025
Form 3File: FORM 3 C A 082025.pdf29 Oct 2025
Disclosure of Sold and Booked InventoryFile: INVENTORIES 3 7 25.pdf29 Oct 2025
Form 1File: FORM 1 2025.pdf20 Oct 2025
Form 2File: FORM 2025.pdf20 Oct 2025
Form 3File: FORM 3 C A 2024.pdf20 Oct 2025
Disclosure of Sold and Booked InventoryFile: Inventories 2025.pdf20 Oct 2025
Form 1File: FORM 1 11 11 2024.pdf19 Oct 2025
Form 2File: FORM 2 31 10 2024.pdf19 Oct 2025
Form 3File: FORM 3 C A 14 11 2024.pdf19 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE.pdf19 Oct 2025
Form 1File: FORM 1 2024.pdf19 Oct 2025
Form 2File: FORM 2 2024.pdf19 Oct 2025
Form 3File: FORM 3 C A 2024.pdf19 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE.pdf19 Oct 2025
Form 1File: FORM 1 2024.pdf19 Oct 2025
Form 2File: FORM 2 2024.pdf19 Oct 2025
Form 3File: FORM 3 C A 2024.pdf19 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE.pdf19 Oct 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE M BARIA GRACE 24042025.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 31032025.pdf19 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A QUALITY ASSURANCE FINANCIAL YEAR 2024 25.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE FORM 1 08042025.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE.pdf15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf8 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf8 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 2.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE FORM 1.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE FORM 3.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE FORM 1.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE FORM 3.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 2.pdf18 Nov 2024
Layout approvalFile: LAYOUT PLAN.pdf27 Jul 2024
Building plan approvalFile: TYPICAL FLOOR PLAN.pdf27 Jul 2024
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf27 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: TYPICAL FLOOR PLAN.pdf27 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: RDP 15072024.pdf27 Jul 2024
Details of encumbrances concerned to FinanceFile: UNDERTAKING FOR NO ENCUMBRANCE.pdf11 May 2024
Details of encumbrances concerned to FinanceFile: CONCERN TO LEGAL.pdf11 May 2024
Details of encumbrances concerned to LegalFile: UNDERTAKING FOR NO ENCUMBRANCE.pdf11 May 2024
Details of encumbrances concerned to LegalFile: CONCERN TO LEGAL.pdf11 May 2024
Commencement Certificates / NA Order for plotted developmentFile: C C ORDER.pdf11 May 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf11 May 2024
Other - LegalFile: s no 1 2 B Satbara.pdf11 May 2024
Other - LegalFile: pardi no 71 Satbara.pdf11 May 2024
Other - LegalFile: CONVEYANCE DEED.pdf11 May 2024
Other - LegalFile: ANNEXURE A.pdf11 May 2024
Other - LegalFile: ENCUMBRANCES.pdf11 May 2024
CERSAI detailsFile: UNDERTAKING OF NO CERSAI.pdf5 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE FORM 3.pdf5 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A DECLARATION ABOUT SEPARATE BANK.pdf5 May 2024
Details of encumbrances concerned to FinanceFile: CONCERN TO FINANCE.pdf27 Apr 2024
Details of encumbrances concerned to LegalFile: CONCERN TO FINANCE.pdf27 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf27 Apr 2024
Proforma of Agreement for saleFile: DRAFT AGREEMENT FOR SALE.pdf27 Apr 2024
Layout approvalFile: LAYOUT PLAN.pdf25 Apr 2024
Building plan approvalFile: GROUND AND 1ST TO 5TH FLOOR PLAN.pdf25 Apr 2024
Building plan approvalFile: SIXTH FLOOR PLAN.pdf25 Apr 2024
PAN CardFile: MORESHWAR BARIA - PAN CARD.pdf25 Apr 2024
Copy of the legal title reportFile: LEGAL TITLE REPORT FORMAT A.pdf25 Apr 2024
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf25 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: GROUND AND 1ST TO 5TH FLOOR PLAN.pdf25 Apr 2024

How this compares with Palghar

50%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep M BARIA GRACE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AGASHI3,200+ in Palghar

2 kmM BARIA GRACECompleted 7Lapsed / revoked 3Other 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 27 registered projects within 2 km.

Builder: MORESHWAR KRUSHNA BARIA

MORESHWAR KRUSHNA BARIA has 3 registrations on MahaRERA, including BLDG NO-1 M.BARIA EVEREST and M BARIA LAKE VIEW. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if M BARIA GRACE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of M BARIA GRACE?

The registered promoter entity is MORESHWAR KRUSHNA BARIA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in M BARIA GRACE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for M BARIA GRACE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at M BARIA GRACE?

The professionals named in the filing: Architect: MEGHA KAMOTHI FERNANDES; Engineer: PARESH UNNARKAR; Engineer: PARESH RAMANIKLAL UNNARKAR; Chartered Accountant: BRIJESH SAMPAT; Chartered Accountant: BRIJESH DEVENDRA SAMPAT; Chartered Accountant: MUKUND T PHADNIS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in M BARIA GRACE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About M BARIA GRACE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save M BARIA GRACE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.