LYCORIS AMIN CENTRE
By ABDUL RAHIMAN ZUBAIR AND DAYANAND SOMAPPA AMIN
RG-KA-14246 · RERA PRM/KA/RERA/1257/334/PR/110823/006159 · Last updated on RERA Karnataka portal: 9 Aug 2023
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
LYCORIS AMIN CENTRE is a Commercial project by ABDUL RAHIMAN ZUBAIR AND DAYANAND SOMAPPA AMIN in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/110823/006159 on 11 Aug 2023. Possession is promised by 31 Jan 2023.
At a glance
Project
- NameLYCORIS AMIN CENTRE
- TypeCommercial
- Location
- Mangalore
- Dakshina Kannada
- 574142
- Pincode574142
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1257/334/PR/110823/006159
- ReraGenie IDRG-KA-14246
Builder
- NameABDUL RAHIMAN ZUBAIR AND DAYANAND SOMAPPA AMIN
- Entity typeOther ( Other ( Joint Development (Joint Land owners/promoters) ) )
- Authorized SignatoryABDUL RAHIMAN ZUBAIR
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on11 Aug 2023
- Promised completion31 Jan 2023
- Revised completionNone
- Buildings1 building record
- Documents filed141 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| LYCORIS AMINS CENTRE | - | - | - | 0 | 20 | 20 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 9 Aug 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | - |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | - |
Progress on shared amenities40
As on 9 Aug 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | No | Not applicable |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | No | Not applicable |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | No | Not applicable |
| Open parking areas | Yes | - |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | - |
| Common storage spaces | No | Not applicable |
Land and ownership4
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Dayanand S Amin | - | - |
| Dayanand S Amin | - | - |
| Abdul Rahiman Zubair | - | - |
| Abdul Rahiman Zubair | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 7.26 cr | - |
| Payment of taxes | Rs 15.00 lakh | - |
| On-site expenditure-Consultants Fees | Rs 5.00 lakh | - |
| On-site expenditure-Site Overhead | Rs 2.50 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Naem Sarafuddin |
| Engineer | Akeel Hasan Alqamath |
| Chartered Accountant | KESHAVA NARSHA BALLAKURAYA |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed141
As listed on the registration, under the names the promoter filed them with; the newest 80 of 141 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/110823/006159 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Clarification on Promoter name should be as per section 2File: 1 Clarification on Promoter name should be as per section 2.pdf | 9 Aug 2023 |
| Form-1 CA CertificateFile: 2 Form-1 CA Certificate.pdf | 9 Aug 2023 |
| Bank Account ClarificationFile: 3 Bank Account Clarification.pdf | 9 Aug 2023 |
| EC Sy No 53 1989-2023File: 4 EC Sy No 53 1989-2023.pdf | 9 Aug 2023 |
| Conversion Order 370File: 5 Conversion Order 370.pdf | 9 Aug 2023 |
| Provisional Financials 2022-23File: 28 Provisional Financials 2022-23.pdf | 9 Aug 2023 |
| Khatha ExtractFile: 6 Khatha Extract.pdf | 9 Aug 2023 |
| Title DeedFile: 7 Title Deed.pdf | 9 Aug 2023 |
| Sale Deed in favour of Dayanand AminFile: 8 Sale Deed in favour of Dayanand Amin.pdf | 9 Aug 2023 |
| Sale Deed in favour of Abdul Rahiman ZubairFile: 9 Sale Deed in favour of Abdul Rahiman Zubair.pdf | 9 Aug 2023 |
| Clarification on ParkingFile: 10 Clarification on Parking.pdf | 9 Aug 2023 |
| CDP Master ExtractFile: 11 CDP Master Extract.pdf | 9 Aug 2023 |
| Clarification on Road WideningFile: 12 Clarification on Road Widening.pdf | 9 Aug 2023 |
| Clarification on KSPCB CFEFile: 13 Clarification on KSPCB CFE.pdf | 9 Aug 2023 |
| Clarification on OCFile: 14 Clarification on OC.pdf | 9 Aug 2023 |
| Engineer License AttestedFile: 15 Engineer License Attested.jpeg | 9 Aug 2023 |
| Clarification on Common AreaFile: 18 Clarification on Common Area.pdf | 9 Aug 2023 |
| Fire NOC NotarizedFile: 19 Fire NOC Notarized.pdf | 9 Aug 2023 |
| Form-2 Architect Certificate NotarizedFile: 20 Form-2 Architect Certificate Notarized.pdf | 9 Aug 2023 |
| Form-3 Engineer Certificate NotarizedFile: 21 Form-3 Engineer Certificate Notarized.pdf | 9 Aug 2023 |
| Form-6 Completed NotarizedFile: 22 Form-6 Completed Notarized.pdf | 9 Aug 2023 |
| Electricity NOC NotarizedFile: 23 Electricity NOC Notarized.pdf | 9 Aug 2023 |
| Sec 3(1) AffidavitFile: 24 Sec 3(1) Affidavit.pdf | 9 Aug 2023 |
| Septic Tank DesignFile: 25 Septic Tank Design.jpg | 9 Aug 2023 |
| Septic Tank DemarcationFile: 26 Septic Tank Demarcation.jpg | 9 Aug 2023 |
| new ZR MangaloreFile: 27 new ZR Mangalore.pdf | 9 Aug 2023 |
| Provisional Financials 2022-23File: 28 Provisional Financials 2022-23.pdf | 9 Aug 2023 |
| MR CopyFile: 29 MR Copy.png | 9 Aug 2023 |
| CLARIFICATION ABOUT SOLD AND UNSOLD UNIT DETAILSFile: CLARIFICATION ABOUT SOLD AND UNSOLD UNIT DETAILS.pdf | 9 Aug 2023 |
| Clarification on Promoter name should be as per section 2File: 1 Clarification on Promoter name should be as per section 2.pdf | 2 Aug 2023 |
| Form-1 CA CertificateFile: 2 Form-1 CA Certificate.pdf | 2 Aug 2023 |
| Bank Account ClarificationFile: 3 Bank Account Clarification.pdf | 2 Aug 2023 |
| EC Sy No 53 1989-2023File: 4 EC Sy No 53 1989-2023.pdf | 2 Aug 2023 |
| Conversion Order 370File: 5 Conversion Order 370.pdf | 2 Aug 2023 |
| Khatha ExtractFile: 6 Khatha Extract.pdf | 2 Aug 2023 |
| Title DeedFile: 7 Title Deed.pdf | 2 Aug 2023 |
| Sale Deed in favour of Dayanand AminFile: 8 Sale Deed in favour of Dayanand Amin.pdf | 2 Aug 2023 |
| Sale DeedFile: 9 Sale Deed.pdf | 2 Aug 2023 |
| Clarification on ParkingFile: 10 Clarification on Parking.pdf | 2 Aug 2023 |
| CDP Master ExtractFile: 11 CDP Master Extract.pdf | 2 Aug 2023 |
| Clarification on Road WideningFile: 12 Clarification on Road Widening.pdf | 2 Aug 2023 |
| Clarification on KSPCB CFEFile: 13 Clarification on KSPCB CFE.pdf | 2 Aug 2023 |
| Clarification on OCFile: 14 Clarification on OC.pdf | 2 Aug 2023 |
| Engineer License AttestedFile: 15 Engineer License Attested.jpeg | 2 Aug 2023 |
| CLARIFICATION ABOUT SOLD AND UNSOLD UNIT DETAILSFile: 16 CLARIFICATION ABOUT SOLD AND UNSOLD UNIT DETAILS.pdf | 2 Aug 2023 |
| Clarification on Common AreaFile: 18 Clarification on Common Area.pdf | 2 Aug 2023 |
| Fire NOC NotarizedFile: 19 Fire NOC Notarized.pdf | 2 Aug 2023 |
| Form-2 Architect Certificate NotarizedFile: 20 Form-2 Architect Certificate Notarized.pdf | 2 Aug 2023 |
| Form-3 Engineer Certificate NotarizedFile: 21 Form-3 Engineer Certificate Notarized.pdf | 2 Aug 2023 |
| Form-6 Completed NotarizedFile: 22 Form-6 Completed Notarized.pdf | 2 Aug 2023 |
| Electricity NOC NotarizedFile: 23 Electricity NOC Notarized.pdf | 2 Aug 2023 |
| Sec 3(1) AffidavitFile: 24 Sec 3(1) Affidavit.pdf | 2 Aug 2023 |
| Septic Tank DesignFile: 25 Septic Tank Design.jpg | 2 Aug 2023 |
| Septic Tank DemarcationFile: 26 Septic Tank Demarcation.jpg | 2 Aug 2023 |
| new ZR MangaloreFile: 27 new ZR Mangalore.pdf | 2 Aug 2023 |
| RTC, survey 53/6F(P) | - |
| Mutation, survey 53/6F(P) | - |
| Encumbrance Certificate, survey 53/6F(P) | - |
| Conversion/Alienation Order, survey 53/6F(P) | - |
| Sale/Title/Gift Deed, survey 53/6F(P) | - |
| Khatha, survey 53/6F(P) | - |
| RTC, survey 53/6E2 | - |
| Mutation, survey 53/6E2 | - |
| Encumbrance Certificate, survey 53/6E2 | - |
| Conversion/Alienation Order, survey 53/6E2 | - |
| Sale/Title/Gift Deed, survey 53/6E2 | - |
| Khatha, survey 53/6E2 | - |
| RTC, survey 53/6F(P) | - |
| Mutation, survey 53/6F(P) | - |
| Encumbrance Certificate, survey 53/6F(P) | - |
| Conversion/Alienation Order, survey 53/6F(P) | - |
| Sale/Title/Gift Deed, survey 53/6F(P) | - |
| JDA, survey 53/6F(P) | - |
| Khatha, survey 53/6F(P) | - |
| RTC, survey 53/6E2 | - |
| Mutation, survey 53/6E2 | - |
| Encumbrance Certificate, survey 53/6E2 | - |
| Conversion/Alienation Order, survey 53/6E2 | - |
| Sale/Title/Gift Deed, survey 53/6E2 | - |
| JDA, survey 53/6E2 | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Dakshina Kannada
Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.
Keep LYCORIS AMIN CENTRE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dakshina Kannada620+ in Dakshina Kannada
FORTUNE GALAXY
FORTUNE PROMOTERS
SUNSHINE SAPLING
SAPLING MULTI VENTURES PRIVATE LIMITED
ROHAN CITY
ROHAN CORPORATION INDIA PRIVATE LIMITED
Bearys Turning Point
Bearys Properties and Developments Private
YAMUNA SKY CITY
YAMUNA HOMES AND DESIGN PRIVATE LIMITED
The Marian Park
Marian Projects Pvt Ltd
See every Dakshina Kannada project, with the district possession charts
Builder: ABDUL RAHIMAN ZUBAIR AND DAYANAND SOMAPPA AMIN
ABDUL RAHIMAN ZUBAIR AND DAYANAND SOMAPPA AMIN has 1 registration on RERA Karnataka, including LYCORIS AMIN CENTRE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.
Frequently asked questions
What are my rights if LYCORIS AMIN CENTRE is delayed beyond 31 Jan 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of LYCORIS AMIN CENTRE?
The registered promoter entity is ABDUL RAHIMAN ZUBAIR AND DAYANAND SOMAPPA AMIN, an other ( other ( joint development (joint land owners/promoters) ) ) as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in LYCORIS AMIN CENTRE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at LYCORIS AMIN CENTRE?
The professionals named in the filing: Architect: Naem Sarafuddin; Engineer: Akeel Hasan Alqamath; Chartered Accountant: KESHAVA NARSHA BALLAKURAYA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in LYCORIS AMIN CENTRE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.