Home / Browse projects / Gandhinagar, Gujarat / LUXURIA 2

Valid until 30 Jun 2027 Residential/Group Housing project

LUXURIA 2

By SHRINIVAS ORGANISORS PRIVATE LIMITED

RG-GJ-85157 · RERA PR/GJ/GANDHINAGAR/KALOL/AUDA/RAA08994/EX1/150726/300627 · Last updated on GujRERA portal: 4 Jul 2026

Source: official GujRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Nothing verified clear yet
Jun 2027Possession promisedmoved 12 months from the original
72 of 81Construction stages doneacross 9 buildings; furthest along: Installation of lifts, 90%
201 of 408Units unsoldnot recorded sold or booked
Jump to the 50 documents Report an error

LUXURIA 2 is a Residential/Group Housing project by SHRINIVAS ORGANISORS PRIVATE LIMITED in Gandhinagar, Gujarat, registered with GujRERA as PR/GJ/GANDHINAGAR/KALOL/AUDA/RAA08994/EX1/150726/300627 on 7 Sep 2021. Possession is promised by 30 Jun 2027. The completion date has moved by 12 months from the original filing. 207 of the 408 units on this registration are recorded sold or booked, and 72 of 81 construction stages are filed complete.

At a glance

Project

  • NameLUXURIA 2
  • TypeResidential/Group Housing
  • Location
    • LUXURIA 2 SUPERCITY
    • BHADAJ DENTAL COLLEGE ROAD NR SCINCE CITY
    • Kalol
    • Gandhinagar
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR/GJ/GANDHINAGAR/KALOL/AUDA/RAA08994/EX1/150726/300627
  • ReraGenie IDRG-GJ-85157

Builder

  • NameSHRINIVAS ORGANISORS PRIVATE LIMITED
  • Entity typeCOMPANY
  • Other registrations13 more →
  • Past their filed date8

Key dates

this monthRegisteredSep 2021First promiseJun 2026Revised toJun 2027

Key facts

Registration and timeline

  • StatusValid until 30 Jun 2027
  • Registered on7 Sep 2021
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 30 Jun 2026)
  • Buildings9 building records
  • Documents filed50 files

Current status

51%207 of 408 units booked
99.9%Of the estimated cost spent so far

Figures as on 4 Jul 2026, this project's latest GujRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOCK A---36036
BLOCK B---36036
BLOCK C---48048
BLOCK D---48048
BLOCK E---48048
BLOCK F---48048
BLOCK G---48048
BLOCK H---48048
BLOCK I---48048

The full filing

Everything below is from the project's own GujRERA filing, free to read.

Construction progress by building9

As on 4 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

72 of 81 construction stages are filed complete across 9 buildings. The stage furthest along is Installation of lifts, at 90%.

BLOCK A99%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing90%
BLOCK B99%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing90%
BLOCK C99%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing90%
BLOCK D99%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing90%
BLOCK E99%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing90%
BLOCK F99%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing90%
BLOCK G99%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing90%
BLOCK H99%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing90%
BLOCK I99%
ActivityProgress
Excavation100%
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, internal plaster, floorings, doors and windows within flats100%
Sanitary fittings within the flats100%
Staircases, lift wells and lobbies at each floor level, overhead and underground water tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing100%
Installation of lifts, water pumps, fire fighting fittings, electrical fittings and finishing90%

Progress on shared amenities19

As on 4 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal roads and footpathsYes90%
Water supplyYes60%
Sewerage (chamber, lines, septic tank, STP)Yes60%
Storm water drainsYes50%
Landscaping and tree plantingYes50%
Street lightingYes70%
Community buildingsYes70%
Treatment and disposal of sewage and sullage waterYes60%
Solid waste management and disposalNoNot applicable
Water conservation, rain water harvestingYes70%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationYes70%
Fire fightingYes70%
Drinking water facilitiesYes70%
Emergency evacuationNoNot applicable
Use of renewable energyYes70%
SecurityYes70%
Letter boxYes20%

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area20,791 sq m

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountNot declared
Estimated costRs 162.75 cr
Cost incurredRs 162.64 cr
Spent of the estimate99.93%
BuildingWingEstimatedIncurred
BLOCK BNARs 20.05 crRs 20.00 cr
BLOCK ANARs 20.05 crRs 20.00 cr
BLOCK INARs 19.59 crRs 19.59 cr
BLOCK CNARs 19.59 crRs 19.59 cr
BLOCK DNARs 16.76 crRs 16.75 cr
BLOCK ENARs 16.76 crRs 16.75 cr
BLOCK FNARs 16.76 crRs 16.75 cr
BLOCK GNARs 16.60 crRs 16.60 cr
BLOCK HNARs 16.60 crRs 16.60 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSOURABH AJAY VERMA
EngineerNARESH K SHAH

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR/GJ/GANDHINAGAR/KALOL/AUDA/RAA08994/EX1/150726/300627Applied May 2026; approved Jul 2026

Documents filed50

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PR/GJ/GANDHINAGAR/KALOL/AUDA/RAA08994/EX1/150726/300627 on the GujRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer's certificate (Form 2)4 Jul 2026
Engineer's certificate annexure4 Jul 2026
Accountant's certificate (Form 3)4 Jul 2026
Architect's certificate (Form 1)2 Jul 2026
Site photograph, BLOCK A1 Jul 2026
Site photograph, BLOCK B1 Jul 2026
Site photograph, BLOCK C1 Jul 2026
Site photograph, BLOCK D1 Jul 2026
Site photograph, BLOCK E1 Jul 2026
Site photograph, BLOCK F1 Jul 2026
Site photograph, BLOCK G1 Jul 2026
Site photograph, BLOCK H1 Jul 2026
Site photograph, BLOCK I1 Jul 2026
RERA registration certificate7 Sep 2021
Extension certificate-
Proforma agreement for sale-
Auditor's report (1 of 3)-
Auditor's report (2 of 3)-
Auditor's report (3 of 3)-
Income tax return (1 of 3)-
Income tax return (2 of 3)-
Income tax return (3 of 3)-
Project specific document-
Directors' report (1 of 3)-
Directors' report (2 of 3)-
Directors' report (3 of 3)-
Commencement certificate-
Approved sanctioned plan-
Approved layout plan-
Agreement-
Land location-
Encumbrance certificate-
Area development document-
Proforma allotment letter-
Brochure-
Project related document-
Declaration in Form B-
Title clearance certificate-
Title report-
Property card-
Project photograph-
Audited balance sheet (1 of 3)-
Audited balance sheet (2 of 3)-
Audited balance sheet (3 of 3)-
Audited profit and loss statement (1 of 3)-
Audited profit and loss statement (2 of 3)-
Audited profit and loss statement (3 of 3)-
Cash flow statement (1 of 3)-
Cash flow statement (2 of 3)-
Cash flow statement (3 of 3)-

How this compares with Gandhinagar

51%of this project is bookeddistrict median 53%
16%of Gandhinagar projects moved their completion datethis one moved by 12 months

Computed across the 1,600+ Gandhinagar projects on ReraGenie, from their own filings.

Keep LUXURIA 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Gandhinagar1,600+ in Gandhinagar

2 kmLUXURIA 2Other 15Dot size: filed unitsN

Filed coordinates, straight-line distance. 15 registered projects within 2 km.

Builder: SHRINIVAS ORGANISORS PRIVATE LIMITED

SHRINIVAS ORGANISORS PRIVATE LIMITED has 14 registrations on GujRERA, including SUPER CITY PHASE 1 and SUPER CITY PHASE 2 DREAM. Read the full track record. See more projects on the Gandhinagar district page.

Frequently asked questions

What are my rights if LUXURIA 2 is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with GujRERA.

How do I verify and contact the developer of LUXURIA 2?

The registered promoter entity is SHRINIVAS ORGANISORS PRIVATE LIMITED, a company as per the filing. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's GujRERA listing and in its filed documents.

Is my payment protected in LUXURIA 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at LUXURIA 2?

The professionals named in the filing: Architect: SOURABH AJAY VERMA; Engineer: NARESH K SHAH. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LUXURIA 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on GujRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LUXURIA 2. Everything on this page comes from what the promoter filed on GujRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LUXURIA 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.