Home / Browse projects / Mumbai Suburban, Maharashtra / Lotus Residency

Completed No litigation declared Others project

Lotus Residency

By Lotus Logistics and Developers pvt ltd

RG-MH-24936 · RERA P51800006322 · Last updated on MahaRERA portal: 1 Feb 2025

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 42 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
3 of 11Construction stages donefurthest along: Stilt Floor, 90%
2Complaints at MahaRERAon this registration
Jump to the 104 documents Report an error

Lotus Residency is a Others project by Lotus Logistics and Developers pvt ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800006322 on 14 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2024. The completion date has moved by 42 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameLotus Residency
  • TypeOthers
  • Location
    • .
    • Mumbai
    • Mumbai Suburban
    • 400104
  • Pincode400104
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800006322
  • ReraGenie IDRG-MH-24936

Builder

  • NameLotus Logistics and Developers pvt ltd
  • Entity typeCompany
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects9 →

Key dates

this monthRegisteredAug 2017First promiseJun 2021Revised toDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Aug 2017
  • Promised completion31 Dec 2024
  • Revised completionRevised to 31 Dec 2024 (originally 30 Jun 2021)
  • Buildings1 building record
  • Documents filed104 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Lotus ResidencyNA250000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 90%.

Lotus Residency: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 1 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed112

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots112
Closed/Covered112

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,465 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Kedarnath dubey, Mahendra prasad, Virendra PrasadMumbai CityMumbai City
Sudha Rajendra Surendra Upendra dubeyMumbai CityMumbai City

Approvals and building plan

Permissible FSI15440.0
Proposed, not sanctioned10,730 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchThe Amaltas Co op Hsg soc ltd juhu versova Link Road ward k west Andheri west mumbai - 400049

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSnehal Shah
EngineerUday Chande
Chartered AccountantCAS & Co
PartnerRole in project
Lotus Logistics and Developers pvt ltd-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800010148Jun 2021 → Jun 2022

Reason as filed by the promoterThe Company is developing Lotus Residency Project located at Plot Bearing No / CTS no 135/B, 137, 137/1 to 7, 136/1, 136/2 of Village Goregaon, Oshiware District Centre, Mumbai as per the approvals obtained from MMRDA dt 28-07-2015 and registered with your office vide certificate dated 14-08- 2017. We have completed construction till 11th slab of A and B wings and also completed brick work up to 9th floor as per the approved plan vide architect certificate dated 7th July 2020 (Copy Attached). Meantime, the Company also applied for sanction of the balance additional FSI i.e. 2543.13 square mete

EXT51800013171Jun 2021 → Dec 2024

Reason as filed by the promoterRespected Ma'am / Sir We hereby apply for an extension of registration of the following project: “Lotus Residency” registered under Maharashtra Real Estate Regulatory Authority (“MahaRERA”) bearing Project Registration No: P51800006322 (“said Project”), by the promoter, Lotus Logistics and Developers Private Limited (“Applicant”) which expires on 30th December 2022. We state that we have faced a delay in completing the said Project as a result of the following reasons: (i) Delay in payments by allottees leading to burden on cashflows of the said Project; (ii) Given that the Applicant decided n

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12501880Tanveer Ainuddin ShaikhLotus Logistics and Developers pvt ltd09/06/2025
CC12503631Lotus Residency Coop Hsg SocietyLotus Logistics and Developers pvt ltd12/10/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Apr 2024

Documents filed104

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: LR CHSL_Society Registration Certificate.pdf1 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Lotus OC 29 Feb 2024.pdf29 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: LOTUS OC Application.pdf20 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: Lotus CC dtd 21 apr 2023.pdf24 Apr 2023
Building plan approvalFile: LR Approved Plan_02 Jan 2023_compress_Part1.pdf15 Feb 2023
Building plan approvalFile: LR Approved Plan_02 Jan 2023_compress_Part2.pdf15 Feb 2023
Building plan approvalFile: LR Approved Plan_02 Jan 2023_compress_Part3.pdf15 Feb 2023
Building plan approvalFile: LR Approved Plan_02 Jan 2023_compress_Part4.pdf15 Feb 2023
Building plan approvalFile: LR Approved Plan_02 Jan 2023_compress_Part5.pdf15 Feb 2023
Building plan approvalFile: LR Approved Plan_02 Jan 2023_compress_Part6.pdf15 Feb 2023
Building plan approvalFile: LR Approved Plan_02 Jan 2023_compress_Part7.pdf15 Feb 2023
Building Plan Approval (IOD)File: LR Approved Plan_02 Jan 2023_compress_Part1.pdf15 Feb 2023
Building Plan Approval (IOD)File: LR Approved Plan_02 Jan 2023_compress_Part2.pdf15 Feb 2023
Building Plan Approval (IOD)File: LR Approved Plan_02 Jan 2023_compress_Part3.pdf15 Feb 2023
Building Plan Approval (IOD)File: LR Approved Plan_02 Jan 2023_compress_Part4.pdf15 Feb 2023
Building Plan Approval (IOD)File: LR Approved Plan_02 Jan 2023_compress_Part5.pdf15 Feb 2023
Building Plan Approval (IOD)File: LR Approved Plan_02 Jan 2023_compress_Part6.pdf15 Feb 2023
Building Plan Approval (IOD)File: LR Approved Plan_02 Jan 2023_compress_Part7.pdf15 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: CC02012023.pdf15 Feb 2023
Proforma of Agreement for saleFile: AFS_Lotus Residency_Goregaon.pdf24 Jan 2023
Proforma of Allotment letterFile: AFS_Lotus Residency_Goregaon.pdf24 Jan 2023
Deviation Report with respect to Allotment letterFile: RERA_Deviation_Report_Lotus_Residency-compressed.pdf24 Jan 2023
Deviation Report with respect to model copy of AgreementFile: RERA_Deviation_Report_Lotus_Residency-compressed.pdf24 Jan 2023
Proforma of Agreement for saleFile: AFS_Lotus Residency.pdf21 Jan 2023
Proforma of Allotment letterFile: AFS_Lotus Residency.pdf21 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf19 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf17 Jan 2023
Certificates of CA (Form 3)File: LR_CA_Form3_31122022.pdf14 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LR_Engineer Certifiacate_31122022.pdf12 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: LR_Form 2A_Q-3_2022-23.pdf12 Jan 2023
Details of encumbrances concerned to FinanceFile: PNBHFL_No Dues Certificate.pdf4 Jan 2023
Details of encumbrances concerned to LegalFile: PNBHFL_No Dues Certificate.pdf4 Jan 2023
Declaration about Commencement CertificateFile: CC Declaration_0001.pdf4 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QUALITY ASSURANCE Q-1.pdf4 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QUALITY ASSURANCE Q-2.pdf4 Jan 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory_0001.pdf4 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LR_Architect Certificate_15-11-2022.pdf2 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LR_Engineer Certificate_.pdf2 Jan 2023
Certificates of CA (Form 3)File: LR_CA Certificate_30-09-2022.pdf2 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form_5_2021_2022.pdf27 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form_5_2021_2022.pdf27 Dec 2022
CERSAI detailsFile: LR Cersai Details - IDBI.pdf26 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QUALITY ASSURANCE FY 2021-22.pdf16 Dec 2022
Building plan approvalFile: LR AMENDED PLAN_27-OCT-2022_Part1.pdf26 Nov 2022
Building plan approvalFile: LR AMENDED PLAN_27-OCT-2022_Part2.pdf26 Nov 2022
Building plan approvalFile: LR AMENDED PLAN_27-OCT-2022_Part3.pdf26 Nov 2022
Building plan approvalFile: LR AMENDED PLAN_27-OCT-2022_Part4.pdf26 Nov 2022
Building plan approvalFile: LR AMENDED PLAN_27-OCT-2022_Part5.pdf26 Nov 2022
Building plan approvalFile: LR AMENDED PLAN_27-OCT-2022_Part6.pdf26 Nov 2022
Building plan approvalFile: LR AMENDED PLAN_27-OCT-2022_Part7.pdf26 Nov 2022
Building plan approvalFile: LR AMENDED PLAN_27-OCT-2022_Part8.pdf26 Nov 2022
Layout approvalFile: LR Layout PLAN_27-OCT-2022.pdf26 Nov 2022
Copy of Layout Approval (in case of layout)File: LR Layout PLAN_27-OCT-2022.pdf26 Nov 2022
Building Plan Approval (IOD)File: LR AMENDED PLAN_27-OCT-2022_Part1.pdf26 Nov 2022
Building Plan Approval (IOD)File: LR AMENDED PLAN_27-OCT-2022_Part2.pdf26 Nov 2022
Building Plan Approval (IOD)File: LR AMENDED PLAN_27-OCT-2022_Part3.pdf26 Nov 2022
Building Plan Approval (IOD)File: LR AMENDED PLAN_27-OCT-2022_Part4.pdf26 Nov 2022
Building Plan Approval (IOD)File: LR AMENDED PLAN_27-OCT-2022_Part5.pdf26 Nov 2022
Building Plan Approval (IOD)File: LR AMENDED PLAN_27-OCT-2022_Part6.pdf26 Nov 2022
Building Plan Approval (IOD)File: LR AMENDED PLAN_27-OCT-2022_Part7.pdf26 Nov 2022
Building Plan Approval (IOD)File: LR AMENDED PLAN_27-OCT-2022_Part8.pdf26 Nov 2022
Proforma of Agreement for saleFile: AFS - RERA - Lotus Residency.pdf26 Nov 2022
Proforma of Allotment letterFile: AFS - RERA - Lotus Residency - Goregaon - 29-10-2022 -Rev.pdf31 Oct 2022
Proforma of Allotment letterFile: AFS - RERA - Lotus Residency - Goregaon - 29-10-2022 -Rev.pdf31 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: LR CC 10-27-2022.pdf28 Oct 2022
Proforma of Allotment letterFile: AFS - Lotus Residency__.pdf23 Dec 2021
Building plan approvalFile: AMENDED APPROVED PLAN_18 AUGUST 2021_Part1.pdf15 Dec 2021
Building plan approvalFile: AMENDED APPROVED PLAN_18 AUGUST 2021_Part2.pdf15 Dec 2021
Building plan approvalFile: AMENDED APPROVED PLAN_18 AUGUST 2021_Part3.pdf15 Dec 2021
Details of encumbrancesFile: Release reconveyance deed.pdf15 Dec 2021
Details of encumbrancesFile: IDBI Mortgage cum Hypothecation Deed.pdf15 Dec 2021
Building Plan Approval (IOD)File: AMENDED APPROVED PLAN_18 AUGUST 2021_Part1.pdf15 Dec 2021
Building Plan Approval (IOD)File: AMENDED APPROVED PLAN_18 AUGUST 2021_Part2.pdf15 Dec 2021
Building Plan Approval (IOD)File: AMENDED APPROVED PLAN_18 AUGUST 2021_Part3.pdf15 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: CC 18082021.pdf15 Dec 2021
Declaration about Commencement CertificateFile: Declaration about CC_Lotus Residency (Format D).pdf26 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form2A 2019-20.pdf26 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2020-21.pdf26 Aug 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold details.pdf26 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 LLDPL - LR 2018-2019.pdf26 Aug 2021

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Lotus Heightstank road extension of shankar lane Malad west mumbai30CompletedDec 2016Sep 2016
Metropolisplot no 5 6 7 sector 14 taloja panchnand navi mumbai90CompletedApr 2014Apr 2013
Lotus Partplot no b18 b19 road no 16 wagela industrial estate thane west6CompletedOct 2013Oct 2013
Feathersplot no 113 sector 14 taloja panchnand navi mumbai113CompletedApr 2013Apr 2013
Acropolisplot no 28 sector 6 palm beach nerul navi mumbai52CompletedNov 2011Nov 2011
GlomaxPlot no 17 18 19 sector 2 kharghar navi mumbai249CompletedJun 2011Late, May 2012
Balaji Towerplot no 60 jaisukhlal mehta road santacruz west22CompletedApr 2011Apr 2010

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 42 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Lotus Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near .6,700+ in Mumbai Suburban

2 kmLotus ResidencyCompleted 155Lapsed / revoked 83Abeyance 1Other 150Dot size: filed unitsN

Filed coordinates, straight-line distance. 389 registered projects within 2 km.

Builder: Lotus Logistics and Developers pvt ltd

Lotus Logistics and Developers pvt ltd has 2 registrations on MahaRERA, including Lotus Residency and Lotus Sky Garden. Its filings disclose 9 earlier MahaRERA projects: declares 8 of 9 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Lotus Residency is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Lotus Residency?

The registered promoter entity is Lotus Logistics and Developers pvt ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Lotus Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Lotus Residency?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Lotus Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Lotus Residency?

The professionals named in the filing: Architect: Snehal Shah; Engineer: Uday Chande; Chartered Accountant: CAS & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Lotus Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Lotus Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Lotus Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.