ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Liana D

Completed No litigation declared Residential / Group Housing project

Liana D

By LODHA DEVELOPERS LIMITED

RG-MH-37661 · RERA P51700046119 · Last updated on MahaRERA portal: 1 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 178 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Aug 2026Possession promisedregistration recorded completed
4 of 11Construction stages donefurthest along: Internal walls, 91%
10 of 140Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

Liana D is a Residential / Group Housing project by LODHA DEVELOPERS LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700046119 on 20 Jun 2022. The registration is recorded completed; possession was promised by 31 Aug 2026. 130 of the 140 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameLiana D
  • TypeResidential / Group Housing
  • Location
    • Mangaon
    • Kalyan
    • Thane
    • 421203
  • Pincode421203
  • RERA no.P51700046119
  • ReraGenie IDRG-MH-37661

Builder

  • NameLODHA DEVELOPERS LIMITED
  • Entity typeCompany
  • CINL45200MH1995PLC093041
  • GSTIN27AAACL1490J1ZG
  • MdAbhishek Mangalprabhat Lodha
  • Other registrations178 more →
  • Completed16 of 179
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date3
  • Declared earlier projects22 →

Key dates

this monthRegisteredJun 2022PromisedAug 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on20 Jun 2022
  • Promised completion31 Aug 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed73 files

Current status

93%130 of 140 units booked
99.3%Work done, per cost certificate

Figures as on 1 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Liana DNA24241400140

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 91%.

Liana D: 67% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises91%
Sanitary Fittings within the flats / premises58%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks83%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 1 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes50%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed199

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots199
Closed/Covered199

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,347 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Sep 2025

Approvals and building plan

Sanctioning authorityDirectorate of Town Planning & Valuation, Thane
Permissible FSI9958.42
Proposed, not sanctioned9,958 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCommercial Branch Mumbai
Estimated costRs 50.78 cr
Cost incurredRs 50.41 cr
Work done99.28%
BuildingWingEstimatedIncurred
Liana DNARs 33.01 crRs 32.77 cr
-NARs 17.77 crRs 17.64 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVILAS DESAI & ASSOCIATES
ArchitectPradeep Kamble
EngineerDadaso Gavali
EngineerMEHUL SHAH
Chartered AccountantChirag Sarvaiya & Co
Chartered AccountantM S K A & Associates
PartnerRole in project
LODHA DEVELOPERS LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Jun 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Liana D - Full OC - 11-05-2026.pdf1 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A - Liana D - P51700046119.pdf23 Jun 2026
Layout approvalFile: layout.pdf1 Jun 2026
Building plan approvalFile: Sheet No 11.pdf1 Jun 2026
Building plan approvalFile: Sheet No 12.pdf1 Jun 2026
Building plan approvalFile: Sheet No 13.pdf1 Jun 2026
Withdrawal Update Form 1File: Form1- Liana D - P51700046119.pdf27 Apr 2026
Withdrawal Update Form 2File: Form 02 Signed.pdf27 Apr 2026
Withdrawal Update Form 3File: Liana D Mar 2026 - Form 03 Signed.pdf27 Apr 2026
Withdrawal Update Form 1File: Form-1 Liana D- Dec-25.pdf27 Jan 2026
Withdrawal Update Form 2File: Liana D Form 02 Signed Dec 25.pdf27 Jan 2026
Withdrawal Update Form 3File: Liana D Form 03 Signed Dec 25.pdf27 Jan 2026
Layout approvalFile: Liana - Cluster 15 03 Wing D - converted.pdf25 Nov 2025
Withdrawal Update Form 1File: Liana D.pdf1 Nov 2025
Withdrawal Update Form 2File: Form 2 - Liana D - Sep 25.pdf1 Nov 2025
Withdrawal Update Form 3File: Form 03 - Liana D - Sep 25 signed.pdf1 Nov 2025
Form 5 (FY 2024-2025)File: Liana C and D.pdf14 Oct 2025
Form 2A (FY 2024-2025)File: Liana D - P51700046119 - Form 2A.pdf25 Jul 2025
Form 1File: Liana D - Form1 - June 25 - P51700046119-ok.pdf18 Jul 2025
Form 2File: Form 2 - Liana D - June-25.pdf18 Jul 2025
Form 3File: Form 3 - Liana D - June-25.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold - June-25.pdf18 Jul 2025
Self-declaration of Quarterly ProgressFile: updated CC.pdf18 Jul 2025
OthersFile: Layout Liana - Cluster 15 03 Wing D.pdf18 Jul 2025
Form 1File: Form1-Liana D -March 25.pdf20 Jun 2025
Form 2File: Signed Form 2 Liana D March 2025.pdf20 Jun 2025
Form 3File: Signed Form 3 Liana D March 2025.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: Signed Sold-Unsold_Liana D March 2025.pdf20 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Liana D.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Liana D Dec 2024.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Form 2 Liana D Dec 2024.pdf25 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold_Liana D Dec 2024.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Liana D.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Liana D Sep 2024.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Form 2 Liana D Sep 2024.pdf3 Jan 2025
Disclosure of sold/ booked inventoryFile: Signed Sold-Unsold_Liana D Sep 2024.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Liana D.pdf4 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: P51700046119 - Liana D.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Liana D - P51700046119.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Liana D - P51700046119 - Form1 - June24.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: Liana D - P51700046119 - June24.pdf7 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Liana D - P51700046119 - March 24.pdf28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Liana D - P51700046119 - March 24.pdf7 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Liana D - P51700046119 - Dec23.pdf27 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 - Liana D - P51700046119 - Dec23.pdf26 Feb 2024
Disclosure of sold/ booked inventoryFile: Liana D - P51700046119.pdf7 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Liana D - Form1 - Sep23.pdf21 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Liana D.pdf16 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold-Unsold_Liana D.pdf26 May 2023
Disclosure of sold/ booked inventoryFile: Sold-Unsold_Liana D.pdf20 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Liana D.pdf7 Nov 2022
Details of encumbrancesFile: Liana D.pdf30 Jul 2022
CERSAI detailsFile: CERSAI-Immovable 1.pdf30 Jul 2022
CERSAI detailsFile: CERSAI-Immovable 2.pdf30 Jul 2022
CERSAI detailsFile: CERSAI-Immovable 3.pdf30 Jul 2022
CERSAI detailsFile: CERSAI-Immovable 4.pdf30 Jul 2022
Layout approvalFile: Survey No Marking.pdf18 Jun 2022
Copy of Layout Approval (in case of layout)File: Survey No Marking.pdf18 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Liana D.pdf18 Jun 2022
Building plan approvalFile: Building Plan.pdf16 Jun 2022
Layout approvalFile: Premier layout For Upload.pdf16 Jun 2022
Layout approvalFile: Liana D Layout 2.pdf16 Jun 2022
Copy of Layout Approval (in case of layout)File: Premier layout For Upload.pdf16 Jun 2022
Copy of Layout Approval (in case of layout)File: Liana D Layout 2.pdf16 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf16 Jun 2022
Declaration in FORM BFile: Form b.pdf15 Jun 2022
PAN CardFile: Macrotech Developers Ltd PAN CARD.pdf14 Jun 2022
Copy of the legal title reportFile: Premier Title Report-Liana D-020322.pdf14 Jun 2022
Details of encumbrancesFile: Liana D-Encum.pdf14 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf14 Jun 2022
Declaration about Commencement CertificateFile: CC Decl -Liana D.pdf14 Jun 2022
CERSAI detailsFile: Cersai Liana D.pdf14 Jun 2022
Proforma of Allotment letterFile: Sale Agreement and Allotment Letter.pdf14 Jun 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
LODHA PARKP51900001339.2,210Jul 2017CompletedDec 2023Registered original: Dec 2021Feb 2022

How this compares with Thane

93%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Liana D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mangaon7,600+ in Thane

Builder: LODHA DEVELOPERS LIMITED

LODHA DEVELOPERS LIMITED has 179 registrations on MahaRERA, including Lodha Adrina and Mhatre Compound. Its filings disclose 22 earlier MahaRERA projects: declares 9 of 10 past projects completed on time. Litigation is declared on 39 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Liana D is delayed beyond 31 Aug 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Liana D?

The registered promoter entity is LODHA DEVELOPERS LIMITED, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Liana D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Liana D?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Liana D?

The professionals named in the filing: Architect: VILAS DESAI & ASSOCIATES; Architect: Pradeep Kamble; Engineer: Dadaso Gavali; Engineer: MEHUL SHAH; Chartered Accountant: Chirag Sarvaiya & Co; Chartered Accountant: M S K A & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Liana D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Liana D. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Liana D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.