LEVEL - The Residences

By M/s Siroya Keystone

RG-MH-77304 · RERA P51800011428 · Last updated on MahaRERA portal: 7 Apr 2025

Source: official MahaRERA filing

Red flags

  • 13 complaints at MahaRERA
  • Completion date moved by 36 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 36 months from the original
10 of 11Construction stages donefurthest along: Installation of Lifts, 95%
13Complaints at MahaRERAon this registration
Jump to the 113 documents Report an error

LEVEL - The Residences is a Residential / Group Housing project by M/s Siroya Keystone in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800011428 on 31 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 13 complaints are on record with the regulator.

At a glance

Project

  • NameLEVEL - The Residences
  • TypeResidential / Group Housing
  • Location
    • New Link Road
    • Oshiwara
    • Andheri
    • Mumbai Suburban
    • 400102
  • Pincode400102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800011428
  • ReraGenie IDRG-MH-77304

Builder

  • NameM/s Siroya Keystone
  • Entity typePartnership
  • PartnerRishabh Pravin Siroya
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2017First promiseDec 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed113 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LEVEL - The ResidencesNA430000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

LEVEL - The Residences: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 7 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed188

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots188
Closed/Covered188

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,451 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
M/s Unity GroupAndheriMumbai Suburban
Messers Unity GroupAndheriMumbai Suburban

Approvals and building plan

Permissible FSI12303.77
Proposed, not sanctioned12,304 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTARDEO

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
M/s Siroya Keystone-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800016646Dec 2023 → Dec 2024

Reason as filed by the promoterThis extension is sought for the flats to be constructed on the floors from 32nd till 35th which the promoter has not sold to any of the purchaser till date. The Promoter undertake that they shall inform the prospective purchaser of the flats to be constructed on floors 32nd till 35th about the extended date i.e. 29/12/2024. As far as the delivery of the flat below 32nd floor is concerned, the Promoters are determined to deliver the possession of the flat in the manner as mentioned in the Agreement for Sale executed by and between the Promoter and prospective purchaser.

EXT51800027187Dec 2023 → Dec 2026

Reason as filed by the promoterImpact of Pandemic and Rising Construction Material Costs: The COVID-19 pandemic has had a profound and far-reaching impact on the construction industry, both locally and globally. As a direct consequence of the pandemic, there has been a significant and sustained increase in the prices of essential construction materials, including but not limited to cement, steel, copper, electrical components, plumbing materials, and paints. This escalation in material costs has resulted in severe financial strain, disrupting the supply chain and leading to delays in procurement and delivery of these materi

Litigation declared8

CaseCourtStatus
Chamber Summon No 811/14 in SC suit no 944/11/2014Bombay High CourtRejected
S C Suit no 1408/2012/2012City Civil Court DindoshiPending
appeal from order no 30/2011/2011Deputy Collector Appeal MSD Bandra EastDismissed
Misc Petition No 102/11 in testamentary petition no 814/1985/1985Bombay High CourtDismissed
DLN/RTS/A9/2011/2011Sub Divisional officer msd bandraDismissed
S C Suit No 944/2011/2011City Civil Court DindoshiPending
Notice of Motion No 595/2014 in Suit no 965/2014/2014Bombay High CourtPending
SUIT LD NO 4033 OF 2024/2024BOMBAY HIGH COURTAPPEALED IS FILE AGAINST THE INPUNGED ORDER

Complaints filed with MahaRERA13

Case no.ComplainantRespondentFiled
CC006000000196732Asha SainaniSiroya Keystone19/04/2021
CC006000000197784Ramsevak Gulab YadavM/s UNITY GROUP AND PARTNERS, BUILDERS AND DEVELOPERS28/07/2021
CC006000000198847M/s. Siroya KeystoneM/s. Touch Of Class01/11/2021
CC006000000198861Rishabh P SiroyaM/s. Touch Of Class12/11/2021
CC006000000198957Rishabh Pravin SiroyaShakil Ahmed Khan Baig04/01/2022
CC006000000209644Rishabh P SiroyaNitin Dhiraj Jain11/01/2022
CC006000000209725Rishabh Pravin SiroyaSweety Suraj Jain18/05/2022
CC006000000209812Rishabh SiroyaChandni Kamal Singh15/02/2022
CC006000000210001Rishabh SiroyaChandni Kamal Singh15/02/2022
CC006000000199079Devnarayan Feku YadavUnity Group & Anr02/12/2021
CC006000000251640DURGA MATA MANDIR VIRAJMAAN through SHRI RAMSEVAK GULAB YADAVM/s. UNITY GROUP, BUILDERS & DEVELOPERS28/06/2022
CC006000000500563LINK PALACE CHS LTDUnity Group30/05/2024
CC12503964Rishabh Pravin SiroyaDanish Mohammed Ikram Qureshi12/11/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Dec 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Mar 2024

Documents filed113

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: form 3 june 2024_compressed.pdf7 Apr 2025
Certificates of CA (Form 3)File: form 3 sep 2024_compressed.pdf7 Apr 2025
Certificates of CA (Form 3)File: form 3 december 2024_compressed.pdf7 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - JUNE_compressed.pdf7 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - SEPT_compressed.pdf7 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold, Unsold, Booked inventory - DEC_compressed.pdf7 Apr 2025
Declaration in FORM BFile: 1 N Affidavit Cum Declaration - Level The Residences - 2025_compressed.pdf4 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1_ MARCH 24_compressed.pdf3 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1_ JUNE 24_compressed.pdf3 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1_ SEP 24_compressed.pdf3 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1_DEC 24_compressed.pdf3 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2_ MARCH 24_compressed.pdf3 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2_ JUNE 24_compressed.pdf3 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2_ SEP 24_compressed.pdf3 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2_DEC 24_compressed.pdf3 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2a m18_compressed.pdf3 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2a m19_compressed.pdf3 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2a m20_compressed.pdf3 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2a m21_compressed.pdf3 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2a m22_compressed.pdf3 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2a m23_compressed.pdf3 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2a m24_compressed.pdf3 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate June.pdf20 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Sep.pdf20 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Dec.pdf20 Mar 2025
Certificates of CA (Form 3)File: CA Certificate June.pdf20 Mar 2025
Certificates of CA (Form 3)File: CA Certificate Sep.pdf20 Mar 2025
Certificates of CA (Form 3)File: CA Certificate Dec.pdf20 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate June.pdf20 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Sep.pdf20 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Dec.pdf20 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 RERA - FY 22-23.pdf20 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 RERA - FY 23-24.pdf20 Mar 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC - 31 floorss.pdf28 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: FINAL CC.pdf25 Sep 2023
Details of encumbrances concerned to FinanceFile: Self Declaration Regarding Encumbrance Concerned- Maha Real Estate Regulation - Feb 2023.p21 Apr 2023
Details of encumbrances concerned to LegalFile: Self Declaration Regarding Encumbrance Concerned- Maha Real Estate Regulation - Feb 2023.p21 Apr 2023
Proforma of Agreement for saleFile: Draft Agreement For Sale.pdf21 Apr 2023
Declaration about Commencement CertificateFile: Declaration for CC.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold- Unsold inventory.pdf20 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account.pdf20 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: Sale Commencement Certificate.pdf19 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM5FY1819.pdf9 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM5FY1920.pdf9 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM5FY2021.pdf9 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM5FY2122.pdf9 Apr 2023
Building plan approvalFile: AMENDED PLAN SALE-1.pdf14 Dec 2021
Building plan approvalFile: AMENDED PLAN SALE-2.pdf14 Dec 2021
Building plan approvalFile: AMENDED PLAN SALE-3.pdf14 Dec 2021
Building plan approvalFile: AMENDED PLAN SALE-4.pdf14 Dec 2021
Building plan approvalFile: AMENDED PLAN SALE-5.pdf14 Dec 2021
Building plan approvalFile: AMENDED PLAN SALE-6.pdf14 Dec 2021
Building plan approvalFile: AMENDED PLAN SALE-7.pdf14 Dec 2021
Building plan approvalFile: AMENDED PLAN SALE-8.pdf14 Dec 2021
Building Plan Approval (IOD)File: AMENDED PLAN SALE-1.pdf14 Dec 2021
Building Plan Approval (IOD)File: AMENDED PLAN SALE-2.pdf14 Dec 2021
Building Plan Approval (IOD)File: AMENDED PLAN SALE-3.pdf14 Dec 2021
Building Plan Approval (IOD)File: AMENDED PLAN SALE-4.pdf14 Dec 2021
Building Plan Approval (IOD)File: AMENDED PLAN SALE-5.pdf14 Dec 2021
Building Plan Approval (IOD)File: AMENDED PLAN SALE-6.pdf14 Dec 2021
Building Plan Approval (IOD)File: AMENDED PLAN SALE-7.pdf14 Dec 2021
Building Plan Approval (IOD)File: AMENDED PLAN SALE-8.pdf14 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: SALE cc.pdf14 Dec 2021
PAN CardFile: Pan_Card_-_SK.pdf20 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: CC_ 19 floors.pdf20 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: CC_ 19 floors.pdf20 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: Further CC.pdf19 Feb 2020
Certificates of CA (Form 5)File: Form 5.pdf9 Apr 2019
Proforma of Allotment letterFile: Agreement for Sale Level - II PDF compressed.pdf15 Oct 2018
Proforma of Allotment letterFile: Agreement for Sale Level - II PDF compressed.pdf15 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: CC Sale PDF.pdf12 Oct 2018
Proforma of Allotment letterFile: Agreement for Sale Level - III PDF compressed.pdf12 Oct 2018
Proforma of Allotment letterFile: Agreement for Sale Level - III PDF compressed.pdf12 Oct 2018
Building plan approvalFile: New Doc 2017-09-12 (1).pdf13 Sep 2017
Building plan approvalFile: New Doc 2017-09-12 (2).pdf13 Sep 2017
Building plan approvalFile: New Doc 2017-09-12 (3).pdf13 Sep 2017
Building plan approvalFile: New Doc 2017-09-12.pdf13 Sep 2017
Building plan approvalFile: New Doc 2017-09-13.pdf13 Sep 2017
Building Plan Approval (IOD)File: New Doc 2017-09-12 (1).pdf13 Sep 2017
Building Plan Approval (IOD)File: New Doc 2017-09-12 (2).pdf13 Sep 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
KamalKamal Vile Parle Cooperative Society Azad Rd Near Fire brigade Vile Parle East 40005733CompletedNov 2015Late, Nov 2015
Mahul 1Plot No 332 Behind Shalimar hotel Mahul Village352CompletedAug 2015Late, May 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 36 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LEVEL - The Residences on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Oshiwara6,700+ in Mumbai Suburban

2 kmLEVEL - The ResidencesCompleted 118Lapsed / revoked 63Abeyance 1Other 121Dot size: filed unitsN

Filed coordinates, straight-line distance. 303 registered projects within 2 km.

Builder: M/s Siroya Keystone

M/s Siroya Keystone has 1 registration on MahaRERA, including LEVEL - The Residences. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if LEVEL - The Residences is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LEVEL - The Residences?

The registered promoter entity is M/s Siroya Keystone, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LEVEL - The Residences?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against LEVEL - The Residences?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for LEVEL - The Residences?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in LEVEL - The Residences?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LEVEL - The Residences. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LEVEL - The Residences to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.