Home / Browse projects / Pune, Maharashtra / LAXMI VISHNUPURAM

Completed No litigation declared Residential / Group Housing project

LAXMI VISHNUPURAM

By LAXMI DEVELOPERS

RG-MH-11967 · RERA P52100007068 · Last updated on MahaRERA portal: 13 Apr 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 13 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2019Possession promisedregistration recorded completed
25 of 33Construction stages doneacross 3 buildings; furthest along: Installation of Lifts, 90%
0Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

LAXMI VISHNUPURAM is a Residential / Group Housing project by LAXMI DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100007068 on 17 Aug 2017. The registration is recorded completed; possession was promised by 12 Dec 2019.

At a glance

Project

  • NameLAXMI VISHNUPURAM
  • TypeResidential / Group Housing
  • Location
    • NDA ROAD
    • DESHMUKHWADI
    • Shivane (Uttamnagr)
    • Haveli
    • Pune
    • 411023
  • Pincode411023
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100007068
  • ReraGenie IDRG-MH-11967

Builder

  • NameLAXMI DEVELOPERS
  • Entity typePartnership
  • PartnersMAHENDRA PATILBUVA DANGAT, VIRSINH CHANDRASHEKHAR JADHAVRAO, TUSHAR GAJANAN KEVATE
  • Other registrations13 more →
  • Completed5 of 14
  • No longer live6 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2017PromisedDec 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Aug 2017
  • Promised completion12 Dec 2019
  • Revised completionNone
  • Buildings3 building records
  • Documents filed59 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA100000
BNA100000
AMENITIESNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 13 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

25 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Installation of Lifts, at 90%.

A81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
B81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
AMENITIES90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities16

As on 13 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%
Amphi TheaterYes100%

Parking filed88

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots88
Closed/Covered16
Open Space72
BuildingClosed/CoveredOpen SpaceTotal
A03636
B03636
AMENITIES16016

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,400 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
MAHENDRA PATILBUA DANGATShivane (Uttamnagr)Pune
SURNDRA PATILBUA DANGATShivane (Uttamnagr)Pune
LAXMIBAI PATILBUA DANGATShivane (Uttamnagr)Pune

Approvals and building plan

Permissible FSI11101.42
Proposed, not sanctioned9,541 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBAJIRAO ROAD AND LAXMI ROAD CORNER PUNE 411030

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectWALHEKAR AND ASSOCIATES
EngineerG A BHILARE CONSULTANTS PVT LTD
PartnerRole in project
LAXMI DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Laxmi Vishnupuram A- WING Society Certificate.pdf13 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Laxmi Vishnupuram B- Wing Society CERTIFICATE.pdf13 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Laxmi Vishnupuram C- WING SOCIETY CERTIFICATE.pdf13 Apr 2023
Status of ConveyanceFile: Laxmi Vishnupuram A B C Wing Conveyance deed.pdf13 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Laxmi Developers FORM 4.pdf30 Jul 2020
Architect’s Certificate on Completion of Project (Form 4)File: Laxmi Developers FORM 4.pdf9 Jul 2020
Certificates of CA (Form 5)File: Laxmi Developers Form 5.pdf18 Jun 2019
OtherFile: Laxmi Vishnupuram A- Wing Completion Certificate 1.pdf18 Jun 2019
OtherFile: Laxmi Vishnupuram A- Wing Completion Certificate 2.pdf18 Jun 2019
OtherFile: Laxmi Vishnupuram Completion Certificate B- Wing 1.pdf18 Jun 2019
OtherFile: Laxmi Vishnupuram Completion Certificate B -Wing 2.pdf18 Jun 2019
OtherFile: Laxmi Vishnupuram Completion Certificate B-Wing 3.pdf18 Jun 2019
OtherFile: Laxmi Developers Complation Certificate B- Wing 1.pdf16 Mar 2018
OtherFile: Laxmi Developers Complation Certificate B -Wing 2.pdf16 Mar 2018
OtherFile: Laxmi Developers Complation Certificate B-Wing 3.pdf16 Mar 2018
Building plan approvalFile: Laxmi Developers B -Wing 1.pdf27 Jul 2017
Building plan approvalFile: Laxmi Developers A-Wing 2.pdf27 Jul 2017
Building plan approvalFile: Laxmi Developers A -Wing 1.pdf27 Jul 2017
Building plan approvalFile: Laxmi Developers B- Wing 2.pdf27 Jul 2017
Layout approvalFile: Laxmi Developers Lay Out Plan.pdf27 Jul 2017
PAN CardFile: Laxmi Developers Pan Card.pdf27 Jul 2017
Copy of the legal title reportFile: Laxmi vishnupuram Search Report.pdf27 Jul 2017
Details of encumbrancesFile: Laxmi Developers - Non Encumbrance Certificate.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: Laxmi Developers Lay Out Plan.pdf27 Jul 2017
Building Plan Approval (IOD)File: Laxmi Developers A -Wing 1.pdf27 Jul 2017
Building Plan Approval (IOD)File: Laxmi Developers A-Wing 2.pdf27 Jul 2017
Building Plan Approval (IOD)File: Laxmi Developers B -Wing 1.pdf27 Jul 2017
Building Plan Approval (IOD)File: Laxmi Developers B- Wing 2.pdf27 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Laxmi Developers Commencement Letter 1.pdf27 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Laxmi Developers Commencement Letter 2.pdf27 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Laxmi Developers Commencement Letter 3.pdf27 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Laxmi Developers Commencement Letter 4.pdf27 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Laxmi Developers Commencement Letter 5.pdf27 Jul 2017
Declaration in FORM BFile: Laxmi Developers Form -B-01.pdf27 Jul 2017
Declaration in FORM BFile: Laxmi Developers Form - B-02.pdf27 Jul 2017
Declaration in FORM BFile: Laxmi Developers Form -B-03.pdf27 Jul 2017
Declaration in FORM BFile: Laxmi Developers Form- B-04.pdf27 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Laxmi Developers Architect Certficate Form 01.pdf27 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Laxmi Developers Architect form 01Table A Building A.pdf27 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Laxmi Developers Architect Form 01Table A Building B.pdf27 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Laxmi Developers Architect Form 01 Table B.pdf27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Laxmi Developers- Engineer's Certificate - 1.pdf27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Laxmi Developers- Engineer's Certificate - 2.pdf27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Laxmi Developers- Engineer's Certificate - 3.pdf27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Laxmi Developers- Engineer's Certificate - 4.pdf27 Jul 2017
Certificates of CA (Form 3)File: Laxmi Vishnupuram CA Certificate 1.pdf27 Jul 2017
Certificates of CA (Form 3)File: Laxmi Vishnupuram C A Certificate 2.pdf27 Jul 2017
Certificates of CA (Form 3)File: Laxmi Vishnupuram CA Certificate 3.pdf27 Jul 2017
Certificates of CA (Form 3)File: Laxmi Vishnupuram CA Certificate 4.pdf27 Jul 2017
Certificates of CA (Form 3)File: Laxmi vishnupuram C A Certificate 5.pdf27 Jul 2017
Proforma of Allotment letterFile: Agreement-Draft-laxmi vishnupuram PDF.pdf27 Jul 2017
Proforma of Allotment letterFile: Laxmi Developers -Allotment Letter - LVP -1.pdf27 Jul 2017
Proforma of Allotment letterFile: Laxmi Developers- Allotment Letter - LVP -2.pdf27 Jul 2017
Proforma of Allotment letterFile: Laxmi Developers-Allotment Letter - LVP -3.pdf27 Jul 2017
Proforma of Allotment letterFile: Laxmi Developers - Allotment Letter-LVP- 4.pdf27 Jul 2017
Proforma of Allotment letterFile: Laxmi Developers- Allotment Letter - LVP -5.pdf27 Jul 2017
Proforma of Allotment letterFile: Laxmi Developers- Allotment Letter - LVP -6.pdf27 Jul 2017
OtherFile: Laxmi Developers Complation Certificate C Wing.pdf27 Jul 2017
OtherFile: Laxmi Developers Application Form.pdf27 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LAXMI VISHNUPURAM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DESHMUKHWADI13,700+ in Pune

2 kmLAXMI VISHNUPURAMCompleted 10Lapsed / revoked 13Other 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 34 registered projects within 2 km.

Builder: LAXMI DEVELOPERS

LAXMI DEVELOPERS has 14 registrations on MahaRERA, including LAXMI VISHNUPURAM and KUTUMB. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if LAXMI VISHNUPURAM is delayed beyond 12 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LAXMI VISHNUPURAM?

The registered promoter entity is LAXMI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LAXMI VISHNUPURAM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for LAXMI VISHNUPURAM?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LAXMI VISHNUPURAM?

The professionals named in the filing: Architect: WALHEKAR AND ASSOCIATES; Engineer: G A BHILARE CONSULTANTS PVT LTD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LAXMI VISHNUPURAM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LAXMI VISHNUPURAM. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LAXMI VISHNUPURAM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.