ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / LAXMI PARK

Registration lapsed No litigation declared Others project

LAXMI PARK

By KAMTHE BUILDERS

RG-MH-12909 · RERA P52100021976 · Last updated on MahaRERA portal: 15 Jan 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 46 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2022Possession promised46 months past this date
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 55 documents Report an error

LAXMI PARK is a Others project by KAMTHE BUILDERS in Pune, Maharashtra, registered with MahaRERA as P52100021976 on 25 Aug 2019. Possession was promised by 30 Dec 2022 and is now 46 months past that date.

At a glance

Project

  • NameLAXMI PARK
  • TypeOthers
  • Location
    • FURSUNGI
    • Haveli
    • Pune
    • 412308
  • Pincode412308
  • RERA no.P52100021976
  • ReraGenie IDRG-MH-12909

Builder

  • NameKAMTHE BUILDERS
  • Entity typePartnership
  • PartnersSHRADDHA SAMIR KAMTHE, VISHAL SAMBHAJI KAMTHE, SATISH DATTATRAYA KAMTHE, PRIYANKA SATISH KAMTHE, ASHWINI DATTATRAY KAMTHE, DATTATRAY ABASO KAMTHE, SURESH RAMDAS KAMTHE, MAHESH SURESH KAMTHE, PRALHAD KALURAM KAMATHE, TUSHAR SAMBHAJI KAMTHE, KAJAL SURESH KAMTHE, KOMAL VISHAL KAMTHE and 2 more

Key dates

46 months past promisethis monthRegisteredAug 2019PromisedDec 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on25 Aug 2019
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed55 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING BNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

WING B: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed28

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots28
Closed/Covered28

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area976 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
Mr. Shivaji Kerba KamtheFursungiPune
Mr. Gangadhar Kerba KamtheFursungiPune
Mr. Jagannath Kerba KamtheFursungiPune

Approvals and building plan

Permissible FSI701.95
Proposed, not sanctioned702 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGr AND Mezzanine Floor Parmar House 2413 East Street General Thimayya Road Camp Pune 411001

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAtit Admulwar
ArchitectRavindra Danve Vastunirman Architects
EngineerAAKASH GAWADE
Chartered AccountantCA YOGESH PANDURANG BHAGAT
Chartered AccountantTOTALA AND ASSOCIATE
PartnerRole in project
KAMTHE BUILDERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 2 Mar 2024

Documents filed55

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: FORM BUILDER LANDOWNER.pdf15 Jan 2025
Certificates of CA (Form 3)File: form 3 year-2021.pdf22 Dec 2024
Certificates of CA (Form 3)File: form 3 year-2022-compressed.pdf22 Dec 2024
Certificates of CA (Form 3)File: form 3 year-2023.pdf22 Dec 2024
Certificates of CA (Form 3)File: Form 3 Year 2024.pdf22 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 year-2020-2021.pdf22 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 year 2021-2022.pdf22 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 year 2022-2023.pdf22 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 year 2023-2024.pdf22 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 year 2023-2024.pdf22 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 ARCH CERT FORM 1.pdf3 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 ARCH CERT FORM 1.pdf3 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 31 MARCH 2023.pdf1 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - 31 MARCH 2024.pdf1 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2 A - MARCH 2022.pdf1 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2 A - MARCH 2023.pdf1 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- MARCH 2024.pdf1 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - MARCH 2024.pdf1 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: NEW Form 4 Rera 02 MARCH 2024.pdf30 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCCUPATION CERTIFICATE B WING.pdf2 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART OCCUPATION CERTIFICATE 27-Feb-2024 (2)-pages-2.pdf27 Feb 2024
Disclosure of sold/ booked inventoryFile: FORM 29 LANDOWNERS SHARE FLATS.pdf17 Dec 2023
Layout approvalFile: Rev plan 1-compressed.pdf7 Dec 2023
Building plan approvalFile: Rev Plan 3-compressed.pdf7 Dec 2023
Copy of Layout Approval (in case of layout)File: Rev plan 1-compressed.pdf7 Dec 2023
Building Plan Approval (IOD)File: Rev Plan 3-compressed.pdf7 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: PMC COMMENCEMENT CERTIFICATE.pdf7 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE Ravindra Danve-c.pdf7 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineer's Certificate 30 January 2022.pdf1 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEERS CERTIFICATE 25 MARCH 2021.pdf1 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A of 2019-compressed.pdf1 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A of 2020-compressed.pdf1 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A of 2021-compressed.pdf1 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect letter_16515023 (3).pdf28 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate_compressed.pdf28 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate Form 2A (2).pdf24 Aug 2021
Declaration about Commencement CertificateFile: ScannerGo_19Aug2021_064026.pdf19 Aug 2021
Disclosure of sold/ booked inventoryFile: Discoluse of Sold .pdf15 Jun 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Kamthe.pdf31 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Certificate Kamthe.pdf31 Mar 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 RERA Kamthe.pdf31 Mar 2021
Proforma of Allotment letterFile: Allotment and Possession Letter.pdf8 Aug 2019
Commencement Certificates / NA Order for plotted developmentFile: 01 Commencement Letter and plinth check certificate_compressed.pdf7 Aug 2019
Commencement Certificates / NA Order for plotted developmentFile: 02 TP revise sanction Commencement certificate.pdf7 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf5 Aug 2019
Certificates of CA (Form 3)File: Certificate (Form 3).pdf5 Aug 2019
Building plan approvalFile: PLAN LAYOUT APPROVAL FOR B.pdf29 Jul 2019
Layout approvalFile: PLAN LAYOUT APPROVAL FOR B.pdf29 Jul 2019
Copy of Layout Approval (in case of layout)File: PLAN LAYOUT APPROVAL FOR B.pdf29 Jul 2019
Building Plan Approval (IOD)File: PLAN LAYOUT APPROVAL FOR B.pdf29 Jul 2019
Copy of the legal title reportFile: Title Search Report.pdf26 Jul 2019
Details of encumbrancesFile: Details of encumbrances.pdf26 Jul 2019
Declaration in FORM BFile: Form B.pdf26 Jul 2019
Proforma of Allotment letterFile: Proforma of the allotment letter and agreement for sale.pdf26 Jul 2019
PAN CardFile: kamthe builders PAN.pdf24 Jun 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LAXMI PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near FURSUNGI13,700+ in Pune

Builder: KAMTHE BUILDERS

KAMTHE BUILDERS has 1 registration on MahaRERA, including LAXMI PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that LAXMI PARK shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if LAXMI PARK is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LAXMI PARK?

The registered promoter entity is KAMTHE BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LAXMI PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for LAXMI PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LAXMI PARK?

The professionals named in the filing: Architect: Atit Admulwar; Architect: Ravindra Danve Vastunirman Architects; Engineer: AAKASH GAWADE; Chartered Accountant: CA YOGESH PANDURANG BHAGAT; Chartered Accountant: TOTALA AND ASSOCIATE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LAXMI PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LAXMI PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LAXMI PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.