Home / Browse projects / Pune, Maharashtra / Lavthaleshwar Complex

Registration lapsed No litigation declared Residential / Group Housing project

Lavthaleshwar Complex

By Sachin Balkrushn Bayas proprietor of Lavthaleshwar developers

RG-MH-16837 · RERA P52100027049 · Last updated on MahaRERA portal: 6 Dec 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 28 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2024Possession promised28 months past this date
5 of 11Construction stages donefurthest along: Staircases, 90%
0Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

Lavthaleshwar Complex is a Residential / Group Housing project by Sachin Balkrushn Bayas proprietor of Lavthaleshwar developers in Pune, Maharashtra, registered with MahaRERA as P52100027049 on 10 Nov 2020. Possession was promised by 30 Jun 2024 and is now 28 months past that date.

At a glance

Project

  • NameLavthaleshwar Complex
  • TypeResidential / Group Housing
  • Location
    • Jejuri road
    • Lavthaleshwar
    • Jejuri (M Cl)
    • Purandhar
    • Pune
    • 412303
  • Pincode412303
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100027049
  • ReraGenie IDRG-MH-16837

Builder

  • NameSachin Balkrushn Bayas proprietor of Lavthaleshwar developers
  • Entity typeIndividual
  • GSTIN27AVTPB9750C1ZD
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

28 months past promisethis monthRegisteredNov 2020PromisedJun 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on10 Nov 2020
  • Promised completion30 Jun 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed58 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Lavthaleshwar ComplexNA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.

Lavthaleshwar Complex: 63% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Open Space1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,208 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2572.82
Proposed, not sanctioned2,573 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAjit complex Jejuri Near S t Stand Purandar Pune

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrashant Gulabrao Nazrekar
EngineerPrashant Gulabrao Nazrekar
Chartered AccountantA P Yadav and CO
PartnerRole in project
Sachin Balkrushn Bayas proprietor of Lavthaleshwar developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Nov 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Architect’s Certificate on Completion of Project (Form 4).pdf6 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Architect’s Certificate on Completion of Project (Form 4).pdf4 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Architect’s Certificate on Completion of Project (Form 4).pdf1 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 8650 ARCHITECT CERTIFICATE DEC 2019.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 8651 ARCHITECT CERTIFICATE MAR 2020.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 8652 ARCHITECT CERTIFICATE JUN 2020.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 8653 ARCHITECT CERTIFICATE SEP 2020.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 8642 ARCHITECT CERTIFICATE DEC 2020.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 8643 ARCHITECT CERTIFICATE MARCH 2021.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 8644 ARCHITECT AND ENGINEER CERTIFICATE APR MAY JUN 2021.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 8645 ARCHITECT CERTIFICATE SEP 2021.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 8646 ARCHITECT CERTIFICATE DEC 2021.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11 8647 ARCHITECT CERTIFICATE MARCH 2022.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12 8648 ARCHITECT CERTIFICATE JUN 2022.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 8654 ARCHITECT CERTIFICATE SEP 2019.pdf28 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Architect’s Certificate on Completion of Project (Form 4).pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 8654 ENGINEER CERTIFICATE SEP 2019.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 8650 ENGINEER CERTIFICATE DEC 2019.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 8651 ENGINEER CERTIFICATE MAR 2020.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 8652 ENGINEER CERTIFICATE JUN 2020.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 8653 ENGINEER CERTIFICATE SEP 2020.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 8642 ENGINEER CERTIFICATE DEC 2020.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 8643 ENGINEER CERTIFICATE MARCH 2021.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 8644 ENGINEER CERTIFICATE JUN 2021.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 8645 ENGINEER CERTIFICATE SEP 2021.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 8646 ENGINEER CERTIFICATE DEC 2021.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 8647 ENGINEER CERTIFICATE MARCH 2022.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12 8648 ENGINEER CERTIFICATE JUN 2022.pdf28 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4-LAVTHALESHWAR COMPLEX.pdf18 Nov 2024
PAN CardFile: Shop Act Lavthaleshwar developers.pdf26 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate 19042022.pdf10 Jul 2022
Layout approvalFile: sachin bayas1of4Model.pdf8 Jun 2022
Layout approvalFile: sachin bayas2of4Model.pdf8 Jun 2022
Layout approvalFile: sachin bayas3of4Model.pdf8 Jun 2022
Layout approvalFile: sachin bayas4of4Model.pdf8 Jun 2022
Building plan approvalFile: sachin bayas1of4Model.pdf8 Jun 2022
Building plan approvalFile: sachin bayas2of4Model.pdf8 Jun 2022
Building plan approvalFile: sachin bayas3of4Model.pdf8 Jun 2022
Building plan approvalFile: sachin bayas4of4Model.pdf8 Jun 2022
Copy of Layout Approval (in case of layout)File: sachin bayas1of4Model.pdf8 Jun 2022
Copy of Layout Approval (in case of layout)File: sachin bayas2of4Model.pdf8 Jun 2022
Copy of Layout Approval (in case of layout)File: sachin bayas3of4Model.pdf8 Jun 2022
Copy of Layout Approval (in case of layout)File: sachin bayas4of4Model.pdf8 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: sachin bayas1of4Model.pdf8 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: sachin bayas2of4Model.pdf8 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: sachin bayas3of4Model.pdf8 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: sachin bayas4of4Model.pdf8 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Lavthaleshwar complex 1MB.pdf5 Nov 2020
Proforma of Allotment letterFile: model form of agreement as per MAHARERA.pdf5 Nov 2020
Layout approvalFile: VALIDATE APPROVAL DRAWING 1mb.pdf4 Nov 2020
Building plan approvalFile: VALIDATE APPROVAL DRAWING 1mb.pdf4 Nov 2020
PAN CardFile: Sachin Pan.pdf4 Nov 2020
Copy of the legal title reportFile: Search title 1mb.pdf4 Nov 2020
Details of encumbrancesFile: Encumbrance Letter.pdf4 Nov 2020
Copy of Layout Approval (in case of layout)File: VALIDATE APPROVAL DRAWING 1mb.pdf4 Nov 2020
Building Plan Approval / NA Order for plotted developmentFile: VALIDATE APPROVAL DRAWING 1mb.pdf4 Nov 2020
Commencement Certificates / NA Order for plotted developmentFile: Sanction and commencement.pdf4 Nov 2020
Declaration in FORM BFile: Form B 1mb.pdf4 Nov 2020

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Lavthaleshwar Complex on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Lavthaleshwar13,700+ in Pune

2 kmLavthaleshwar ComplexCompleted 116Lapsed / revoked 116Other 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 268 registered projects within 2 km.

Builder: Sachin Balkrushn Bayas proprietor of Lavthaleshwar developers

Sachin Balkrushn Bayas proprietor of Lavthaleshwar developers has 2 registrations on MahaRERA, including Lavthaleshwar Complex and Lavthaleshwar Heights. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Lavthaleshwar Complex shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Lavthaleshwar Complex is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Lavthaleshwar Complex?

The registered promoter entity is Sachin Balkrushn Bayas proprietor of Lavthaleshwar developers, an individual as per the filing. Its GSTIN 27AVTPB9750C1ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Lavthaleshwar Complex?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Lavthaleshwar Complex?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Lavthaleshwar Complex?

The professionals named in the filing: Architect: Prashant Gulabrao Nazrekar; Engineer: Prashant Gulabrao Nazrekar; Chartered Accountant: A P Yadav and CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Lavthaleshwar Complex?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Lavthaleshwar Complex. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Lavthaleshwar Complex to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.