ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Lashkaria Solitaire

Registered No litigation declared Others project

Lashkaria Solitaire

By RELLIANCE REALTY

RG-MH-90667 · RERA P51800048357 · Last updated on MahaRERA portal: 17 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Oct 2027Possession promisedmoved 12 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 40%
39 of 55Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 61 documents Report an error

Lashkaria Solitaire is a Others project by RELLIANCE REALTY in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800048357 on 27 Dec 2022. Possession is promised by 31 Oct 2027. The completion date has moved by 12 months from the original filing. 16 of the 55 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameLashkaria Solitaire
  • TypeOthers
  • Location
    • OSHIWARA
    • ANDHERI WEST
    • Andheri
    • Mumbai Suburban
    • 400102
  • Pincode400102
  • RERA no.P51800048357
  • ReraGenie IDRG-MH-90667

Builder

  • NameRELLIANCE REALTY
  • Entity typePartnership
  • PartnersSALEEM MOHAMMED, RAIEES LASHKARIA, HASAM LASHKARIA, SALEEM MOHAMMED, RAIEES LASHKARIA, HASAM LASHKARIA

Key dates

this monthRegisteredDec 2022First promiseOct 2026Revised toOct 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Dec 2022
  • Promised completion31 Oct 2027
  • Revised completionRevised to 31 Oct 2027 (originally 31 Oct 2026)
  • Buildings1 building record
  • Documents filed61 files

Current status

29%16 of 55 units booked
48.7%Work done, per cost certificate

Figures as on 17 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Lashkaria SolitaireNA201955055

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 40%.

Lashkaria Solitaire: 42% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed86

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots86
Closed/Covered56
Open Space30

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,393 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Jul 2025
LandownerVillageDistrict
M H LASHKARIA CONSTRUCTIONBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authoritySRA
Permissible FSI6413.51
Proposed, not sanctioned5,392 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchANDHERI WEST
Estimated costRs 48.84 cr
Cost incurredRs 23.78 cr
Work done48.69%
BuildingWingEstimatedIncurred
Lashkaria SolitaireNARs 48.84 crRs 23.78 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKAHAAN ARCHPRO CONSULTANTS
EngineerRamavtaar Singh
EngineerSURA & ASSOCIATES
EngineerYUSUF AMIN BURGUJAR BURGUJAR
Chartered AccountantSAMEER SHAH & ASSOCIATES
Chartered AccountantDHANASHREE B SALUNKHE & CO
Chartered Accountantsiddharth gupta
PartnerRole in project
RELLIANCE REALTY-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA08062621274Oct 2026 → Oct 2027

Reason as filed by the promoterSubject: Intimation of Delay and Request for Extension of Project Completion Date for "Lashkaria Solitaire" (RERA Registration No. P51800048357) Respected sir/Madam This letter is to formally inform Maharashtra Real Estate Regulatory Authority about the delay in the completion of our registered project, "Lashkaria Solitaire" located in Adarsh nagar near lotus petrol pump, Link road, Andheri west, Mumbai 400102. The project, with RERA Registration No. P51800048357, had an original completion date of 31 october 2026. We request an extension until 31 October 2027. Despite our best efforts to main

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2027

Documents filed61

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: form 2a site engineer supervisor (1).pdf17 Jul 2026
Withdrawal Update Form 1File: form 1 april to june 2026.pdf11 Jul 2026
Withdrawal Update Form 2File: form 2 april to june 2026.pdf11 Jul 2026
Withdrawal Update Form 3File: form 3 april to june 2026.pdf11 Jul 2026
Withdrawal Update Form 1File: form 1 architect certificate jan to march 2026.pdf21 May 2026
Withdrawal Update Form 2File: form 2 engineer certificate jan to march 2026.pdf21 May 2026
Withdrawal Update Form 3File: form 3 CA certificate jan to march 2026.pdf21 May 2026
Withdrawal Update Form 1File: form 1 architect certificate oct to dec 2025.pdf28 Apr 2026
Withdrawal Update Form 2File: form 2 engineer certificate oct to dec 2025.pdf28 Apr 2026
Withdrawal Update Form 3File: Form 3 CA oct to Dec 2025.pdf28 Apr 2026
Withdrawal Update Form 1File: form 1 architect certificate july to sep 2025.pdf23 Apr 2026
Withdrawal Update Form 1File: form 1 architect certificate july to sep 2025.pdf23 Apr 2026
Withdrawal Update Form 2File: form 2 engineer certificate july to sep 2025.pdf23 Apr 2026
Withdrawal Update Form 2File: form 2 engineer certificate july to sep 2025.pdf23 Apr 2026
Withdrawal Update Form 3File: Form 3 Sep 2025.pdf23 Apr 2026
Withdrawal Update Form 3File: Form 3 Sep 2025.pdf23 Apr 2026
Withdrawal Update Form 1File: form 1 june sign.pdf1 Sep 2025
Withdrawal Update Form 2File: form 2 june sign.pdf1 Sep 2025
Withdrawal Update Form 3File: form 3 june sign.pdf1 Sep 2025
Commencement Certificates / NA Order for plotted developmentFile: Madani Further CC.pdf31 Jan 2025
Copy of the legal title reportFile: FINAL TITLE REPORT (MADANI)_compressed.pdf17 Dec 2022
Details of encumbrances concerned to FinanceFile: No Encumbrance Self Declaration (Latest).pdf6 Dec 2022
Details of encumbrances concerned to LegalFile: No Encumbrance Self Declaration (Latest).pdf6 Dec 2022
CERSAI detailsFile: Cersai Declaration.pdf6 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate Bank Account (Latest).pdf6 Dec 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report agreement (Latest).pdf6 Dec 2022
Declaration in FORM BFile: Form B.pdf15 Nov 2022
Proforma of Agreement for saleFile: final Agreement for Sale - RERA uploading - 12 November, 2022.pdf14 Nov 2022
Proforma of Allotment letterFile: Final Allotment Letter.pdf14 Nov 2022
Deviation Report with respect to Allotment letterFile: Deviation For Allotment Letter.pdf14 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA FORM 1 ARCHITECT CERTIFICATE.pdf3 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised Rera Form 3.pdf3 Nov 2022
Building plan approvalFile: IOD MADANI.PDF13 Oct 2022
Layout approvalFile: Binder1 scan_1-1.pdf13 Oct 2022
Layout approvalFile: Binder1 scan_6-6.pdf13 Oct 2022
Layout approvalFile: Binder1 scan_7-7.pdf13 Oct 2022
Layout approvalFile: Binder1 scan_8-8.pdf13 Oct 2022
Layout approvalFile: Binder1 scan_9-9.pdf13 Oct 2022
Layout approvalFile: Binder1 scan_10-10.pdf13 Oct 2022
Layout approvalFile: Binder1 scan_11-end.pdf13 Oct 2022
Layout approvalFile: Binder1 scan_4-4.pdf13 Oct 2022
Layout approvalFile: Binder1 scan_5-5.pdf13 Oct 2022
Layout approvalFile: Binder1 scan_2-2.pdf13 Oct 2022
Layout approvalFile: Binder1 scan_3-3.pdf13 Oct 2022
PAN CardFile: RELLIANCE REALTY - PAN CARD.pdf13 Oct 2022
Details of encumbrances concerned to FinanceFile: No encumbrance.pdf13 Oct 2022
Details of encumbrances concerned to LegalFile: No encumbrance.pdf13 Oct 2022
Copy of Layout Approval (in case of layout)File: Binder1 scan_1-1.pdf13 Oct 2022
Copy of Layout Approval (in case of layout)File: Binder1 scan_2-2.pdf13 Oct 2022
Copy of Layout Approval (in case of layout)File: Binder1 scan_3-3.pdf13 Oct 2022
Copy of Layout Approval (in case of layout)File: Binder1 scan_4-4.pdf13 Oct 2022
Copy of Layout Approval (in case of layout)File: Binder1 scan_5-5.pdf13 Oct 2022
Copy of Layout Approval (in case of layout)File: Binder1 scan_6-6.pdf13 Oct 2022
Copy of Layout Approval (in case of layout)File: Binder1 scan_7-7.pdf13 Oct 2022
Copy of Layout Approval (in case of layout)File: Binder1 scan_8-8.pdf13 Oct 2022
Copy of Layout Approval (in case of layout)File: Binder1 scan_9-9.pdf13 Oct 2022
Copy of Layout Approval (in case of layout)File: Binder1 scan_10-10.pdf13 Oct 2022
Copy of Layout Approval (in case of layout)File: Binder1 scan_11-end.pdf13 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD MADANI.PDF13 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf13 Oct 2022
Declaration about Commencement CertificateFile: CC Deeclaration.pdf13 Oct 2022

How this compares with Mumbai Suburban

29%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Lashkaria Solitaire on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ANDHERI WEST6,700+ in Mumbai Suburban

Builder: RELLIANCE REALTY

RELLIANCE REALTY has 1 registration on MahaRERA, including Lashkaria Solitaire. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Lashkaria Solitaire is delayed beyond 31 Oct 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Lashkaria Solitaire?

The registered promoter entity is RELLIANCE REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Lashkaria Solitaire?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Lashkaria Solitaire?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Lashkaria Solitaire?

The professionals named in the filing: Architect: KAHAAN ARCHPRO CONSULTANTS; Engineer: Ramavtaar Singh; Engineer: SURA & ASSOCIATES; Engineer: YUSUF AMIN BURGUJAR BURGUJAR; Chartered Accountant: SAMEER SHAH & ASSOCIATES; Chartered Accountant: DHANASHREE B SALUNKHE & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Lashkaria Solitaire?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Lashkaria Solitaire. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Lashkaria Solitaire to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.