Lake Shine
RG-MH-22530 · RERA P52100031633 · Last updated on MahaRERA portal: 18 Aug 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 16 months past the filed date
- Completion date moved by 13 months
- 2 extensions taken
- Rs 0.20 crore secured on the land, in favour of ANANT DOODH PVT LTD, THE VISHWESHWER SAHAKARI BANK LTD
- The declared charge does not appear in the CERSAI report on the filing
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Lake Shine is a Others project by POORVA DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100031633 on 3 Nov 2021. Possession was promised by 13 Jun 2025 and is now 16 months past that date. The completion date has moved by 13 months from the original filing. 24 of the 67 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NameLake Shine
- TypeOthers
- Location
- Near Rajesh Society
- Katraj Kondwa Road
- Katraj
- Pune (M Corp.)
- Pune City
- Pune
- 411046
- Pincode411046
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100031633
- ReraGenie IDRG-MH-22530
Builder
- NamePOORVA DEVELOPERS
- Entity typePartnership
- PartnerSUVARNA NITIN THOPATE
- Other registrations1 more →
- Completed1 of 2
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on3 Nov 2021
- Promised completion13 Jun 2025
- Revised completionRevised to 13 Jun 2025 (originally 31 May 2024)
- Buildings1 building record
- Documents filed133 files
Current status
Figures as on 18 Aug 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Lake Shine | NA | 10 | 8 | 55 | 12 | 67 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 18 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
Lake Shine: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 18 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed135
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership11
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Kantaram Shantaram Balkawade | Katraj | Pune |
| Mangala Prakash Pathare | Katraj | Pune |
| Kusum Gangadhar Baghare | Katraj | Pune |
| Sangeeta Dilip Adhavade | Katraj | Pune |
| Saraswati Atmaram Balkawade | Katraj | Pune |
| Vishakha Sathish More | Katraj | Pune |
| Dhanashree Kantaram Balkawade | Katraj | Pune |
| Sunita Kantaram Balkawade | Katraj | Pune |
| Sagar Atmaram Balkawade | Katraj | Pune |
| Akshay Kantaram Balkawad | Katraj | Pune |
| Chandrabhaga Shantaram Balkawade | Katraj | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar. Poonam Pranav Shah |
| Architect | GIRISH KARANDE & ASSOCIATES |
| Engineer | Satish Ramchandra Shedge |
| Chartered Accountant | Swarup S Chingale |
| Chartered Accountant | PGMJ & ASSOCIATES |
| Chartered Accountant | NITISH VAIDYA & ASSOCIATES |
| Partner | Role in project |
|---|---|
| POORVA DEVELOPERS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterNon-availability of resources
Reason as filed by the promoterThe estimated completion date was 31.03.2025. This is to bring to your kind attention that the Completion Certificate for our project has been duly received. However, due to an inadvertent lapse of the project registration on the Maha RERA portal prior to uploading the said certificate, we are currently unable to complete the compliance process. The project has been completed; Therefore, we are requesting an extension.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Oct 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Mar 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Mar 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed133
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 133 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: Form 5 Latest.pdf | 18 Aug 2025 |
| Form 1File: Form 1.pdf | 12 Aug 2025 |
| Form 2File: Form 2.pdf | 12 Aug 2025 |
| Form 3File: Form 3 Final.pdf | 12 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Circular.pdf | 12 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 19 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 19 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 19 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3.pdf | 19 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final form 3.pdf | 19 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3.pdf | 19 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 19 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 19 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 19 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Circular.pdf | 19 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Sold circular.pdf | 19 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Circular.pdf | 19 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Final Form 5 (FY-23-24).pdf | 13 Aug 2024 |
| Declaration in FORM BFile: Form B_11zon.pdf | 25 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form.pdf | 25 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Signed Scanned Form 5.pdf | 20 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_11zon.pdf | 12 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final Form 2_11zon.pdf | 7 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 6 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Circular-1.pdf | 5 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Circular-1.pdf | 5 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Circular-1.pdf | 5 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 11 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_11zon.pdf | 11 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_11zon.pdf | 11 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL Form 3 (Q3 23-24).pdf | 11 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (Q4 23-24).pdf | 11 May 2024 |
| Layout approvalFile: Sanctioned layout_1_11zon.pdf | 12 Mar 2024 |
| Building plan approvalFile: Scan_2467-02_rotated_2_11zon.pdf | 12 Mar 2024 |
| Building plan approvalFile: Scan_2467-03_rotated_3_11zon.pdf | 12 Mar 2024 |
| Building plan approvalFile: Scan_2467-04_rotated_4_11zon.pdf | 12 Mar 2024 |
| Copy of Layout Approval (in case of layout)File: Sanctioned layout_1_11zon.pdf | 12 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan_2467-02_rotated_2_11zon.pdf | 12 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan_2467-03_rotated_3_11zon.pdf | 12 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Scan_2467-04_rotated_4_11zon.pdf | 12 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8- 30 9 23.pdf | 25 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1- 1 1 22.pdf | 11 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2- 1 4 22.pdf | 11 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3- 1 7 22.pdf | 11 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4- 1 10 22.pdf | 11 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5- 1 1 23.pdf | 11 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6- 1 4 23.pdf | 11 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7- 1 7 23.pdf | 11 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: compressed_1- 2 1 22.pdf | 11 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: compressed_2- 2 4 22.pdf | 11 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: compressed_3- 2 7 22.pdf | 11 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: compressed_4- 4 10 22.pdf | 11 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: compressed_5- 3 1 23.pdf | 11 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: compressed_6- 4 4 23.pdf | 11 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: compressed_7- 1 7 23.pdf | 11 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A 21-22.pdf | 11 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A 22-23.pdf | 11 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1-31 12 21.pdf | 11 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: compressed_2- 31 3 22.pdf | 11 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: compressed_3- 30 6 22.pdf | 11 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: compressed_4- 30 9 22.pdf | 11 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: compressed_5- 31 12 22.pdf | 11 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: compressed_6- 31 3 23.pdf | 11 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: compressed_7- 30 6 23.pdf | 11 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FROM 2A_compressed.pdf | 14 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FROM 2A_compressed.pdf | 14 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FINAL Form 2A 2022-23.pdf | 13 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: 4 30-09-2022_compressed.pdf | 13 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: 5 edited_31-12-2022_compressed.pdf | 13 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised form 3_compressed.pdf | 13 Sep 2023 |
| Layout approvalFile: Layout_ HIGHLIGHTED.pdf | 12 Sep 2023 |
| Copy of Layout Approval (in case of layout)File: Layout_ HIGHLIGHTED.pdf | 12 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: 1 edited_31-12-2021_compressed.pdf | 12 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: 2 edited_31-03-2022_compressed.pdf | 12 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: 3 30-06-2022 (1)_compressed.pdf | 12 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1)Dec 21_compressed.pdf | 7 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2)Mar 22_compressed.pdf | 7 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3)June 22_compressed.pdf | 7 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4)Sept 22_compressed.pdf | 7 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5)Dec 22_compressed.pdf | 7 Sep 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 6 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 133 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Lake Shine on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Katraj13,700+ in Pune
Sai Nagari Phase I
Saikedareshwar Developers LLP
SAI NAGARI Phase V
Saikedareshwar Developers LLP
Sai Nagari Phase II
Saikedareshwar Developers LLP
Sai Nagari Phase IV
Saikedareshwar Developers LLP
Sai Nagari Phase III
Saikedareshwar Developers LLP
Bella Casa - Phase 1
Kakkad Infra LLP
Builder: POORVA DEVELOPERS
POORVA DEVELOPERS has 2 registrations on MahaRERA, including PREM JEET RESIDENCY and Lake Shine. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that Lake Shine shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Lake Shine is delayed beyond 13 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Lake Shine?
The registered promoter entity is POORVA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Lake Shine?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Lake Shine?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Lake Shine?
The professionals named in the filing: Architect: Ar. Poonam Pranav Shah; Architect: GIRISH KARANDE & ASSOCIATES; Engineer: Satish Ramchandra Shedge; Chartered Accountant: Swarup S Chingale; Chartered Accountant: PGMJ & ASSOCIATES; Chartered Accountant: NITISH VAIDYA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Lake Shine?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback