Home / Browse projects / Bengaluru Urban, Karnataka / KUMAR PLUMERIA
KUMAR PLUMERIA
By KUMAR PROPERTIES PRIVATE LIMITED
RG-KA-32965 · RERA PRM/KA/RERA/1251/309/PR/210125/007402 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
KUMAR PLUMERIA is a Residential/Group Housing project by KUMAR PROPERTIES PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/210125/007402 on 21 Jan 2025. Possession is promised by 31 Dec 2028. 5 of the 100 units on this registration are recorded sold or booked, and 0 of 17 construction stages are filed complete.
At a glance
Project
- NameKUMAR PLUMERIA
- TypeResidential/Group Housing
- Location
- Bengaluru North
- Bengaluru Urban
- 562149
- Pincode562149
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/309/PR/210125/007402
- ReraGenie IDRG-KA-32965
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on21 Jan 2025
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings2 building records
- Documents filed111 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Block 1 | - | - | - | 50 | 0 | 50 |
| Block 2 | - | - | - | 50 | 0 | 50 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 17 construction stages are filed complete. The stage furthest along is Foundation footing work, at 89%.
Building: 21% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 82% |
| Foundation footing work | 89% |
| Upto Plinth Level | 50% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 65% |
| Retaining wall (All types) | 55% |
| RCC or MS Framed structure | 20% |
| Masonry Construction | 1% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities38
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV SURVEILLANCE | Yes | 0% |
| CLUB HOUSE | Yes | 0% |
| OUTDOOR SPORTS FACILITY | Yes | 0% |
| INDOOR SPORTS FACILITY | Yes | 0% |
| SWIMMING POOL | Yes | 0% |
| GYM | Yes | 0% |
| PARKS | Yes | 0% |
| POWER BACKUP (DG YARD) | Yes | 0% |
| WATER SANITATION | Yes | 0% |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 50% |
| Terrace | Yes | 0% |
| Outer Wall | No | Not applicable |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | Yes | 0% |
| STAIRCASES AND LIFT LOBBIES, CORRIDOR, LOBBIES, CORRIDOR | Yes | 0% |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Harish Kumar Devaraj | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 99.38 cr | Rs 8.99 lakh |
| On-site expenditure-Site Overhead | Rs 10.37 cr | - |
| On-site expenditure-Consultants Fees | Rs 4.98 cr | Rs 2.52 lakh |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 4.72 cr | - |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | - | Rs 32.29 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Anup Naik |
| Engineer | Karthikeyan B |
| Chartered Accountant | Supriya Abhijit Mundada |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed111
As listed on the registration, under the names the promoter filed them with; the newest 80 of 111 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/210125/007402 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: FORM 5 Kumar Plumeria_Architects certificate.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer Certificate - Kumar Plumeria.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA certificate.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architects certificate Kumar Plumeria.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate - June 26 Plumeria.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA certificate March 26.pdf | 13 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect (QU) PLUMERIA March 2026.pdf | 13 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: FORM-06 Engineer Certificate - QU March 26.pdf | 13 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 13 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 13 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 13 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA certificate Dec25.pdf | 12 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Architects certificate Dec 25.pdf | 12 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: FORM-06 Engineer Certificate - Dec 2025.pdf | 12 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 12 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 12 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 12 Jan 2026 |
| AOAFile: 1 AOA.pdf | 17 Jan 2025 |
| MOAFile: 1 MOA.pdf | 17 Jan 2025 |
| SOF with Supp doc and DeclarationFile: 2 SOF with Supp doc and Declaration.pdf | 17 Jan 2025 |
| cash flow Statement latest oneFile: 3 cash flow Statement latest one.pdf | 17 Jan 2025 |
| Hitesh Sir PanFile: Hitesh Sir Pan.pdf | 17 Jan 2025 |
| Kewal Sir PanFile: Kewal Sir Pan.pdf | 17 Jan 2025 |
| Conversion OrderFile: 6 Conversion Order.pdf | 17 Jan 2025 |
| ADLR sketchFile: 7 ADLR sketch.jpeg | 17 Jan 2025 |
| Declaration Single Plot Layout and OrderFile: 8 Declaration Single Plot Layout and Order.pdf | 17 Jan 2025 |
| BDA Building lisence copyFile: 10 BDA Building lisence copy.pdf | 17 Jan 2025 |
| Common Area and Amenities detailsFile: 11 Common Area and Amenities details.pdf | 17 Jan 2025 |
| Engineer license Sef attestedFile: 12 Engineer license Sef attested.pdf | 17 Jan 2025 |
| Proforma of Allotment LetterFile: 13 Proforma of Allotment Letter.pdf | 17 Jan 2025 |
| Proforma of AOSFile: 14 Proforma of AOS.pdf | 17 Jan 2025 |
| Stability Certificate of StructureFile: 15 Stability Certificate of Structure.pdf | 17 Jan 2025 |
| Source of Water NOCFile: 16 Source of Water NOC.pdf | 17 Jan 2025 |
| RTC, survey 179 | - |
| Mutation, survey 179 | - |
| Encumbrance Certificate, survey 179 | - |
| Conversion/Alienation Order, survey 179 | - |
| JDA, survey 179 | - |
| Khatha, survey 179 | - |
| Registration CertificateFile: Certificate of Incorporation.pdf | - |
| Memorandum of AssociationFile: 1 MOA.pdf | - |
| Article of AssociationFile: 1 AOA.pdf | - |
| GST CertificateFile: GST and Organization struct.pdf | - |
| Organization StructureFile: Organisation Chart.pdf | - |
| Certificate issued by CA Form 1File: Form 1 CA Certi.pdf | - |
| Certificate issued by Architect Form 2File: Form 2 - Architect certificate.pdf | - |
| Certificate issued by Engineer Form 3File: Form-3 Engineer Certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: No Litigation.pdf | - |
| Balance Sheet 2023 - 2024File: BalanceSheet with Schedules 2023-24.pdf | - |
| Balance Sheet 2022 - 2023File: Balancesheet with Schedule 2022-23.pdf | - |
| Balance Sheet 2021 - 2022File: Balancesheet With Schedules 2021-22.pdf | - |
| Audited Profit and Loss Statement 2023 - 2024File: P & L with Schedules 2023-24.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: Profit and Loss with Schedule 2022-23.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: Profit and Loss with Schedules 2021-22.pdf | - |
| Income Tax Return Acknowledgement 2023 - 2024File: ITR 2021-22.pdf | - |
| Income Tax Return Acknowledgement 2022 - 2023File: ITR 2022-23.pdf | - |
| Income Tax Return Acknowledgement 2021 - 2022File: ITR 2023-24.pdf | - |
| Auditor's Report 2023 - 2024File: Audit Report 2021-22.pdf | - |
| Auditor's Report 2022 - 2023File: Auditer's Report 2022-23.pdf | - |
| Auditor's Report 2021 - 2022File: Audit Report 2023-24.pdf | - |
| BDA NOC - Bagalur | - |
| Ground floor Plan | - |
| 1st,2nd,3rd floor Plan | - |
| PROJECT Specifications - KPPL | - |
| RERA AGREEMENT FOR SALE- KUMAR PLUMERIA | - |
| Allotment Letter Draft | - |
| Form B Affidavit | - |
| Section 3 Affidavit | - |
| JD Affidavit | - |
| Legal Report | - |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| KUMAR PROSPERA | Khata No 34 & 35, Sy No 15/2 & 16/2,Geddalahalli Village, Horamavu, KR Puram Hobli, Bangalore | Ongoing | Jun 2025 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep KUMAR PLUMERIA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 3 registered projects within 2 km.
Soul@Godrej Ananda
Universal Metro Properties LLP
Dioro & Beryl at Brigade El Dorado
Brigade Tetrarch Private Limited
Emerald & Luminaire Block at Brigade El Dorado
Brigade Tetrarch Private Limited
Northern Lights by Puravankara KVN
KVN Property Holdings LLP
Godrej Ananda Phase 2
Universal Metro Properties LLP
TVS EMERALD ALTURA
EMERALD HAVEN PROPERTIES PRIVATE LIMITED
See every Bengaluru Urban project, with the district possession charts
Builder: KUMAR PROPERTIES PRIVATE LIMITED
KUMAR PROPERTIES PRIVATE LIMITED has 2 registrations on RERA Karnataka, including KUMAR PLATINA and KUMAR PLUMERIA. Its filings declare 2 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if KUMAR PLUMERIA is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of KUMAR PLUMERIA?
The registered promoter entity is KUMAR PROPERTIES PRIVATE LIMITED, a company as per the filing. Its CIN U70101MH2000PTC216236 and GSTIN 29AABCK8464E1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in KUMAR PLUMERIA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at KUMAR PLUMERIA?
The professionals named in the filing: Architect: Anup Naik; Engineer: Karthikeyan B; Chartered Accountant: Supriya Abhijit Mundada. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KUMAR PLUMERIA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback