Home / Browse projects / Daman, Daman & Diu / Krishna Vaas

Registered No litigation declared Residential / Group Housing project

Krishna Vaas

By LAASYA LIFESPACES

RG-MH-70106 · RERA P49500000047 · Last updated on MahaRERA portal: 7 Jun 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Daman registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
9 of 11Construction stages donefurthest along: Installation of Lifts, 80%
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

Krishna Vaas is a Residential / Group Housing project by LAASYA LIFESPACES in Daman, Daman & Diu, registered with MahaRERA as P49500000047 on 5 Oct 2023. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NameKrishna Vaas
  • TypeResidential / Group Housing
  • Location
    • MAGARWADA
    • BEHIND VATSALYA SCHOOL NEAR ISCKON
    • Daman
    • 396220
  • Pincode396220
  • RERA no.P49500000047
  • ReraGenie IDRG-MH-70106

Builder

  • NameLAASYA LIFESPACES
  • Entity typePartnership
  • PartnersSATYEN LEELADHARAN MADATHIL PARAMPIL, BHAVIN RAMANBHAI PATEL, PRADIP AMARATBHAI HALPATI, Reshama SALIMBHAI Bhurani, LEELADHARAN MADATHILPARAMPIL KRISHNAN

Key dates

this monthRegisteredOct 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Oct 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed74 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Krishna Vaas BunglowNA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 80%.

Krishna Vaas Bunglow: 89% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 7 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes65%
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes40%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed4

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots4
Open Space4

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area357 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on5 Oct 2024

Approvals and building plan

Sanctioning authorityU.T. Administration of Dadar and Nagar Haveli and Daman & Diu The Collectorate, Moti Daman
Permissible FSI335.0
Proposed, not sanctioned335 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDATT SAGAR APARTMENT OPP SBI NANI DAMAN

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAbhikarma Design Pvt Ltd
EngineerProgressive Consultancy
EngineerBhadresh M Tandel
Chartered AccountantAnkit Vachhani & Co
Chartered AccountantAnkit Vachhani & Co.
PartnerRole in project
LAASYA LIFESPACES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: [ Final ] Architect's Certificate for RERA 05_04_2025.pdf7 Jun 2025
Form 2File: [ Final ] Engineer's Certificate for RERA 06_04_2025.pdf7 Jun 2025
Form 3File: [ Final ] CA's Certificate for RERA 06_06_2025.PDF7 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory March 2025.pdf7 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration March 2025.pdf7 Jun 2025
Form 1File: [ Final ] Architect's Certificate for RERA 04_03_2024.pdf7 Jun 2025
Form 2File: [ Final ] Engineer's Certificate for RERA 04_03_2024.pdf7 Jun 2025
Form 3File: [ Final ] Engineer's Certificate for RERA 04_03_2024.pdf7 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory March 2024.pdf7 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration March 2024.pdf7 Jun 2025
Form 1File: [ Final ] Architect's Certificate for RERA 04_03_2024.pdf7 Jun 2025
Form 2File: [ Final ] Engineer's Certificate for RERA 04_03_2024.pdf7 Jun 2025
Form 3File: [ Final ] CA's Certificate for RERA.pdf7 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory December 2023.pdf7 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration December 2023.pdf7 Jun 2025
Form 1File: [ Final ] Architect's Certificate for RERA 04_03_2024.pdf7 Jun 2025
Form 2File: [ Final ] Engineer's Certificate for RERA 04_03_2024.pdf7 Jun 2025
Form 3File: [ Final ] Engineer's Certificate for RERA 04_03_2024.pdf7 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory June 2024.pdf7 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration June 2024.pdf7 Jun 2025
Form 1File: [ Final ] Architect's Certificate for RERA 04_03_2024.pdf7 Jun 2025
Form 2File: [ Final ] Engineer's Certificate for RERA 04_03_2024.pdf7 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory September 2024.pdf7 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration September 2024.pdf7 Jun 2025
Form 3File: [ Final ] CA's Certificate for RERA.pdf7 Jun 2025
Form 1File: [ Final ] Architect's Certificate for RERA 04_03_2024.pdf7 Jun 2025
Form 2File: [ Final ] Engineer's Certificate for RERA 04_03_2024.pdf7 Jun 2025
Form 3File: [ Final ] CA's Certificate for RERA.pdf7 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory December 2024.pdf7 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration December 2024.pdf7 Jun 2025
Form 2A (FY 2024-2025)File: [ Final ] Engineer's Annual Certificate for RERA 09_09_2024.pdf6 Jun 2025
Form 2A (FY 2023-2024)File: [ Final ] Engineer's Annual Certificate for RERA 05_04_2025.pdf6 Jun 2025
Form 5 (FY 2024-2025)File: [ Final ] CA's Annual Certificate for RERA 06_06_2025 (1).PDF6 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: Form 1.pdf23 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: [ Final ] CA's Certificate for RERA 30_11_2024.PDF23 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: [ Final ] Engineer's Certificate for RERA 29_11_2024.pdf23 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: [ Final ] Architect's Certificate for RERA 04_03_2024.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: [ Final ] Engineer's Certificate for RERA 04_03_2024.pdf10 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A)File: [ Final ] Engineer's Annual Certificate for RERA 09_09_2024.pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: [ Final ] CA's Annual Certificate for RERA 19_09_2024.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1) (UT)File: [ Final ] Architect's Certificate for RERA 04_03_2024.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2) (UT)File: [ Final ] Engineer's Certificate for RERA 04_03_2024.pdf10 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A)File: [ Final ] Engineer's Annual Certificate for RERA 09_09_2024.pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: [ Final ] CA's Annual Certificate for RERA 19_09_2024.pdf10 Oct 2024
Form 5 (FY 2023-2024)File: [ Final ] CA's Annual Certificate for RERA 19_09_2024.pdf2 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3) (UT)File: [ Final ] CA's Certificate for RERA (2).PDF13 Sep 2023
Commencement CertificatesFile: undertaking for name of promoter in CC.pdf25 Aug 2023
Other - LegalFile: Deed Part-1.pdf25 Aug 2023
Other - LegalFile: Deed Part-2.pdf25 Aug 2023
Other - TechnicalFile: Deed Part-1.pdf25 Aug 2023
Other - TechnicalFile: Deed Part-2.pdf25 Aug 2023
Copy of the legal title reportFile: Revised_Title Certificate.pdf22 Aug 2023
Commencement CertificatesFile: Undertaking For Authenticity of CC.pdf22 Aug 2023
Commencement CertificatesFile: Undertaking For CC.pdf22 Aug 2023
Details of encumbrances concerned to LegalFile: Legal and financial encumbrance.pdf18 Jul 2023
Details of encumbrances concerned to FinanceFile: Legal and financial encumbrance.pdf18 Jul 2023
Commencement CertificatesFile: PLot 11_Construction Approval Certificate.pdf18 Jul 2023
CERSAI detailsFile: noc NO SECURITY INTEREST CHARGED.pdf18 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate Bank Account detail.pdf18 Jul 2023
Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf9 Jun 2023
Building plan approvalFile: 1 Building IOD (1).pdf9 Jun 2023
Building plan approvalFile: 2 Building IOD (2).pdf9 Jun 2023
Building plan approvalFile: 3 Building IOD (3).pdf9 Jun 2023
PAN CardFile: 1 PAN Card.pdf9 Jun 2023
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout).pdf9 Jun 2023
Building Plan Approval (IOD)File: 1 Building IOD (1).pdf9 Jun 2023
Building Plan Approval (IOD)File: 2 Building IOD (2).pdf9 Jun 2023
Building Plan Approval (IOD)File: 3 Building IOD (3).pdf9 Jun 2023
Declaration in FORM BFile: 1 Declaration in FORM B.pdf9 Jun 2023
Annual Report / Audited Financial Statements for the immediately preceding three financial yearsFile: 1 Annual Report _ Audited Financial Statements for the immediately preceding three financi9 Jun 2023
Proforma of Allotment letterFile: 1 Proforma of Allotment letter.pdf9 Jun 2023
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale.pdf9 Jun 2023
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter.pdf9 Jun 2023
Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement.pdf9 Jun 2023

How this compares with Daman

18%of Daman projects moved their completion datethis one has not
35%of Daman registrations have lapsed or been cancelledthis one is on the register

Computed across the 59 Daman projects on ReraGenie, from their own filings.

Keep Krishna Vaas on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BEHIND VATSALYA SCHOOL NEAR ISCKON59 in Daman

Builder: LAASYA LIFESPACES

LAASYA LIFESPACES has 1 registration on MahaRERA, including Krishna Vaas. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Daman district page.

Frequently asked questions

What are my rights if Krishna Vaas is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Krishna Vaas?

The registered promoter entity is LAASYA LIFESPACES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Krishna Vaas?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Krishna Vaas?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Krishna Vaas?

The professionals named in the filing: Architect: Abhikarma Design Pvt Ltd; Engineer: Progressive Consultancy; Engineer: Bhadresh M Tandel; Chartered Accountant: Ankit Vachhani & Co; Chartered Accountant: Ankit Vachhani & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Krishna Vaas?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Krishna Vaas. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Krishna Vaas to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.