Home / Browse projects / Nagpur, Maharashtra / KRISHNA LEELAA-3

Registered No litigation declared Residential / Group Housing project

KRISHNA LEELAA-3

By JARRY PROFITS

RG-MH-03977 · RERA P50500032873 · Last updated on MahaRERA portal: 19 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
7 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 99%
6 of 56Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 105 documents Report an error

KRISHNA LEELAA-3 is a Residential / Group Housing project by JARRY PROFITS in Nagpur, Maharashtra, registered with MahaRERA as P50500032873 on 2 Feb 2022. Possession is promised by 30 Jun 2027. 50 of the 56 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameKRISHNA LEELAA-3
  • TypeResidential / Group Housing
  • Location
    • NEAR JARIPATKA
    • NARA
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440014
  • Pincode440014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500032873
  • ReraGenie IDRG-MH-03977

Builder

  • NameJARRY PROFITS
  • Entity typePartnership
  • PartnersYOGESH BALIRAM SAHAJRAMANI, Anil Tarachand Wadhwani
  • Other registrations4 more →
  • Completed4 of 5

Key dates

this monthRegisteredFeb 2022PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Feb 2022
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed105 files

Current status

89%50 of 56 units booked
75.1%Work done, per cost certificate

Figures as on 19 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KRISHNA LEELAA-3NA9756056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 99%.

KRISHNA LEELAA-3: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises99%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%

Progress on shared amenities15

As on 19 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes98%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes92%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes95%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes97%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered1
Open Space1

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,769 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Oct 2025

Approvals and building plan

Sanctioning authorityNagpur Improvement Trust
Permissible FSI4950.24
Proposed, not sanctioned4,950 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSME RAVINAGAR BRANCH NAGPUR-440033
Estimated costRs 10.37 cr
Cost incurredRs 7.79 cr
Work done75.12%
BuildingWingEstimatedIncurred
KRISHNA LEELAA-3NARs 10.05 crRs 7.54 cr
-NARs 32.01 lakhRs 25.29 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEMANATE DESIGN LOKESH KADU
EngineerRAJESH BATWANI
EngineerANIL WADHWANI
Chartered AccountantG & D ASSOCIATES
Chartered AccountantSUMIT AGRAWAL
Chartered AccountantG A D & ASSOCIATES
PartnerRole in project
JARRY PROFITS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed105

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1 SEPT-25 SCANNED.pdf19 Apr 2026
Withdrawal Update Form 2File: FORM-2 SEPT-25 GENERATED.pdf19 Apr 2026
Withdrawal Update Form 3File: FORM-3 SEPT-25 SCANNED COMPRESSED.pdf19 Apr 2026
Form 5 (FY 2024-2025)File: FORM-5 MARCH-2025 SCANNED.pdf29 Jan 2026
Withdrawal Update Form 1File: FORM-1 SEPT-25 SCANNED.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM-2 SEPT-25 GENERATED.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM-3 SEPT-25 SCANNED COMPRESSED.pdf20 Jan 2026
Withdrawal Update Form 1File: FORM-1 JUN-25.pdf28 Oct 2025
Withdrawal Update Form 1File: FORM-1 SEPT-25 SCANNED.pdf28 Oct 2025
Withdrawal Update Form 2File: FORM-2 JUN-25.pdf28 Oct 2025
Withdrawal Update Form 2File: FORM-2 SEPT-25 GENERATED.pdf28 Oct 2025
Withdrawal Update Form 3File: FORM-3 JUN-25 SCANNED COMPRESSED.pdf28 Oct 2025
Withdrawal Update Form 3File: FORM-3 SEPT-25 SCANNED COMPRESSED.pdf28 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 KL3.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 KRISHNA LEELAA-3 02-01-2025.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 KRISHNA LEELAA-3 06-04-2025.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 KL3.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 KL3.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K L 3 F1.pdf21 Apr 2025
Certificates of CA (Form 3)File: KRISHNA LEELA 3 F3 MAR 25.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K L 3 F2.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: K L 3 S UNS.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD.pdf26 Feb 2025
Certificates of CA (Form 3)File: FORM-3.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf25 Feb 2025
Certificates of CA (Form 3)File: FOrm 3 Krishna Leela-3_Sep-2024.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Krishna Leela-3_Form-2-Engineers Certificate_SEPT-24.pdf2 Dec 2024
Disclosure of sold/ booked inventoryFile: KRISHNA LEELAA-3_SOLD AND UNSOLD_SEP-24.pdf2 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 Krishna Leela-3_Mar-24.pdf25 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 KRISHNA LEELAA-3 08-10-2024.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Krishna Leela-3_Form-2-Engineers Certificate_June-24.pdf16 Aug 2024
Disclosure of sold/ booked inventoryFile: KRISHNA LEELAA-3_SOLD AND UNSOLD_JUNE-24.pdf16 Aug 2024
Certificates of CA (Form 3)File: FORM-3_Krishna Leelaa-3_June-24.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 KRISHNA LEELA -3 01-07-2024.pdf3 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Krishna Leela-3_Form-2-Engineers Certificate_Mar-24.pdf10 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Krishna Leelaa-3_RERA_Form 2A_MAR-24.pdf10 May 2024
Disclosure of sold/ booked inventoryFile: KRISHNA LEELAA-3_SOLD AND UNSOLD_MAR-24.pdf10 May 2024
Certificates of CA (Form 3)File: FORM-3_Krishna Leelaa-3_Mar-24.pdf10 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Krishna Leelaa-3_RERA_Form 2A_MAR-24.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Krishna leela-3_Form-1- Architect Certificate_Mar-24.pdf6 Apr 2024
Details of encumbrancesFile: ENCUMBRANCE_KL-3.pdf11 Mar 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE_KL-3.pdf11 Mar 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCE_KL-3.pdf11 Mar 2024
Declaration in FORM BFile: FORM-B.pdf11 Mar 2024
Disclosure of sold/ booked inventoryFile: KRISHNA LEELAA-3_SOLD AND UNSOLD_MAR-22.pdf14 Feb 2024
Disclosure of sold/ booked inventoryFile: KRISHNA LEELAA-3_SOLD AND UNSOLD_SEP-22.pdf14 Feb 2024
Disclosure of sold/ booked inventoryFile: KRISHNA LEELAA-3_SOLD AND UNSOLD_DEC-22.pdf14 Feb 2024
Disclosure of sold/ booked inventoryFile: KRISHNA LEELAA-3_SOLD AND UNSOLD_MAR-23.pdf14 Feb 2024
Disclosure of sold/ booked inventoryFile: KRISHNA LEELAA-3_SOLD AND UNSOLD_JUNE-23.pdf14 Feb 2024
Disclosure of sold/ booked inventoryFile: KRISHNA LEELAA-3_SOLD AND UNSOLD_SEP-23.pdf14 Feb 2024
Disclosure of sold/ booked inventoryFile: KRISHNA LEELAA-3_SOLD AND UNSOLD_DEC-23.pdf14 Feb 2024
Certificates of CA (Form 3)File: FORM-3_Krishna Leelaa-3_Sept-23.pdf14 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Krishna Leela-3_Form-2-Engineers Certificate_Dec-23.pdf13 Feb 2024
Certificates of CA (Form 3)File: FORM-3_Krishna Leelaa-3_Dec-23_.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1 KRISHNA LEELAA-3 DEC-23.pdf8 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Krishna Leela-3_Form-2-Engineers Certificate_Mar-22.pdf2 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Krishna Leela-3_Form-2-Engineers Certificate_Sept-22.pdf2 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Krishna Leela-3_Form-2-Engineers Certificate_Dec-22.pdf2 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Krishna Leela-3_Form-2-Engineers Certificate_Mar-23.pdf2 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Krishna Leela-3_Form-2-Engineers Certificate_June-23.pdf2 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Krishna Leela-3_Form-2-Engineers Certificate_Sept-23.pdf2 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Krishna Leelaa-3_RERA_Form 2A_MAR-22.pdf1 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Krishna Leelaa-3_RERA_Form 2A_MAR-23.pdf1 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_FORM 1 KRISHNA LEELAA - 3 _mar-23-min.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2_FORM 1 KRISHNA LEELAA - 3 June-23-min.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3_FORM 1 KRISHNA LEELAA - 3 Sep-23-min.pdf20 Oct 2023
Certificates of CA (Form 3)File: FORM 3 KRISHNA LEELA -3 JUNE 2023.pdf20 Oct 2023
Certificates of CA (Form 3)File: FORM 3 KRISHNA LEELA -3 SEP 2023.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: KRISHNA LEELA-3_from 5 22-23.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: KRISHNA LEELA-3_FORM-5.pdf6 Oct 2023
Certificates of CA (Form 3)File: FORM-3_Krishna Leelaa-3_Sept-22.pdf23 Aug 2023
Certificates of CA (Form 3)File: FORM-3_Krishna Leelaa-3_Dec-22.pdf23 Aug 2023
Certificates of CA (Form 3)File: FORM-3_Krishna Leelaa-3_Mar-23.pdf23 Aug 2023
Certificates of CA (Form 3)File: Krishna Leelaa-3 form5.pdf14 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Krishna Leelaa-3 form5March2022.pdf13 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KRISHNA LEELAA-3.pdf6 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: KRISHNA LEELA 3 RERA.pdf10 Nov 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: DOD KL-3_11zon (2).pdf11 Oct 2022
Foreclosure of the ProjectFile: DOD KL-3_11zon (2).pdf11 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: KL-3 2_11zon.pdf28 Jul 2022

How this compares with Nagpur

89%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KRISHNA LEELAA-3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NARA2,800+ in Nagpur

2 kmKRISHNA LEELAA-3Completed 12Lapsed / revoked 6Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 31 registered projects within 2 km.

Builder: JARRY PROFITS

JARRY PROFITS has 5 registrations on MahaRERA, including ANUPAMA-AMRAPALI HEIGHTS and AMRAPALI PHASE-II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if KRISHNA LEELAA-3 is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KRISHNA LEELAA-3?

The registered promoter entity is JARRY PROFITS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KRISHNA LEELAA-3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KRISHNA LEELAA-3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KRISHNA LEELAA-3?

The professionals named in the filing: Architect: EMANATE DESIGN LOKESH KADU; Engineer: RAJESH BATWANI; Engineer: ANIL WADHWANI; Chartered Accountant: G & D ASSOCIATES; Chartered Accountant: SUMIT AGRAWAL; Chartered Accountant: G A D & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KRISHNA LEELAA-3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KRISHNA LEELAA-3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KRISHNA LEELAA-3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.