Home / Browse projects / Raigarh, Maharashtra / KRANTIBHUMI COOPERATIVE HOUSING SOCIETY -SILVER HEIGHT

Registered No litigation declared Others project

KRANTIBHUMI COOPERATIVE HOUSING SOCIETY -SILVER HEIGHT

By CHANDRAKAUMUDI CONSTRUCTION

RG-MH-85823 · RERA P52000011017 · Last updated on MahaRERA portal: 27 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2031Possession promisedno revision filed
20 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 70%
49 of 62Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 48 documents Report an error

KRANTIBHUMI COOPERATIVE HOUSING SOCIETY -SILVER HEIGHT is a Others project by CHANDRAKAUMUDI CONSTRUCTION in Raigarh, Maharashtra, registered with MahaRERA as P52000011017 on 31 Aug 2017. Possession is promised by 30 Dec 2031. 13 of the 62 units on this registration are recorded sold or booked, and 20 of 33 construction stages are filed complete.

At a glance

Project

  • NameKRANTIBHUMI COOPERATIVE HOUSING SOCIETY -SILVER HEIGHT
  • TypeOthers
  • Location
    • MAHAD
    • -
    • Shirgaon
    • Raigarh
    • 402301
  • Pincode402301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000011017
  • ReraGenie IDRG-MH-85823

Builder

  • NameCHANDRAKAUMUDI CONSTRUCTION
  • Entity typePartnership
  • PartnersUDAY PAYELKAR, MANOJ CHANDRAKANT PAYELKAR, GIRISH CHANDRAKANT PAYELKAR
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects3 →

Key dates

this monthRegisteredAug 2017PromisedDec 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Aug 2017
  • Promised completion30 Dec 2031
  • Revised completionNone
  • Buildings3 building records
  • Documents filed48 files

Current status

21%13 of 62 units booked
54.2%Work done, per cost certificate

Figures as on 27 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KRANTIBHUMI COOPERATIVE HOUSING SOCIETY -SILVER HEIGHT 1ST BLOCKNA5513922
KRANTIBHUMI COOPERATIVE HOUSING SOCIETY - SILVER HEIGHT2ND BLOCKNA55202
KRANTIBHUMI COOPERATIVE HOUSING SOCIETY - SILVER HEIGHT 3RD BLOCKNA5538038

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 70%.

KRANTIBHUMI COOPERATIVE HOUSING SOCIETY -SILVER HEIGHT 1ST BLOCK64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
KRANTIBHUMI COOPERATIVE HOUSING SOCIETY - SILVER HEIGHT2ND BLOCK64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
KRANTIBHUMI COOPERATIVE HOUSING SOCIETY - SILVER HEIGHT 3RD BLOCK61%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed161

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots161
Open Space161
BuildingOpen SpaceTotal
KRANTIBHUMI COOPERATIVE HOUSING SOCIETY -SILVER HEIGHT 1ST BLOCK5252
KRANTIBHUMI COOPERATIVE HOUSING SOCIETY - SILVER HEIGHT2ND BLOCK5252
KRANTIBHUMI COOPERATIVE HOUSING SOCIETY - SILVER HEIGHT 3RD BLOCK5757

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,300 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Apr 2026
LandownerVillageDistrict
KRANTIBHUMI COOPERATIVE HOUSING SOCIETYMahadRaigarh

Approvals and building plan

Permissible FSI3179.19
Proposed, not sanctioned3,179 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAHAD
Estimated costRs 13.20 cr
Cost incurredRs 7.15 cr
Work done54.16%
BuildingWingEstimatedIncurred
-NARs 7.20 crRs 3.57 cr
KRANTIBHUMI COOPERATIVE HOUSING SOCIETY - SILVER HEIGHT 3RD BLOCKNARs 2.92 crRs 59.26 lakh
KRANTIBHUMI COOPERATIVE HOUSING SOCIETY -SILVER HEIGHT 1ST BLOCKNARs 1.98 crRs 1.98 cr
KRANTIBHUMI COOPERATIVE HOUSING SOCIETY - SILVER HEIGHT2ND BLOCKNARs 1.10 crRs 1.00 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR SNEHAL JAIN SNEHAL JAIN
EngineerRagil Ramesh Nair Ramesh Nair
Chartered AccountantJIGNESH GALA JIFNESH GALE
Chartered Accountantbhagyesh dhanji gada
PartnerRole in project
CHANDRAKAUMUDI CONSTRUCTION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2031

Documents filed48

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf27 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf27 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf27 Apr 2026
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE.pdf25 Apr 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE.pdf25 Apr 2026
Withdrawal Update Form 3File: CA CERTIFICATE.pdf25 Apr 2026
Form 1File: FROM NO 1.pdf5 Feb 2026
Form 2File: FROM NO 2.pdf5 Feb 2026
Form 3File: FROM NO 3.pdf5 Feb 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD LIST CHANDRAKAUMODI COUNTRACTION 1-10-2025 TO 31-12-2025.pdf5 Feb 2026
Form 1File: Architect Certificate.pdf5 Nov 2025
Form 2File: Engineer Certificate.pdf5 Nov 2025
Form 3File: FORM 3.pdf5 Nov 2025
Disclosure of Sold and Booked InventoryFile: CHANDRAKAUMODI CONTRACTION SOLD UNSOLD DETAILS 30-9-2025.pdf5 Nov 2025
Form 5 (FY 2024-2025)File: FORM 5 2025.pdf28 Jul 2025
Certificates of CA (Form 3)File: Form 3 19-3-2025.pdf24 Mar 2025
Certificates of CA (Form 3)File: FORM 3 CHANDRAKAUKUDI.pdf12 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE SILVER HEIGHTS 31-4-24.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 1-10-24.pdf16 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: Architects Certificate Chandrakaumudi Construction 10-4-24.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE SILVER HEIGHTS 31-4-24.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate 3-10-24.pdf16 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2017-18.pdf25 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: 2017-18.pdf25 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2018-19.pdf25 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 2019-20.pdf25 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 2020-21.pdf25 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 12.pdf25 Jan 2023
OtherFile: NA ORDER.pdf13 Apr 2018
OtherFile: SOCIETY REGISTRATION CERTIFICATE.pdf13 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: NA PERMISSION.pdf12 Apr 2018
Proforma of Allotment letterFile: PROFORMA OF APPLICATION LETTER.pdf18 Aug 2017
Proforma of Allotment letterFile: PROFORMA OF ALLOTMENT LETTER.pdf18 Aug 2017
Layout approvalFile: SILVER HEIGHTS -LAYOUT.pdf17 Aug 2017
Layout approvalFile: PLAN LAYOUT.pdf17 Aug 2017
Copy of the legal title reportFile: TITLE SEARCH REPORT.pdf17 Aug 2017
Copy of Layout Approval (in case of layout)File: SILVER HEIGHTS -LAYOUT.pdf17 Aug 2017
Copy of Layout Approval (in case of layout)File: PLAN LAYOUT.pdf17 Aug 2017
OtherFile: SOCIETY REGISTRATION CERTIFICATE.pdf17 Aug 2017
OtherFile: VILLAGE EXTRACT.pdf17 Aug 2017
Building plan approvalFile: KRANTI BHUMI CO-OPEARTIVE HOUSING SOCIETY.pdf14 Aug 2017
Building plan approvalFile: PLAN LAYOUT.pdf14 Aug 2017
PAN CardFile: PAN - FIRM.pdf14 Aug 2017
Details of encumbrancesFile: Details of Encumbrances 1.pdf14 Aug 2017
Building Plan Approval (IOD)File: KRANTI BHUMI CO-OPEARTIVE HOUSING SOCIETY.pdf14 Aug 2017
Building Plan Approval (IOD)File: PLAN LAYOUT.pdf14 Aug 2017
Declaration in FORM BFile: DECLARATION CUM AFFIDAVIT - FORM B.pdf14 Aug 2017
Certificates of CA (Form 3)File: CA CERTIFICATE.pdf14 Aug 2017

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
PARVATI ARACDETAMBAT BHUVAN MAHAD RAIGAD - 4023011CompletedDec 2019Dec 2019
KRUSHNA ARCADEGAVAL ALI MAHAD RAIGAD 4023012CompletedApr 2017Apr 2017
CITY PRIDE RESIDENCYPRABHAT COLONY MAHAD - RAIGAD 4023012CompletedApr 2017Apr 2017

How this compares with Raigarh

21%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KRANTIBHUMI COOPERATIVE HOUSING SOCIETY -SIL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near -5,900+ in Raigarh

2 kmKRANTIBHUMI COOPERATIVE Completed 19Lapsed / revoked 18Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 46 registered projects within 2 km.

Builder: CHANDRAKAUMUDI CONSTRUCTION

CHANDRAKAUMUDI CONSTRUCTION has 2 registrations on MahaRERA, including PARVATI ARCADE and KRANTIBHUMI COOPERATIVE HOUSING SOCIETY -SILVER HEIGHT. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if KRANTIBHUMI COOPERATIVE HOUSING SOCIETY -SILVER HEIGHT is delayed beyond 30 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KRANTIBHUMI COOPERATIVE HOUSING SOCIETY -SILVER HEIGHT?

The registered promoter entity is CHANDRAKAUMUDI CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KRANTIBHUMI COOPERATIVE HOUSING SOCIETY -SILVER HEIGHT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KRANTIBHUMI COOPERATIVE HOUSING SOCIETY -SILVER HEIGHT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KRANTIBHUMI COOPERATIVE HOUSING SOCIETY -SILVER HEIGHT?

The professionals named in the filing: Architect: AR SNEHAL JAIN SNEHAL JAIN; Engineer: Ragil Ramesh Nair Ramesh Nair; Chartered Accountant: JIGNESH GALA JIFNESH GALE; Chartered Accountant: bhagyesh dhanji gada. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KRANTIBHUMI COOPERATIVE HOUSING SOCIETY -SILVER HEIGHT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KRANTIBHUMI COOPERATIVE HOUSING SOCIETY -SILVER HEIGHT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KRANTIBHUMI COOPERATIVE HOUSING SOCIETY -SIL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.