Home / Browse projects / Aurangabad, Maharashtra / KISAN PARK
KISAN PARK
RG-MH-08228 · RERA P51500018345 · Last updated on MahaRERA portal: 3 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 24 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KISAN PARK is a Residential / Group Housing project by KALYANRAO KISANRAO AUTADE in Aurangabad, Maharashtra, registered with MahaRERA as P51500018345 on 23 Oct 2018. Possession is promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing. 67 of the 116 units on this registration are recorded sold or booked, and 5 of 55 construction stages are filed complete.
At a glance
Project
- NameKISAN PARK
- TypeResidential / Group Housing
- Location
- NAREGAON ROAD
- PISADEVI
- Aurangabad
- 431008
- Pincode431008
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51500018345
- ReraGenie IDRG-MH-08228
Builder
- NameKALYANRAO KISANRAO AUTADE
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on23 Oct 2018
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2024)
- Buildings5 building records
- Documents filed90 files
Current status
Figures as on 3 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING GH | NA | 6 | 0 | 32 | 0 | 32 |
| EF BUILDING | NA | 6 | 0 | 33 | 0 | 33 |
| B1,B2,B3,B4,B5 Building | NA | 3 | 0 | 25 | 0 | 25 |
| BUILDING C | NA | 3 | 0 | 4 | 0 | 4 |
| A BUILDING | NA | 3 | 0 | 16 | 6 | 22 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 3 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Excavation, at 97%.
BUILDING GH28%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 1% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 5% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
EF BUILDING23%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 1% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 52% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B1,B2,B3,B4,B5 Building49%
| Activity | Progress |
|---|---|
| Excavation | 97% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 90% |
| Stilt Floor | 50% |
| Slabs of Super Structure | 75% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 75% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING C0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 1% |
| Podiums (if any) | 0% |
| Plinth | 1% |
| Stilt Floor | 1% |
| Slabs of Super Structure | 2% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
A BUILDING0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 5% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 3 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 95% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 90% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 45% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 35% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed2
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| BUILDING GH | 1 | 1 |
| EF BUILDING | 1 | 1 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| EF BUILDING | NA | Rs 580 | Rs 310 |
| B1,B2,B3,B4,B5 Building | NA | Rs 448 | Rs 98 |
| BUILDING GH | NA | Rs 360 | Rs 360 |
| A BUILDING | NA | Rs 351 | - |
| - | NA | Rs 125 | Rs 97 |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SAURABH MIRKUTE |
| Architect | DHANANJAY B DOIFODE |
| Engineer | PRADEEP MOTE |
| Chartered Accountant | Gopal S Malpani |
| Chartered Accountant | ARJUN APTE AND ASSOCIATES |
| Chartered Accountant | NVM and Associates |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe have mentioned how we can complete our project till 31-12-2026
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Oct 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Oct 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Jul 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed90
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form-1 Q-4.pdf | 3 Jun 2026 |
| Form 2File: Form-2 Q-4.pdf | 3 Jun 2026 |
| Form 3File: Form-3 Q-4.pdf | 3 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory.pdf | 3 Jun 2026 |
| Withdrawal Update Form 1File: Form-1 Q-4.pdf | 3 Jun 2026 |
| Withdrawal Update Form 2File: Form-2 Q-4.pdf | 3 Jun 2026 |
| Withdrawal Update Form 3File: Form-3 Q-4.pdf | 3 Jun 2026 |
| Form 2A (FY 2025-2026)File: Kalyanrao_Form-2A.pdf | 30 May 2026 |
| Form 2A (FY 2023-2024)File: 2A 2023-24.pdf | 1 Aug 2025 |
| Form 2A (FY 2024-2025)File: Form -2A.pdf | 1 Aug 2025 |
| Form 1File: Form-1 Q-3.pdf | 21 Jun 2025 |
| Form 2File: form 2 Q-3.pdf | 21 Jun 2025 |
| Form 3File: Form-3 Q 3.pdf | 21 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory.pdf | 21 Jun 2025 |
| Details of encumbrances concerned to FinanceFile: 1 Details of encumbrances (9).pdf | 23 Feb 2025 |
| Declaration in FORM BFile: Form B (3).pdf | 23 Feb 2025 |
| Declaration about Commencement CertificateFile: Format-D.pdf | 23 Feb 2025 |
| CERSAI detailsFile: CERSAI .pdf | 23 Feb 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A (1).pdf | 23 Feb 2025 |
| Details of encumbrances concerned to LegalFile: 1 Details of encumbrances (9).pdf | 23 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf | 23 Feb 2025 |
| PAN CardFile: Kalyan Autade Pan Card.pdf | 6 Feb 2025 |
| Certificates of CA (Form 3)File: Form-3 Q 3.pdf | 18 Jan 2025 |
| Certificates of CA (Form 3)File: Form-3 Q 2.pdf | 18 Jan 2025 |
| Certificates of CA (Form 3)File: Form-3 Q-1.pdf | 18 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: 06 Dec-24.pdf | 18 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: 05 Sep-24.pdf | 18 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: 04 Jun-24.pdf | 18 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: 03 Mar-24.pdf | 18 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: 02 Dec-23.pdf | 18 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: 01 Sep-23.pdf | 18 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5.pdf | 18 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Q-1.pdf | 17 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Q-2.pdf | 17 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Q-3.pdf | 17 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Q-3.pdf | 17 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Q-2.pdf | 17 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Q-1.pdf | 17 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A 2022-23.pdf | 17 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A 2023-24.pdf | 17 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Q-4_Final.pdf | 8 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Q-3_Final.pdf | 8 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q-1.pdf | 7 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q-2.pdf | 7 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q-3.pdf | 7 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q-4.pdf | 7 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Q-1_Final.pdf | 7 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Q-2.pdf | 7 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q-3.pdf | 7 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q-2.pdf | 7 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q-1.pdf | 7 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q-4.pdf | 7 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q1.pdf | 12 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q2.pdf | 12 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q3.pdf | 12 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q4.pdf | 12 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q1.pdf | 12 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q2.pdf | 12 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q3.pdf | 12 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q4.pdf | 12 Jan 2024 |
| Certificates of CA (Form 3)File: FORM 3 Q1.pdf | 12 Jan 2024 |
| Certificates of CA (Form 3)File: FORM 3 Q2.pdf | 12 Jan 2024 |
| Certificates of CA (Form 3)File: FORM 3 Q3.pdf | 12 Jan 2024 |
| Certificates of CA (Form 3)File: FORM 3 Q4.pdf | 12 Jan 2024 |
| Certificates of CA (Form 3)File: form 3 final.pdf | 3 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf | 16 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Engineer's Certificate 19-20.pdf | 6 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Engineer's Certificate 20-21.pdf | 6 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Engineer's Certificate 21-22.pdf | 6 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 1 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 1 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5.pdf | 1 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 18-19 -Form -5.pdf | 30 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 19-20-Form-5.pdf | 30 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 20-21-Form-5.pdf | 30 Mar 2022 |
| Building plan approvalFile: Cidco Building Permission.pdf | 6 Jul 2020 |
| Building Plan Approval (IOD)File: Cidco Building Permission.pdf | 6 Jul 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf | 6 Jul 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_FORM 1.pdf | 6 Jul 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate_FORM 2.pdf | 6 Jul 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 90 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep KISAN PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PISADEVI1,400+ in Aurangabad
Filed coordinates, straight-line distance. 16 registered projects within 2 km.
SARA NIWARA
Sara Infrastructures
Sawangi City Phase-2
Aryaman Infra
JANKI HEIGHTS
SHREE BALAJI BUILDCON
Rajgad- Swaraj Nagar
M S M Infra
Swapna Srushti 1
M/s Nisha Associates
SHRI VITHUMAULI PARK
SHRI VITTHUMAULI CONSTRUCTIONS BUILDERS AN
See every Aurangabad project, with the district possession charts
Builder: KALYANRAO KISANRAO AUTADE
KALYANRAO KISANRAO AUTADE has 1 registration on MahaRERA, including KISAN PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What are my rights if KISAN PARK is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KISAN PARK?
The registered promoter entity is KALYANRAO KISANRAO AUTADE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KISAN PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for KISAN PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KISAN PARK?
The professionals named in the filing: Architect: SAURABH MIRKUTE; Architect: DHANANJAY B DOIFODE; Engineer: PRADEEP MOTE; Chartered Accountant: Gopal S Malpani; Chartered Accountant: ARJUN APTE AND ASSOCIATES; Chartered Accountant: NVM and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KISAN PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback