ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / KINGSBURY PHASE III

Completed No litigation declared Residential / Group Housing project

KINGSBURY PHASE III

By Jaikul Associates

RG-MH-15400 · RERA P52100023913 · Last updated on MahaRERA portal: 13 Feb 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2025Possession promisedregistration recorded completed
60 of 66Construction stages doneacross 6 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

KINGSBURY PHASE III is a Residential / Group Housing project by Jaikul Associates in Pune, Maharashtra, registered with MahaRERA as P52100023913 on 14 Jan 2020. The registration is recorded completed; possession was promised by 30 Apr 2025.

At a glance

Project

  • NameKINGSBURY PHASE III
  • TypeResidential / Group Housing
  • Location
    • DY PATIL COLLEGE ROAD
    • CHARHOLI
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • RERA no.P52100023913
  • ReraGenie IDRG-MH-15400

Builder

  • NameJaikul Associates
  • Entity typeOthers
  • Named personsVikas Kulkarni, Sandeep Kulkarni, RISHABH JAIN
  • Other registrations4 more →
  • Completed5 of 5

Key dates

this monthRegisteredJan 2020PromisedApr 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Jan 2020
  • Promised completion30 Apr 2025
  • Revised completionNone
  • Buildings6 building records
  • Documents filed54 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1NA180000
A2NA180000
B1NA180000
B2NA180000
H1NA180000
H2NA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 13 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

60 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Podiums (if any), at 0%.

A191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
H191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
H291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed304

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots304
Closed/Covered288
Open Space16
BuildingClosed/CoveredOpen SpaceTotal
A1404
A2404
B170474
B270474
H170474
H270474

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,773 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI55339.91
Proposed, not sanctioned35,874 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMODEL COLONY SHIVAJI NAGAR PUNE 411016

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAVINASH ANNASAHEB PATIL
EngineerMILIND BHOITE
Chartered AccountantBRIJ MANTRI & COMPANY
PartnerRole in project
Jaikul Associates-

Litigation declared2

CaseCourtStatus
29/2009CIVIL JUDGE JUNIOR DIVISIONAT EVIDENCE STAGE
225/2009MUMBAI HIGH COURTADMITTED BUT NO PREVENTIVE ORDER IN THE SECOND APPEAL

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Dec 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 May 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 May 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 May 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Oct 2023

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: KINGSBURY.pdf13 Feb 2024
Architect’s Certificate on Completion of Project (Form 4)File: ARCHI CERT KINGSBURY PH III AND COMPLETION B1 B2 H1 H2.pdf1 Dec 2023
Other - TechnicalFile: FORM 4 KB A BUILDING.pdf1 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: C A CERT KINGSBURY PH III 01112023.pdf10 Nov 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCCUPATION CERTIFICATE KB A BUILDING.pdf5 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: qulity kb ph 3.pdf7 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ARCHI CERT KINGSBURY PH III AND COMPLETION B1 B2 H1 H2.pdf30 Jun 2023
Other - TechnicalFile: ARCHI CERT KINGSBURY PH III AND COMPLETION B1 B2 H1 H2.pdf27 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: KINGSBURY QUALITY.pdf12 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT KINGSBURY PH III 31122022.pdf10 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERT KINGSBURY PH III 31122022.pdf10 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QTY ASSURANCE CERT KINGSBURY PH III 31122022.pdf10 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 KINGSBURY PH III 21112022.pdf24 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: KB Phase III Quality.pdf14 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: KINGSBURY QULITY.pdf20 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: kingsbury ph 3 qulity.pdf12 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Kingsburry Phase III.PDF2 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Kingsbury Phase III.PDF10 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QTY ASSURANCE CERT KINGSBUTY PH III 31122021.pdf6 Jan 2022
CERSAI detailsFile: Jaikul Associates.pdf6 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: kingsbury sector 2 ph 3.pdf9 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Kingsbury Phase III.pdf6 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QULITY KB Phase III.pdf17 Jul 2021
Layout approvalFile: sec 2 layout copy.pdf8 May 2021
Building plan approvalFile: SECTOR A2 eigth twelve floor plan.pdf8 May 2021
Building plan approvalFile: SECTOR B2 eighth twelve floor plan.pdf8 May 2021
Building plan approvalFile: SECTOR H2 eighth twelve floor plan.pdf8 May 2021
Copy of Layout Approval (in case of layout)File: sec 2 layout copy.pdf8 May 2021
Building Plan Approval / NA Order for plotted developmentFile: SECTOR A2 eigth twelve floor plan.pdf8 May 2021
Building Plan Approval / NA Order for plotted developmentFile: SECTOR B2 eighth twelve floor plan.pdf8 May 2021
Building Plan Approval / NA Order for plotted developmentFile: SECTOR H2 eighth twelve floor plan.pdf8 May 2021
Commencement Certificates / NA Order for plotted developmentFile: CC SEC 2 DT 13052021.pdf8 May 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QAC KINGSBURY PH 3.pdf8 May 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 KB PH III 23022021.pdf5 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QTY ASSURANCE CERT KINGSBURY 09012021.pdf13 Jan 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Rera QA cert kb ph3.pdf13 Oct 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QULITY KINGS BURY PH 3.pdf13 Jul 2020
Layout approvalFile: FRESH LAYOUT.pdf31 Dec 2019
PAN CardFile: PAN.pdf31 Dec 2019
Copy of Layout Approval (in case of layout)File: FRESH LAYOUT.pdf31 Dec 2019
Building plan approvalFile: ODD B1B2.pdf27 Dec 2019
Building plan approvalFile: ODD H1H2.pdf27 Dec 2019
Building plan approvalFile: EVEN B1B2.pdf27 Dec 2019
Building plan approvalFile: EVEN FLOOR H1 H2.pdf27 Dec 2019
Copy of the legal title reportFile: Title Report.pdf27 Dec 2019
Details of encumbrancesFile: DECLARATION KINGSBURY.pdf27 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: ODD B1B2.pdf27 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: ODD H1H2.pdf27 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: EVEN B1B2.pdf27 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: EVEN FLOOR H1 H2.pdf27 Dec 2019
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERT KINGSBURY.pdf27 Dec 2019
Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION KINGSBURY.pdf27 Dec 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf27 Dec 2019
Proforma of Allotment letterFile: kingsbury agreement Phase III.pdf27 Dec 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KINGSBURY PHASE III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHARHOLI13,700+ in Pune

Builder: Jaikul Associates

Jaikul Associates has 5 registrations on MahaRERA, including KINGSBURY PHASE I and NOTTING HILL PHASE I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if KINGSBURY PHASE III is delayed beyond 30 Apr 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KINGSBURY PHASE III?

The registered promoter entity is Jaikul Associates, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KINGSBURY PHASE III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KINGSBURY PHASE III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KINGSBURY PHASE III?

The professionals named in the filing: Architect: AVINASH ANNASAHEB PATIL; Engineer: MILIND BHOITE; Chartered Accountant: BRIJ MANTRI & COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KINGSBURY PHASE III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KINGSBURY PHASE III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KINGSBURY PHASE III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.