Home / Browse projects / Pune, Maharashtra / KINGSBURY PHASE I

Completed No litigation declared Residential / Group Housing project

KINGSBURY PHASE I

By Jaikul Associates

RG-MH-09763 · RERA P52100001994 · Last updated on MahaRERA portal: 13 Feb 2024

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
60 of 66Construction stages doneacross 6 buildings; furthest along: Installation of Lifts, 95%
2Complaints at MahaRERAon this registration
Jump to the 38 documents Report an error

KINGSBURY PHASE I is a Residential / Group Housing project by Jaikul Associates in Pune, Maharashtra, registered with MahaRERA as P52100001994 on 31 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2022. 2 complaints are on record with the regulator.

At a glance

Project

  • NameKINGSBURY PHASE I
  • TypeResidential / Group Housing
  • Location
    • DY PATIL ROAD
    • CHARHOLI
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100001994
  • ReraGenie IDRG-MH-09763

Builder

  • NameJaikul Associates
  • Entity typeOthers
  • Named personsVikas Kulkarni, Sandeep Kulkarni, RISHABH JAIN
  • Other registrations4 more →
  • Completed5 of 5

Key dates

this monthRegisteredJul 2017PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Jul 2017
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings6 building records
  • Documents filed38 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C1NA180000
C2NA180000
D1NA180000
D2NA180000
E1NA180000
E2NA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 13 Feb 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

60 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Installation of Lifts, at 95%.

C190%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises88%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
C290%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises88%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
D1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D2100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
E1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
E2100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 13 Feb 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes60%
Street LightingYes60%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes80%
BASEMENTYes2%

Parking filed436

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots436
Closed/Covered418
Open Space18
BuildingClosed/CoveredOpen SpaceTotal
C170373
C271374
D163366
D273376
E170373
E271374

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,483 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI52358.94
Proposed, not sanctioned50,959 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMODEL COLONY SHIVAJI NAGAR PUNE 411016

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAVINASH ANNASAHEB PATIL
EngineerSTURDCOM CONSULTANTS PVT LTD
PartnerRole in project
Jaikul Associates-

Litigation declared4

CaseCourtStatus
29/2009CIVIL JUDGE JUNIOR DIVISIONAT EVIDENCE STAGE
127/2017DISTRICT COURT PUNEAPPEAL REJECTED
862/2016DISTRICT COURT PUNEAPPEAL REJECTED
225/2009MUMBAI HIGH COURTADMITTED BUT NO PREVENTIVE ORDER IN THE SECOND APPEAL

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC005000000064700Ravindra Kumar VermaJAIKUL Associates20/10/2020
CC005000000064758Ghanshyam RaiJaikul Associates26/03/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed38

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: KINGSBURY.pdf13 Feb 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: KB C Building Society.pdf21 Jun 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: KB D Building Society.pdf21 Jun 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: KB E Building Society.pdf21 Jun 2021
Certificates of Architect (Form 4)File: KINGSBUTY ARCH CERT WITH COMPLETION.pdf12 Jun 2019
Form 2AFile: QUALITY ASSURANCE CERT KINGSBURY CDE BLDG 03042019.pdf10 Apr 2019
Form 2AFile: KINGSBURY QULITY.pdf19 Jan 2019
Proforma of Allotment letterFile: AGREEMENT LOI KB.pdf19 Jan 2019
Certificates of CA (Form 5)File: Audit Report.pdf30 Sep 2018
Certificates of CA (Form 3)File: CA CERTIFICATE KB JAN 2018.pdf4 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate KB UPDATED.pdf3 Nov 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate KB UPDATED.pdf3 Nov 2017
Certificates of CA (Form 3)File: CA Certificate KB UPDATED.pdf3 Nov 2017
Proforma of Allotment letterFile: kingsbury agreement draft.pdf3 Oct 2017
Proforma of Allotment letterFile: Booking Application kingsbury 18-08-2017.pdf3 Oct 2017
Building plan approvalFile: KINGSBURY E EVEN FLOOR.pdf26 Jul 2017
Building plan approvalFile: KINGSBURY D ODD FLOOR.pdf26 Jul 2017
Building plan approvalFile: KINGSBURY D EVEN FLOOR.pdf26 Jul 2017
Layout approvalFile: KINGSBURY LAYOUT.pdf26 Jul 2017
Building plan approvalFile: KINGSBURY E ODD FLOOR.pdf26 Jul 2017
Building plan approvalFile: KINGSBURY ODD FLOOR.pdf26 Jul 2017
Building plan approvalFile: KINGSBURY EVEN FLOOR.pdf26 Jul 2017
Copy of Layout Approval (in case of layout)File: KINGSBURY LAYOUT.pdf26 Jul 2017
Building Plan Approval (IOD)File: KINGSBURY D EVEN FLOOR.pdf26 Jul 2017
Building Plan Approval (IOD)File: KINGSBURY D ODD FLOOR.pdf26 Jul 2017
Building Plan Approval (IOD)File: KINGSBURY E EVEN FLOOR.pdf26 Jul 2017
Building Plan Approval (IOD)File: KINGSBURY E ODD FLOOR.pdf26 Jul 2017
Building Plan Approval (IOD)File: KINGSBURY EVEN FLOOR.pdf26 Jul 2017
Building Plan Approval (IOD)File: KINGSBURY ODD FLOOR.pdf26 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: JAIKUL CC.pdf26 Jul 2017
Copy of the legal title reportFile: JAIKUL TITLE 2017.pdf20 Jul 2017
Details of encumbrancesFile: KINGSBUTY DECLARATION.pdf20 Jul 2017
Declaration in FORM BFile: KINGSBUTY AFFIDAVIT.pdf20 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: KINGSBURY ARCI CERTIFICATE.pdf20 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: KINGSBURY ENGG CERTIFICATE.pdf20 Jul 2017
Certificates of CA (Form 3)File: KINGSBURY CA CERTIFICATE.pdf20 Jul 2017
Proforma of Allotment letterFile: KINGSBURY AGREEMENT OF SALE.pdf20 Jul 2017
PAN CardFile: Jaikul Associates.pdf17 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KINGSBURY PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHARHOLI13,700+ in Pune

2 kmKINGSBURY PHASE ICompleted 29Lapsed / revoked 6Other 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 49 registered projects within 2 km.

Builder: Jaikul Associates

Jaikul Associates has 5 registrations on MahaRERA, including KINGSBURY PHASE I and NOTTING HILL PHASE I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if KINGSBURY PHASE I is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KINGSBURY PHASE I?

The registered promoter entity is Jaikul Associates, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KINGSBURY PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against KINGSBURY PHASE I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for KINGSBURY PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KINGSBURY PHASE I?

The professionals named in the filing: Architect: AVINASH ANNASAHEB PATIL; Engineer: STURDCOM CONSULTANTS PVT LTD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KINGSBURY PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KINGSBURY PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KINGSBURY PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.