Home / Browse projects / Pune, Maharashtra / KESAR TREETOWN PHASE 2
KESAR TREETOWN PHASE 2
RG-MH-04937 · RERA P52100021258 · Last updated on MahaRERA portal: 20 Dec 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 34 months past the filed date
- 5 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KESAR TREETOWN PHASE 2 is a Others project by KESAR VIGHNAHARTA GROUP in Pune, Maharashtra, registered with MahaRERA as P52100021258 on 14 Jun 2019. Possession was promised by 30 Dec 2023 and is now 34 months past that date. 5 complaints are on record with the regulator.
At a glance
Project
- NameKESAR TREETOWN PHASE 2
- TypeOthers
- Location
- GAT NO 39
- 40 DEHU ALANDI BRTS ROAD
- MOSHI CHOCK
- SHIVAJI WADI
- MOSHI
- Moshi
- Haveli
- Pune
- 412105
- Pincode412105
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100021258
- ReraGenie IDRG-MH-04937
Builder
- NameKESAR VIGHNAHARTA GROUP
- Entity typePartnership
- PartnersDILIP MANILAL PATEL, CHETAN SHANTILAL PATEL, DILIP HIRALAL PATEL, RAMANLAL SHANTILAL PATEL, PRAVINBHAI SHAMJIBHAI PATEL, MUKESHKUMAR MAVJI BHAI PATEL, RASIKLAL SOMJIBHAI POKAR, VINODKUMAR MANIBHAI PATEL, NITINKUMAR NARSIBHAI PATEL, MAULIKKUMAR GANGARAMBHAI PATEL
- Other registrations2 more →
- Completed1 of 3
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on14 Jun 2019
- Promised completion30 Dec 2023
- Revised completionNone
- Buildings2 building records
- Documents filed48 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| KESAR TREETOWN A2 | NA | 16 | 0 | 0 | 0 | 0 |
| KESARTREETOWN B2 | NA | 16 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 20 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
22 of 22 construction stages are filed complete across 2 buildings.
KESAR TREETOWN A2100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
KESARTREETOWN B2100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 20 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed283
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| KESAR TREETOWN A2 | 130 | 13 | 143 |
| KESARTREETOWN B2 | 130 | 10 | 140 |
Land and ownership6
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| VASHUDEV BALVANT JADHAV | Pimpri Chinchawad (M Corp.) | Pune |
| MADHUKAR BALVANT JADHAV | Pimpri Chinchawad (M Corp.) | Pune |
| VIJAYKUMAR BALVANT JADHAV | Pimpri Chinchawad (M Corp.) | Pune |
| BHAGVANTA MALHARI GAVARE | Pimpri Chinchawad (M Corp.) | Pune |
| TUKARAM SAHADU SASTE | Pimpri Chinchawad (M Corp.) | Pune |
| GANESH SAHEBRAO SASTE | Pimpri Chinchawad (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ANURADHA GOVERDHAN |
| Engineer | hemant nimbakar |
| Chartered Accountant | SWATI SUDHENDU PATEL |
| Chartered Accountant | SUDHIRKUMAR MANIBHAI PATEL |
| Partner | Role in project |
|---|---|
| KESAR VIGHNAHARTA GROUP | - |
Complaints filed with MahaRERA5
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000259217 | ARATI MAHESH DHOBALE | M/S. KESAR VIGHNAHARTA GROUP | 27/07/2023 |
| CC005000000310456 | Pradip Balu Chaudhari | KESAR VIGHNAHARTA GROUP | 20/02/2024 |
| CC005000000370952 | AAKANKSHA MAYUR gupta | KESAR VIGHNHARTA GROUP | 20/05/2024 |
| CC005000000471150 | Sagar Prabhu Giri | KESAR VIGHNAHARTA GROUP | 20/06/2024 |
| CC12501040 | Sonali daulat sonawane | KESAR VIGHNAHARTA GROUP | 27/03/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 May 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Apr 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 May 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Apr 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 14 Aug 2023
Documents filed48
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Kesar Treetown.pdf | 20 Dec 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Kesar Treetown.pdf | 24 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: KESAR VIGHNHARTA GROUP-21258.pdf | 1 Dec 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A2-PCMC oc_COMPLITION Page-1.pdf | 14 Aug 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: B2.pdf | 14 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: kvg2122.pdf | 22 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 21 KESAR VIGHNAHARTA GROUP Kesar Treetown Phase 2.pdf | 17 Mar 2022 |
| Layout approvalFile: LAYOUT.pdf | 13 Apr 2021 |
| Layout approvalFile: IMG_0001A.pdf | 13 Apr 2021 |
| Layout approvalFile: IMG_0013.pdf | 13 Apr 2021 |
| Layout approvalFile: IMG_0013A.pdf | 13 Apr 2021 |
| Layout approvalFile: IMG_0014.pdf | 13 Apr 2021 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 13 Apr 2021 |
| Copy of Layout Approval (in case of layout)File: IMG_0001A.pdf | 13 Apr 2021 |
| Copy of Layout Approval (in case of layout)File: IMG_0013.pdf | 13 Apr 2021 |
| Copy of Layout Approval (in case of layout)File: IMG_0013A.pdf | 13 Apr 2021 |
| Copy of Layout Approval (in case of layout)File: IMG_0014.pdf | 13 Apr 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: certificate of commencement.pdf | 13 Apr 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Pune_Kesar Vighanharta Group_compressed.pdf | 30 Mar 2021 |
| Proforma of Allotment letterFile: Fresh Final RERA KESAR.pdf | 18 Aug 2019 |
| Declaration in FORM BFile: FORM B_compressed.pdf | 11 Jun 2019 |
| Certificates of CA (Form 3)File: FORM-3.pdf | 11 Jun 2019 |
| Certificates of CA (Form 3)File: FORM-3.pdf | 11 Jun 2019 |
| Proforma of Allotment letterFile: Fresh Final RERA KESAR1.pdf | 11 Jun 2019 |
| Layout approvalFile: IMG_308 LAYOUT_compressed (1).pdf | 17 May 2019 |
| Building plan approvalFile: I O D.pdf | 17 May 2019 |
| Layout approvalFile: IMG_289 B2 type.pdf | 17 May 2019 |
| Layout approvalFile: IMG_290 B2 type_compressed.pdf | 17 May 2019 |
| Layout approvalFile: IMG_291 B2 type_compressed.pdf | 17 May 2019 |
| Layout approvalFile: IMG_295 A2 type.pdf | 17 May 2019 |
| Layout approvalFile: IMG_297 A2 type_compressed.pdf | 17 May 2019 |
| Layout approvalFile: IMG_298 A2 type_compressed.pdf | 17 May 2019 |
| Layout approvalFile: IMG_299 A2 type_compressed.pdf | 17 May 2019 |
| Layout approvalFile: IMG_300 A2 type_compressed.pdf | 17 May 2019 |
| PAN CardFile: pan card kvg.pdf | 17 May 2019 |
| Copy of the legal title reportFile: ilovepdf_merged_compressed.pdf | 17 May 2019 |
| Details of encumbrancesFile: Encumbrance1.pdf | 17 May 2019 |
| Copy of Layout Approval (in case of layout)File: IMG_308 LAYOUT_compressed (1).pdf | 17 May 2019 |
| Copy of Layout Approval (in case of layout)File: IMG_289 B2 type.pdf | 17 May 2019 |
| Copy of Layout Approval (in case of layout)File: IMG_290 B2 type_compressed.pdf | 17 May 2019 |
| Copy of Layout Approval (in case of layout)File: IMG_291 B2 type_compressed.pdf | 17 May 2019 |
| Copy of Layout Approval (in case of layout)File: IMG_295 A2 type.pdf | 17 May 2019 |
| Copy of Layout Approval (in case of layout)File: IMG_297 A2 type_compressed.pdf | 17 May 2019 |
| Copy of Layout Approval (in case of layout)File: IMG_298 A2 type_compressed.pdf | 17 May 2019 |
| Copy of Layout Approval (in case of layout)File: IMG_299 A2 type_compressed.pdf | 17 May 2019 |
| Copy of Layout Approval (in case of layout)File: IMG_300 A2 type_compressed.pdf | 17 May 2019 |
| Building Plan Approval (IOD)File: I O D.pdf | 17 May 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: commice ment certi_compressed.pdf | 17 May 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 48 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep KESAR TREETOWN PHASE 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SHIVAJI WADI, MOSHI13,700+ in Pune
Filed coordinates, straight-line distance. 185 registered projects within 2 km.
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: KESAR VIGHNAHARTA GROUP
KESAR VIGHNAHARTA GROUP has 3 registrations on MahaRERA, including KESAR TREE TOWN and KESAR TREETOWN PHASE 2. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that KESAR TREETOWN PHASE 2 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if KESAR TREETOWN PHASE 2 is delayed beyond 30 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KESAR TREETOWN PHASE 2?
The registered promoter entity is KESAR VIGHNAHARTA GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KESAR TREETOWN PHASE 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against KESAR TREETOWN PHASE 2?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for KESAR TREETOWN PHASE 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KESAR TREETOWN PHASE 2?
The professionals named in the filing: Architect: ANURADHA GOVERDHAN; Engineer: hemant nimbakar; Chartered Accountant: SWATI SUDHENDU PATEL; Chartered Accountant: SUDHIRKUMAR MANIBHAI PATEL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KESAR TREETOWN PHASE 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback