Red flags

  • 54 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
0 of 440Construction stages doneacross 40 buildings; furthest along: Excavation, 0%
54Complaints at MahaRERAon this registration
Jump to the 19 documents Report an error

KARRM BRAHMAAND AFFORDABLE HOMES PVT LTD is a Residential / Group Housing project by KARRM BRAHMAAND AFFORDABLE HOMES PRIVATE LIMITED in Palghar, Maharashtra, registered with MahaRERA as P99000011896 on 31 Aug 2017. Possession is promised by 30 Dec 2026. 54 complaints are on record with the regulator.

At a glance

Project

  • NameKARRM BRAHMAAND AFFORDABLE HOMES PVT LTD
  • TypeResidential / Group Housing
  • Location
    • Kelwa Road
    • Palghar
    • 401401
  • Pincode401401
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000011896
  • ReraGenie IDRG-MH-40658

Builder

  • NameKARRM BRAHMAAND AFFORDABLE HOMES PRIVATE LIMITED
  • Entity typeCompany
  • DirectorSiddhesh Rane

Key dates

this monthRegisteredAug 2017PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Aug 2017
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings40 building records
  • Documents filed19 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
H1NA70000
A4NA80000
A5NA80000
A6NA80000
A7NA80000
C2NA80000
C3NA80000
C4NA80000
E3NA80000
E4NA80000
E8NA80000
D1NA80000
F3NA80000
F4NA80000
F5NA80000
F6NA80000
F7NA80000
F8NA80000
A1NA80000
A2NA80000
A3NA80000
A8NA80000
A9NA80000
B1NA80000
B2NA80000
B3NA80000
B4NA80000
C1NA80000
C5NA80000
C6NA80000
E1NA80000
E2NA80000
E5NA80000
E6NA80000
E7NA80000
F1NA80000
F2NA80000
D2NA80000
G1NA80000
G2NA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 31 Oct 2017, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 40 buildings; the table lists the first 20.

0 of 440 construction stages are filed complete across 40 buildings. The stage furthest along is Excavation, at 0%.

H10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A40%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A50%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A60%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A70%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C30%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C40%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E30%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E40%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E80%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
F30%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
F40%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
F50%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
F60%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
F70%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
F80%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 31 Oct 2017, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area105,332 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI116114.62
Buildings approved40
Buildings sanctioned40

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVARTAK NAGAR, THANE

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMIHIR KOTAK
EngineerBHAVIN C SHAH
PartnerRole in project
KARRM BRAHMAAND AFFORDABLE HOMES PRIVATE LIMITED-

Complaints filed with MahaRERA54

Case no.ComplainantRespondentFiled
CC006000000198451SANDESH NAIKKARRM BRAHMAAND AFFORDABLE HOMES PVT LTD29/09/2021
CC006000000078328Rajendra Ramchandra GuptaKarrm Brahmand Affordable Homes Pvt Ltd03/03/2019
CC006000000193032Jerry ButhelloKarrm Brahmand Affordable Homes Pvt Ltd18/03/2020
CC006000000090042Sanju Shiv Kumar SinghKARRM BRAHMAANDH18/07/2019
CC006000000100312ABDUL SAMEER SHAIKHKARRM BRAHMAAND AFFORDABLE HOUSING30/07/2019
CC006000000110891Sunita YadavRamakant Subhash Jadhav12/09/2019
CC006000000161233NALINI SATISH VISAPUREKARRM BRAHMAAND AFFORDABLE HOUSES PVT. LTD.05/11/2022
CC006000000161315Rajendraprasad Johar NishadKarrm Brahmaand Affordable Homes Pvt. Ltd.22/10/2019
CC006000000161351Ramesh JireM/s Karrm Brahmaand Affordable Homes Pvt Ltd25/10/2019
CC006000000171457VANDANA ZUMBAR ATOLEKARRM BRAHMAAND AFFORDABLE HOMES PVT LTD PROPRIETOR NISHIKANT NAIK SATAM08/11/2019
CC006000000171581Omprakash VishwakarmaKarmm Brahmaand Affordable Homes Pvt Ltd03/03/2020
CC006000000182102Monthu LoboKarrm Brahmaand Affordable Homes Pvt. Ltd.08/01/2020
CC006000000192150Betavina Benedict FernandesKarrm Brahmaand Affordable Home Private Limited23/01/2020
CC006000000192732DESMOND DEMELODESMOND DEMELO24/02/2020
CC006000000193271Ganesh PalkarKarrm Brahmaand Affordable Homes Pvt Ltd08/06/2020
CC006000000193714Nirmala Radheshyam GuptaKARRM BRAHMAAND AFFORDABLE HOMES PVT LTD13/08/2020
CC006000000194434Rashmee Raghunath MalkarRAMAKANT JADAV11/10/2021
CC006000000195297Ashok Zujya Koli and Kalpesh Ashok KoliKarrm Brahmaand Affordable Homes Pvt Ltd18/12/2020
CC006000000195578Shirin KuraishiNamdev Jadhav06/01/2022
CC006000000196170PRAVIN ASHOK AKOLKARKARRM BRAHMAAND AFFORDABLE HOMES PVT. LTD.26/02/2021
CC006000000196173RAMESHWARI PRAVIN AKOLKARKARRM BRAHMAAND AFFORDABLE HOMES PVT. LTD.26/02/2021
CC006000000210106KAMALA VENKATESHKARRM BRAHMAAND20/02/2022
CC006000000210112KAMALA VENKATESHKARRM BRAHMAAND20/02/2022
CC006000000196655Alpana PatelAlpana Patel06/04/2021
CC006000000198033SUNITA MADANLAL GUPTAKARRM BRAHMAAND AFFORDABLE HOMES PVT. LTD.21/08/2021
CC006000000198035VAISHALI VIVEK PALYEKARKARRM BRAHMAAND AFFORDABLE HOMES PVT. LTD.22/09/2021
CC006000000197596Archana Ramakant PatankarKARRM BRAHMAAND AFFORDABLE HOMES PVT. LTD.21/07/2021
CC006000000197601SHARONA JERMIAH PHANSAPURKARKARRM BRAHMAAND AFFORDABLE HOMES PVT. LTD.28/09/2021
CC006000000197723DEVENDRA AMARNATH MISHRAKARRM BRAHMAAND AFFORDABLE HOMES PVT. LTD.24/08/2021
CC006000000197821Yuvraj Dattaram BhegdeKARRM BRAHMAAND AFFORDABLE HOMES PVT. LTD.05/08/2021
CC006000000197979SABANA SAUKAT ALIKARRM BRAHMAAND AFFORDABLE HOMES PVT. LTD.14/08/2021
CC006000000198041SAVIO MONISH SHAHKARRM BRAHMAAND AFFORDABLE HOMES PVT. LTD.23/08/2021
CC006000000198175SHAILA BHUPINDER SINGHKARRM BRAHMAAND AFFORDABLE HOMES PVT. LTD.02/09/2021
CC006000000198516RAJSHREEMR.RAMAKANT SUBHASH JADHAV AND MR. NAMDEOB SUBHASH JADHAV30/09/2021
CC006000000198420SUNIL JADHAVKARRM BRAHMAAND AFFORDABLE HOMES PVT. LTD.11/10/2021
CC006000000209352Sandhya Satish PolKARRM BRAHMMAND AFFORDABLE07/01/2022
CC006000000209637SABINA MELWYN BANJIKARRM BRAHMAAND AFFORDABLE HOMES PVT. LTD.07/01/2022
CC006000000209638SATHISH G POLKARRM BRAHMAAND AFFORDABLE HOMES PVT. LTD.07/01/2022
CC006000000209636SAUMYASHREE RANJIT ACHARYAKARRM BRAHMAAND AFFORDABLE HOMES PVT. LTD.09/01/2022
CC006000000209648Prachi parabKARM BRAMHAND AFFORDAB HOMES PRIVATE LIMITEDLE18/01/2022
CC006000000210176NANDINI GANGADHAR POLKARRM BRAHMAAND AFFORDABLE HOMES PVT. LTD.03/03/2022
CC006000000210175SUVARNALATA GANGARAM POLKARRM BRAHMAAND AFFORDABLE HOMES PVT. LTD.03/03/2022
CC006000000210177RANJANA MUKUND TRYAMBAKEKARRM BRAHMAAND AFFORDABLE HOMES PVT. LTD.03/03/2022
CC006000000210115MANISHA SITARAM KARANDEKARRM BRAHMAAND20/02/2022
CC006000000210116VENKATESH KUMAR KRISHNAMURTHY TIRUPATIPANYAMKARRM BRAHMAAND20/02/2022
CC006000000292368VINODKUMAR PALJI KOLIMrs Manda Kadam24/08/2022
CC006000000344230yahya shaikh zakariaKarrm Brahmaand Affordable Homes private limited05/02/2023
CC006000000375007Gajendra Prasad SinghKarrm Brahmaand Affordable Homes Pvt. Ltd.29/03/2023
CC12500853Chandan Yashwant DalviKARRM BRAHMAAND AFFORDABLE HOMES PRIVATE LIMITED12/03/2025
CC12501213RAJKUMAR RAMESH THAKURKARRM BRAHMAAND AFFORDABLE HOMES PRIVATE LIMITED11/04/2025
CC12501212NILESH RAMESH CHAVANKARRM BRAHMAAND AFFORDABLE HOMES PRIVATE LIMITED11/04/2025
CC12503047Asif UsmaniKARRM BRAHMAAND AFFORDABLE HOMES PRIVATE LIMITED30/08/2025
CC12503528Rakesh ramnath pandeyKARRM BRAHMAAND AFFORDABLE HOMES PRIVATE LIMITED03/10/2025
CC12600644RAHUL VASANT BORKARKARRM BRAHMAAND AFFORDABLE HOMES PRIVATE LIMITED04/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Oct 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Oct 2017
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed19

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: KB - REVISED Layout Plan.pdf31 Oct 2017
Building plan approvalFile: KB - REVISED IOD.pdf31 Oct 2017
Copy of Layout Approval (in case of layout)File: KB - REVISED Layout Plan.pdf31 Oct 2017
Building Plan Approval (IOD)File: KB - REVISED IOD.pdf31 Oct 2017
Building plan approvalFile: IOD.pdf31 Jul 2017
Layout approvalFile: LAYOUT APPROVAL.pdf31 Jul 2017
PAN CardFile: KB PAN card.pdf31 Jul 2017
Copy of the legal title reportFile: Legal title Report KB.pdf31 Jul 2017
Details of encumbrancesFile: Details of Encumbrances KB.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT APPROVAL.pdf31 Jul 2017
Building Plan Approval (IOD)File: IOD.pdf31 Jul 2017
Declaration in FORM BFile: declaration KB.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf31 Jul 2017
Certificates of CA (Form 3)File: KB-1.pdf31 Jul 2017
Certificates of CA (Form 3)File: KB-2.pdf31 Jul 2017
Certificates of CA (Form 3)File: KB-3.pdf31 Jul 2017
Certificates of CA (Form 3)File: KB-4.pdf31 Jul 2017
Proforma of Allotment letterFile: AFS AND Allotment KB.pdf31 Jul 2017

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KARRM BRAHMAAND AFFORDABLE HOMES PVT LTD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kelwa Road3,200+ in Palghar

2 kmKARRM BRAHMAAND AFFORDABCompleted 1Lapsed / revoked 5Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 8 registered projects within 2 km.

Builder: KARRM BRAHMAAND AFFORDABLE HOMES PRIVATE LIMITED

KARRM BRAHMAAND AFFORDABLE HOMES PRIVATE LIMITED has 1 registration on MahaRERA, including KARRM BRAHMAAND AFFORDABLE HOMES PVT LTD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if KARRM BRAHMAAND AFFORDABLE HOMES PVT LTD is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KARRM BRAHMAAND AFFORDABLE HOMES PVT LTD?

The registered promoter entity is KARRM BRAHMAAND AFFORDABLE HOMES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KARRM BRAHMAAND AFFORDABLE HOMES PVT LTD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against KARRM BRAHMAAND AFFORDABLE HOMES PVT LTD?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for KARRM BRAHMAAND AFFORDABLE HOMES PVT LTD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KARRM BRAHMAAND AFFORDABLE HOMES PVT LTD?

The professionals named in the filing: Architect: MIHIR KOTAK; Engineer: BHAVIN C SHAH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KARRM BRAHMAAND AFFORDABLE HOMES PVT LTD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KARRM BRAHMAAND AFFORDABLE HOMES PVT LTD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KARRM BRAHMAAND AFFORDABLE HOMES PVT LTD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.