Karamchand Greens

By Neerja Realtors Private Limited

RG-MH-45303 · RERA P50500055231 · Last updated on MahaRERA portal: 29 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2029Possession promisedno revision filed
282 of 322Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 106 documents Report an error

Karamchand Greens is a Plotted project by Neerja Realtors Private Limited in Nagpur, Maharashtra, registered with MahaRERA as P50500055231 on 11 Mar 2024. Possession is promised by 31 Mar 2029. 40 of the 322 units on this registration are recorded sold or booked.

At a glance

Project

  • NameKaramchand Greens
  • TypePlotted
  • Location
    • Hingna Road
    • Sondapar
    • Hingna
    • Nagpur
    • 441110
  • Pincode441110
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500055231
  • ReraGenie IDRG-MH-45303

Builder

  • NameNeerja Realtors Private Limited
  • Entity typeCompany
  • CINU45200MH2005PTC151359
  • DirectorsNaveen Madanlal Arya, Bimal Madanlal Arya, Abhishek Anil Arya, Sanjay Nag Narayan Prasad Shrivastava, Vivek Jai Shiv Nath Chaturvedi

Key dates

this monthRegisteredMar 2024PromisedMar 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Mar 2024
  • Promised completion31 Mar 2029
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed106 files

Current status

12%40 of 322 units booked

Figures as on 29 Jun 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes99%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes98%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area50,580 sq m
Land owned byThe promoter
Named landownersNone
Declared on30 May 2025

Approvals and building plan

Sanctioning authorityTehsildar, Hingna

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHouse No 15403, Ward No 1, plot No 4, Taj Talkies, Wanadongri -441110

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrashant Satpute
EngineerPrakash Dhawade
Chartered AccountantCA Abhinav Welekar
Chartered AccountantS R J N & CO LLP
Chartered AccountantAPJ & Associates
PartnerRole in project
Neerja Realtors Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2029

Documents filed106

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 106 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf29 Jun 2026
Withdrawal Update Form 2File: FORM 2.pdf29 Jun 2026
Withdrawal Update Form 3File: FORM 3 CA Cer.pdf29 Jun 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECTS CERTIFICATE.pdf4 Feb 2026
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf4 Feb 2026
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE SEP-2025 .pdf4 Feb 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf4 Sep 2025
Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE JUNE 2025 KG.pdf4 Sep 2025
Withdrawal Update Form 3File: Form 3 CA Certificate Qtr1.pdf4 Sep 2025
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf29 Jul 2025
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf29 Jul 2025
Withdrawal Update Form 2File: FORM 2.pdf29 Jul 2025
Withdrawal Update Form 2File: FORM 2.pdf29 Jul 2025
Withdrawal Update Form 3File: KARAMCHAND GREENS FORM 3 CA CERTIFICATE.pdf29 Jul 2025
Withdrawal Update Form 3File: KARAMCHAND GREENS FORM 3 CA CERTIFICATE.pdf29 Jul 2025
Form 2A (FY 2023-2024)File: Form 2A.pdf29 Jul 2025
Form 2A (FY 2024-2025)File: KARAMCHAND GREENS FORM 2A ENGINNER CERTIFICATE 25.pdf29 Jul 2025
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf28 Jul 2025
Withdrawal Update Form 2File: FORM 2.pdf28 Jul 2025
Withdrawal Update Form 3File: KARAMCHAND GREENS FORM 3 CA CERTIFICATE.pdf28 Jul 2025
Form 1File: Form-1.pdf18 Jul 2025
Form 2File: Form-2.pdf18 Jul 2025
Form 3File: Form-3.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Annexure -29 DISCLOSURE OF SOLD BOOKED INVENTORY 31 MARCH 2025.pdf18 Jul 2025
Form 5 (FY 2024-2025)File: 2_Form 5 signed 31-03-2025.pdf11 Jul 2025
Form 3File: KARAMCHAND GREENS FORM 3 CA CERTIFICATE.pdf30 May 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf30 May 2025
Form 2File: FORM 2.pdf30 May 2025
Form 3File: form 3 30-06-2024.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: KARAMCHAND GREENS SOLD-UNSOLD INVENTORY 30 JUNE 2024.pdf30 May 2025
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf30 May 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE SEP 30 2024.pdf30 May 2025
Form 3File: form 3 30-09-2024.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: KARAMCHAND GREENS SOLD & UNSOLD INVENTORY 30 SEP 2024 RERA.pdf30 May 2025
Form 1File: Form 1 - 31-12-2024.pdf30 May 2025
Form 2File: Form-2 31-12-2024.pdf30 May 2025
Form 3File: Form 3 31-012-2024.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: KG-DISCLOSURE OF SOLD-BOOKING INVENTORY-31-12-2025.pdf30 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_Form-3 31-12-2024 Sign.pdf13 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 31-12-2024.pdf13 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 31-12-2024.pdf10 Feb 2025
Disclosure of sold/ booked inventoryFile: KG-DISCLOSURE OF SOLD-BOOKING INVENTORY-31-12-2025.pdf10 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Director - Aryaman Arya.pdf10 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf26 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 30-06-2024.pdf26 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 30-09-2024.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTIFICATE SEP 30 2024.pdf26 Oct 2024
Disclosure of sold/ booked inventoryFile: KARAMCHAND GREENS SOLD-UNSOLD INVENTORY 30 JUNE 2024.pdf26 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: signed FORM 5.pdf26 Oct 2024
Form 5 (FY 2023-2024)File: Form5.pdf26 Sep 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE.pdf8 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEERS CERTIFICATE 31 MARCH 2024.pdf8 Jul 2024
Disclosure of sold/ booked inventoryFile: KARAMCHAND GREENS SOLD-UNSOLD INVENTORY 30 JUNE 2024.pdf8 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: KARAMCHAND GREENS FORM 3 CA CERTIFICATE.pdf8 Jul 2024
Proforma of Agreement for saleFile: ATS REPORT KD2 KG MAY 2024.pdf24 May 2024
Deviation Report with respect to model copy of AgreementFile: ATS DEVIATION KG KD2 MAY 2024.pdf24 May 2024
Other - LegalFile: MahaRera Letter Information to Everyone.pdf24 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Annexure 29.pdf20 Apr 2024
Layout approvalFile: NMRDA FINAL APPROVAL DRAWING KARAMCHAND GREENS (1).pdf22 Mar 2024
Building plan approval or NA orderFile: NMRDA FINAL APPROVAL CERTIFCATE KARAMCHAND GREENS.pdf22 Mar 2024
Copy of Layout Approval (in case of layout)File: NMRDA FINAL APPROVAL DRAWING KARAMCHAND GREENS (1).pdf22 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: NMRDA FINAL APPROVAL CERTIFCATE KARAMCHAND GREENS.pdf22 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: NMRDA FINAL APPROVAL CERTIFCATE KARAMCHAND GREENS.pdf22 Mar 2024
Copy of the legal title reportFile: NRPL Kh No 23.pdf1 Mar 2024
Copy of the legal title reportFile: NRPL Kh No 24 ATS.pdf1 Mar 2024
Copy of the legal title reportFile: NRPL Kh No 24.pdf1 Mar 2024
Copy of the legal title reportFile: NRPL Kh No 25.pdf1 Mar 2024
Copy of the legal title reportFile: NRPL Kh No 26-1.pdf1 Mar 2024
Copy of the legal title reportFile: NRPL Kh No 26-2.pdf1 Mar 2024
Proforma of Agreement for saleFile: 9_ATS KARAMCHAND GREENS 24-02-2024.pdf24 Feb 2024
Deviation Report with respect to model copy of AgreementFile: 13_Deviation to ATS 24-02-2024.pdf24 Feb 2024
Other - TechnicalFile: 17_KG ANNEXURE A DECLARATION-CUM-UNDERTAKING.pdf8 Feb 2024
Declaration in FORM BFile: 6_FORM B new.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_FORM 2 KARAMCHAND GREENS.pdf5 Feb 2024
Copy of the legal title reportFile: 4_TITLE SEARCH SONDAPAR_22-01-24_Final.pdf22 Jan 2024
Details of encumbrances concerned to FinanceFile: 5A_KD2 FINANCIAL ENCUMBRANCE CERTIFICATE.pdf22 Jan 2024
Details of encumbrances concerned to FinanceFile: 5B_KD2 LEGAL LITIGATION ENCUMBRANCE CERTIFICATE.pdf22 Jan 2024

How this compares with Nagpur

12%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Karamchand Greens on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sondapar2,800+ in Nagpur

2 kmKaramchand GreensCompleted 29Other 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 46 registered projects within 2 km.

Builder: Neerja Realtors Private Limited

Neerja Realtors Private Limited has 1 registration on MahaRERA, including Karamchand Greens. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Karamchand Greens is delayed beyond 31 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Karamchand Greens?

The registered promoter entity is Neerja Realtors Private Limited, a company as per the filing. Its CIN U45200MH2005PTC151359 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Karamchand Greens?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Karamchand Greens?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Karamchand Greens?

The professionals named in the filing: Architect: Prashant Satpute; Engineer: Prakash Dhawade; Chartered Accountant: CA Abhinav Welekar; Chartered Accountant: S R J N & CO LLP; Chartered Accountant: APJ & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Karamchand Greens?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Karamchand Greens. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Karamchand Greens to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.