Registered No litigation declared Residential / Group Housing project

Kannamwar Nagar Panchsheel CHSL

By Prakritii Realtors LLP

RG-MH-07162 · RERA P51900054601 · Last updated on MahaRERA portal: 29 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 18 months
  • 1 extension taken
  • Rs 21.89 crore secured on the land, in favour of Radhika Sandeep Hisaria

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedmoved 18 months from the original
2 of 11Construction stages donefurthest along: Stilt Floor, 50%
143 of 143Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

Kannamwar Nagar Panchsheel CHSL is a Residential / Group Housing project by Prakritii Realtors LLP in Mumbai City, Maharashtra, registered with MahaRERA as P51900054601 on 31 Jan 2024. Possession is promised by 30 Jun 2028. The completion date has moved by 18 months from the original filing. 0 of the 143 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameKannamwar Nagar Panchsheel CHSL
  • TypeResidential / Group Housing
  • Location
    • Kannamwar Nagar
    • Vikhroli East
    • Mumbai City
    • 400083
  • Pincode400083
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900054601
  • ReraGenie IDRG-MH-07162

Builder

  • NamePrakritii Realtors LLP
  • Entity typePartnership
  • PartnersJyoti Sharad Shetty, Radhika Sandeep Hisaria
  • PartnersSANDEEP SAWARMAL HISARIA, RAMESH CHANDRA JAJU

Key dates

this monthRegisteredJan 2024First promiseDec 2026Revised toJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Jan 2024
  • Promised completion30 Jun 2028
  • Revised completionRevised to 30 Jun 2028 (originally 31 Dec 2026)
  • Buildings1 building record
  • Documents filed97 files

Current status

0%0 of 143 units booked
21.4%Work done, per cost certificate

Figures as on 29 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Kannamwar Nagar Panchsheel CHSLNA24231430143

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 50%.

Kannamwar Nagar Panchsheel CHSL: 25% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth0%
Stilt Floor50%
Slabs of Super Structure5%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises12%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed36

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots36
Closed/Covered36

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area768 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofRadhika Sandeep Hisaria
Secured amountRs 21.89 crore
CERSAI search filedYes
Declared on1 Jun 2026
LandownerVillageDistrict
Kannamwar Nagar Panchsheel CHSLHariyaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMHADA
Permissible FSI6111.15
Proposed, not sanctioned6,111 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch833 UCO BANK BUILDINGS D N ROAD MUMBAI 400023
Estimated costRs 42.00 cr
Cost incurredRs 9.00 cr
Work done21.42%
BuildingWingEstimatedIncurred
Kannamwar Nagar Panchsheel CHSLNARs 42.00 crRs 9.00 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectParth Architectural Consultants
EngineerAssociated Structural Engineers LLP
Chartered AccountantSwapnesh & Vinit Chartered Accountants
Chartered AccountantMAHESH SHAH & CO.
Chartered AccountantADV & ASSOCIATES
PartnerRole in project
Prakritii Realtors LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA02062621203Dec 2026 → Jun 2028

Reason as filed by the promoterThe project timeline was impacted due to the exit of the previous management, induction of new management, and delays in obtaining requisite statutory approvals from the competent authorities. Following the management transition, the necessary funds were infused, all major approvals were secured, and construction activities resumed at full pace. As on date, RCC work up to the 6th floor has been completed, and internal RCC and brickwork activities are in progress.All Quarterly Progress Reports (QPRs) and Annual Progress Reports (APRs) have been duly filed and are up to date. Further, the correc

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Mar 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf29 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf29 Jul 2026
Withdrawal Update Form 3File: Form 3.pdf29 Jul 2026
Withdrawal Update Form 1File: Form 1 Q4.pdf1 Jun 2026
Withdrawal Update Form 2File: Form 2 Q4.pdf1 Jun 2026
Withdrawal Update Form 3File: Form 3Q4.pdf1 Jun 2026
Withdrawal Update Form 1File: Form 1 Q4.pdf30 Apr 2026
Withdrawal Update Form 2File: Form 2 Q4.pdf30 Apr 2026
Withdrawal Update Form 3File: Form 3Q4.pdf30 Apr 2026
Layout approvalFile: LAYOUT.pdf18 Mar 2026
Form 1File: FORM 1 OCT 25 Q2.pdf27 Feb 2026
Form 2File: FORM 2 Q2.pdf27 Feb 2026
Form 3File: Form3 Q2.pdf27 Feb 2026
Disclosure of Sold and Booked InventoryFile: sold unsold Q2.pdf27 Feb 2026
Form 1File: FORM 1 Q3.pdf27 Feb 2026
Form 2File: FORM 2 Q3.pdf27 Feb 2026
Form 3File: FORM 3 Q3.pdf27 Feb 2026
Disclosure of Sold and Booked InventoryFile: sold unsold Q3.pdf27 Feb 2026
Form 1File: 2025 FORM 1 Q1.pdf27 Feb 2026
Form 2File: 25 Q1 Form 2.pdf27 Feb 2026
Form 3File: Form 3 Q1 25.pdf27 Feb 2026
Disclosure of Sold and Booked InventoryFile: 2025 SOLD AND UNSOLD Q1.pdf27 Feb 2026
Form 1File: 2025-05-05 Form1 Liasioning Archit Q4 Cert 31-03-2025.pdf6 Jan 2026
Form 2File: 2025-04-08 Form 2.pdf6 Jan 2026
Form 3File: 2025-05-15 Form 3-CA.pdf6 Jan 2026
Disclosure of Sold and Booked InventoryFile: BLANK.pdf6 Jan 2026
Form 1File: FORM 1 MAR 24.pdf5 Jan 2026
Form 2File: FORM 2 MAR 24.pdf5 Jan 2026
Form 3File: FORM 3 Q4 23.pdf5 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD MAR 24.pdf5 Jan 2026
Form 1File: FORM 1 JUNE24.pdf5 Jan 2026
Form 2File: FORM 2 JUNE24.pdf5 Jan 2026
Form 3File: FORM 3 Q2 24-25.pdf5 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUNE24.pdf5 Jan 2026
Form 1File: FORM 1 SEPT24.pdf5 Jan 2026
Form 2File: FORM 2 SEPT24.pdf5 Jan 2026
Form 3File: FORM 3 Q3 24-25.pdf5 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUNE24.pdf5 Jan 2026
Form 1File: FORM 1 DEC 24.pdf5 Jan 2026
Form 2File: FORM 2 DEC 24.pdf5 Jan 2026
Form 3File: FORM 3 Q3 24-25.pdf5 Jan 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DEC24.pdf5 Jan 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1 SEPTEMBER 2024.pdf24 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1 DECEMBER 2024.pdf24 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 FORM 3 SEPTEMBER 2024.pdf24 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 FORM 3 DECEMBER 2024.pdf24 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2 SEPTEMBER 2024.pdf24 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2 DECEMBER 2024.pdf24 Feb 2025
Disclosure of sold/ booked inventoryFile: 4 SOLD UNSOLD SEPTEMBER 2024.pdf24 Feb 2025
Disclosure of sold/ booked inventoryFile: 4 SOLD UNSOLD DECEMBER 2024.pdf24 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Prakritii Realtors LLP FORM 5 - FY 23-24.pdf24 Feb 2025
Deviation Report with respect to model copy of AgreementFile: DEVIATION.pdf27 Jan 2025
Proforma of Agreement for saleFile: NEW AFS for new sale of bldg no 62.pdf27 Jan 2025
Proforma of Agreement for saleFile: afs.pdf16 Nov 2024
Proforma of Agreement for saleFile: afs.pdf16 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Form 1 - Architect's Certificate.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Form 2 - Engineer's Certificate.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: 4_Disclosure of Sold.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-PANCHSHEEL_MAR 24.pdf7 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-PANCHSHEEL_MAR 24.pdf7 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-PANCHSHEEL_MAR 24.pdf7 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-PANCHSHEEL_MAR 24.pdf7 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-PANCHSHEEL_MAR 24.pdf7 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A-PANCHSHEEL_MAR 24.pdf7 Jun 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD-PANCHSHEEL_MAR 24.pdf7 Jun 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD-PANCHSHEEL_MAR 24.pdf7 Jun 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD-PANCHSHEEL_MAR 24.pdf7 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-PANCHSHEEL_MAR 24.pdf7 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-PANCHSHEEL_MAR 24.pdf7 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-PANCHSHEEL_MAR 24.pdf7 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-KALPATARU_MAR 24.pdf3 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-KALPATARU_MAR 24.pdf3 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A-KALPATARU_MAR 24.pdf3 Jun 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD-KALPATARU_MAR 24.pdf3 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-KALPATARU_MAR 24.pdf3 Jun 2024
Building plan approvalFile: 1 Copy of Layout Approval (in case of layout).pdf25 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 1 Copy of Layout Approval (in case of layout).pdf25 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PANCH.pdf25 Jan 2024
Proforma of Agreement for saleFile: AFS.pdf23 Jan 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION.pdf23 Jan 2024

How this compares with Mumbai City

0%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 18 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kannamwar Nagar Panchsheel CHSL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vikhroli East780+ in Mumbai City

2 kmKannamwar Nagar PanchsheCompleted 16Lapsed / revoked 20Other 66Dot size: filed unitsN

Filed coordinates, straight-line distance. 102 registered projects within 2 km.

Builder: Prakritii Realtors LLP

Prakritii Realtors LLP has 1 registration on MahaRERA, including Kannamwar Nagar Panchsheel CHSL. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Kannamwar Nagar Panchsheel CHSL is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kannamwar Nagar Panchsheel CHSL?

The registered promoter entity is Prakritii Realtors LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kannamwar Nagar Panchsheel CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kannamwar Nagar Panchsheel CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kannamwar Nagar Panchsheel CHSL?

The professionals named in the filing: Architect: Parth Architectural Consultants; Engineer: Associated Structural Engineers LLP; Chartered Accountant: Swapnesh & Vinit Chartered Accountants; Chartered Accountant: MAHESH SHAH & CO.; Chartered Accountant: ADV & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kannamwar Nagar Panchsheel CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kannamwar Nagar Panchsheel CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kannamwar Nagar Panchsheel CHSL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.