Home / Browse projects / Pune, Maharashtra / KAMAL RESIDENCY

Registered No litigation declared Residential / Group Housing project

KAMAL RESIDENCY

By M/S VARAD DEVELOPERS

RG-MH-27433 · RERA P52100033597 · Last updated on MahaRERA portal: 24 Oct 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 27 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 27 months from the original
9 of 11Construction stages donefurthest along: Basement (if any), 0%
0 of 60Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 171 documents Report an error

KAMAL RESIDENCY is a Residential / Group Housing project by M/S VARAD DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100033597 on 2 Mar 2022. Possession is promised by 30 Mar 2027. The completion date has moved by 27 months from the original filing. 60 of the 60 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameKAMAL RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • CHIKHALI
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100033597
  • ReraGenie IDRG-MH-27433

Builder

  • NameM/S VARAD DEVELOPERS
  • Entity typePartnership
  • PartnerGANESH KASHINATH SHINDE

Key dates

this monthRegisteredMar 2022First promiseDec 2024Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Mar 2022
  • Promised completion30 Mar 2027
  • Revised completionRevised to 30 Mar 2027 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed171 files

Current status

100%60 of 60 units booked
100.0%Work done, per cost certificate

Figures as on 24 Oct 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KAMAL RESIDENCYNA7660060

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

KAMAL RESIDENCY: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed40

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots40
Closed/Covered40

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area941 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Nov 2025
LandownerVillageDistrict
MRS JYOTSNA SAMBHAJI KALBHORPimpri Chinchawad (M Corp.)Pune
MRS HEMLATA SANJAY KALBHORPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI3454.33
Proposed, not sanctioned3,454 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAKURDI PUNE
Estimated costRs 6.96 cr
Cost incurredRs 6.96 cr
Work done100.0%
BuildingWingEstimatedIncurred
KAMAL RESIDENCYNARs 6.37 crRs 6.37 cr
-NARs 58.92 lakhRs 58.92 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCP DESIGN STUDIO
EngineerMR SANKALP M PATIL
EngineerRohinee Badgujar
Chartered AccountantANITA L LIMAYE
Chartered AccountantMahesh Malhotra
PartnerRole in project
M/S VARAD DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100025145Dec 2024 → Jun 2025

Reason as filed by the promoterThe delay in the project’s timeline has been primarily due to unforeseen labor shortages and financial constraints. The shortage of skilled and unskilled labor, caused by challenges in recruitment and retention, has significantly slowed down the construction progress. Additionally, financial difficulties, including issues in securing adequate funding, rising material costs, and higher-than-expected interest rates on loans, have further impacted the project timeline. Despite these challenges, we are actively addressing the issues by streamlining operations, recruiting additional workers, and ne

EA06082622041Dec 2024 → Mar 2027

Reason as filed by the promoterWe have received the Completion Certificate; however, it was issued after a delay of nearly four months. This delay significantly impacted our project schedule, as several activities-such as documentation, uploading completion-related details on the MahaRERA portal, and submission of final compliance documents-could only be carried out after receipt of the Completion Certificate. Because the certificated was Received late all these tasks were Automatically pushed beyond their Original Deadlines. To Maintain Proper compliance and to align our submission timeline with the actual date of receipt

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Feb 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Mar 2027

Documents filed171

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 171 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Kamal Residency - Architect Certificate - 1st quarter 2026-27 (1) (1).pdf24 Oct 2026
Withdrawal Update Form 2File: Engineer certificate first quarter 26-27.pdf24 Oct 2026
Withdrawal Update Form 3File: CA Certificate as Updated (1).pdf24 Oct 2026
Form 2A (FY 2026-2027)File: Form 2A.pdf24 Oct 2026
Withdrawal Update Form 1File: Sep 2025 Form 1.pdf21 Oct 2026
Withdrawal Update Form 1File: Dec 2025 Form 1.pdf21 Oct 2026
Withdrawal Update Form 1File: Mar 2026 Form1.pdf21 Oct 2026
Withdrawal Update Form 1File: Mar 2026 Form1.pdf21 Oct 2026
Withdrawal Update Form 2File: Sep 2025 From 2.pdf21 Oct 2026
Withdrawal Update Form 2File: Dec 2025 Form 2.pdf21 Oct 2026
Withdrawal Update Form 2File: Form 2 March 26.pdf21 Oct 2026
Withdrawal Update Form 2File: Engineer certificate first quarter 26-27.pdf21 Oct 2026
Withdrawal Update Form 3File: Kamal Residency Form 3 Sep 2025.pdf21 Oct 2026
Withdrawal Update Form 3File: Form 3 - December 2025.pdf21 Oct 2026
Withdrawal Update Form 3File: Form 3 - March 2026.pdf21 Oct 2026
Withdrawal Update Form 3File: Form 3 first quarter 26-27.pdf21 Oct 2026
Form 5 (FY 2024-2025)File: form 5.pdf7 Aug 2026
Form 5 (FY 2025-2026)File: form 5.pdf7 Aug 2026
Form 2A (FY 2024-2025)File: Site Supervisor_s Certificate - 2024-25 (1).pdf6 Aug 2026
Form 2A (FY 2025-2026)File: Site Supervisor_s Certificate - 2025-26.pdf6 Aug 2026
Withdrawal Update Form 1File: signed F1.pdf6 Apr 2026
Withdrawal Update Form 2File: signed Form 2.pdf6 Apr 2026
Withdrawal Update Form 3File: signed F3.pdf6 Apr 2026
Form 1File: Form 1s.pdf19 Sep 2025
Form 2File: Form 2 s.pdf19 Sep 2025
Form 3File: CA Certificate Jun 2025.pdf19 Sep 2025
Disclosure of Sold and Booked InventoryFile: Rera sold-unsold 30_06_2025.pdf19 Sep 2025
Form 2A (FY 2021-2022)File: Form 2A 2021-22.pdf19 Sep 2025
Form 2A (FY 2022-2023)File: Form 2A 2022-23.pdf19 Sep 2025
Form 2A (FY 2023-2024)File: Form 2A 2023-24.pdf19 Sep 2025
Form 5 (FY 2021-2022)File: Form 5 2021-22.pdf19 Sep 2025
Form 5 (FY 2022-2023)File: Form 5 2022-23.pdf19 Sep 2025
Form 5 (FY 2023-2024)File: Form 5 2022-23.pdf19 Sep 2025
Form 1File: March 2022 Form 1.pdf30 May 2025
Form 2File: March 2022 form 2 kamal Residency (1).pdf30 May 2025
Form 3File: March 2022 Form 3_compressed.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: March 2022 Sold Unsold.pdf30 May 2025
Form 1File: June 2022 Form 1.pdf30 May 2025
Form 2File: june 2022 Form 2.pdf30 May 2025
Form 3File: Jun 2022 Form 3.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: Jun 2022 Sold Unsold.pdf30 May 2025
Form 1File: Sep 2022 Form 1.pdf30 May 2025
Form 2File: Sep 2023 Form 2.pdf30 May 2025
Form 3File: Sep 2022 Form 3.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: Sep 2022 Sold Unsold.pdf30 May 2025
Form 1File: Dec 2022 Form 1.pdf30 May 2025
Form 2File: Dec 2022 Form 2.pdf30 May 2025
Form 3File: Dec 2022 Form 3.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: Dec 2022 Sold Unsold.pdf30 May 2025
Form 1File: March 2023 Form 1.pdf30 May 2025
Form 2File: March 2023 form 2.pdf30 May 2025
Form 3File: March 2023 Form 3.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: March 2023 Sold Unsold.pdf30 May 2025
Form 1File: June 2023 Form 1.pdf30 May 2025
Form 2File: Jun 2023 Form 2.pdf30 May 2025
Form 3File: Jun 2023 Form 3.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: Jun 2023 Sold Unsold.pdf30 May 2025
Form 1File: Sep 2023 Form 1.pdf30 May 2025
Form 2File: Sep 2023 Form 2.pdf30 May 2025
Form 3File: Sep 2023 Form 3.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: Sep 2023 Sold Unsold.pdf30 May 2025
Form 1File: Dec 2023 Form 1.pdf30 May 2025
Form 2File: Dec 2023 Form 2.pdf30 May 2025
Form 3File: Dec 2023 Form 3.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: Dec 2023 Sold Unsold.pdf30 May 2025
Form 1File: March 2024 Form 1.pdf30 May 2025
Form 2File: March 2024 Form 2.pdf30 May 2025
Form 3File: March 2024 Form 3.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: March 2024 Sold Unsold.pdf30 May 2025
Form 1File: jun 2024 Form 1.pdf30 May 2025
Form 2File: Jun 2024 Form 2.pdf30 May 2025
Form 3File: Jun 2024 Form 3.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: Jun 2024 Sold Unsold.pdf30 May 2025
Form 1File: Spe 2024 Form 1.pdf30 May 2025
Form 2File: Sep 2024 Form 2.pdf30 May 2025
Form 3File: Sep 2024 Form 3.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: Sep 2024 Sold Unsold.pdf30 May 2025
Form 1File: Dec 2024 Form 1.pdf30 May 2025
Form 2File: Dec 2024 Form 2.pdf30 May 2025
Form 3File: Dec 2024 Form 3.pdf30 May 2025

How this compares with Pune

100%of this project is bookeddistrict median 29%
28%of Pune projects moved their completion datethis one moved by 27 months
25%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 14,000+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KAMAL RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHIKHALI14,000+ in Pune

2 kmKAMAL RESIDENCYCompleted 109Lapsed / revoked 42Other 76Dot size: filed unitsN

Filed coordinates, straight-line distance. 227 registered projects within 2 km.

Builder: M/S VARAD DEVELOPERS

M/S VARAD DEVELOPERS has 1 registration on MahaRERA, including KAMAL RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if KAMAL RESIDENCY is delayed beyond 30 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KAMAL RESIDENCY?

The registered promoter entity is M/S VARAD DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KAMAL RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for KAMAL RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KAMAL RESIDENCY?

The professionals named in the filing: Architect: CP DESIGN STUDIO; Engineer: MR SANKALP M PATIL; Engineer: Rohinee Badgujar; Chartered Accountant: ANITA L LIMAYE; Chartered Accountant: Mahesh Malhotra. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KAMAL RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KAMAL RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KAMAL RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.