Home / Browse projects / Pune, Maharashtra / KAMAL RESIDENCY
KAMAL RESIDENCY
RG-MH-27433 · RERA P52100033597 · Last updated on MahaRERA portal: 6 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 16 months past the filed date
- Completion date moved by 6 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
KAMAL RESIDENCY is a Residential / Group Housing project by M/S VARAD DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100033597 on 2 Mar 2022. Possession was promised by 30 Jun 2025 and is now 16 months past that date. The completion date has moved by 6 months from the original filing. 44 of the 60 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NameKAMAL RESIDENCY
- TypeResidential / Group Housing
- Location
- CHIKHALI
- Haveli
- Pune
- 412105
- Pincode412105
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100033597
- ReraGenie IDRG-MH-27433
Builder
- NameM/S VARAD DEVELOPERS
- Entity typePartnership
- PartnerGANESH KASHINATH SHINDE
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on2 Mar 2022
- Promised completion30 Jun 2025
- Revised completionRevised to 30 Jun 2025 (originally 31 Dec 2024)
- Buildings1 building record
- Documents filed151 files
Current status
Figures as on 6 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| KAMAL RESIDENCY | NA | 7 | 6 | 60 | 0 | 60 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.
KAMAL RESIDENCY: 85% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
Progress on shared amenities15
As on 6 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed40
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| MRS JYOTSNA SAMBHAJI KALBHOR | Pimpri Chinchawad (M Corp.) | Pune |
| MRS HEMLATA SANJAY KALBHOR | Pimpri Chinchawad (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | CP DESIGN STUDIO |
| Engineer | MR SANKALP M PATIL |
| Engineer | Rohinee Badgujar |
| Chartered Accountant | ANITA L LIMAYE |
| Chartered Accountant | Mahesh Malhotra |
| Partner | Role in project |
|---|---|
| M/S VARAD DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe delay in the project’s timeline has been primarily due to unforeseen labor shortages and financial constraints. The shortage of skilled and unskilled labor, caused by challenges in recruitment and retention, has significantly slowed down the construction progress. Additionally, financial difficulties, including issues in securing adequate funding, rising material costs, and higher-than-expected interest rates on loans, have further impacted the project timeline. Despite these challenges, we are actively addressing the issues by streamlining operations, recruiting additional workers, and ne
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Feb 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Feb 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Feb 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed151
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 151 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: signed F1.pdf | 6 Apr 2026 |
| Withdrawal Update Form 2File: signed Form 2.pdf | 6 Apr 2026 |
| Withdrawal Update Form 3File: signed F3.pdf | 6 Apr 2026 |
| Form 1File: Form 1s.pdf | 19 Sep 2025 |
| Form 2File: Form 2 s.pdf | 19 Sep 2025 |
| Form 3File: CA Certificate Jun 2025.pdf | 19 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Rera sold-unsold 30_06_2025.pdf | 19 Sep 2025 |
| Form 2A (FY 2021-2022)File: Form 2A 2021-22.pdf | 19 Sep 2025 |
| Form 2A (FY 2022-2023)File: Form 2A 2022-23.pdf | 19 Sep 2025 |
| Form 2A (FY 2023-2024)File: Form 2A 2023-24.pdf | 19 Sep 2025 |
| Form 5 (FY 2021-2022)File: Form 5 2021-22.pdf | 19 Sep 2025 |
| Form 5 (FY 2023-2024)File: Form 5 2022-23.pdf | 19 Sep 2025 |
| Form 5 (FY 2022-2023)File: Form 5 2022-23.pdf | 19 Sep 2025 |
| Form 1File: March 2022 Form 1.pdf | 30 May 2025 |
| Form 2File: March 2022 form 2 kamal Residency (1).pdf | 30 May 2025 |
| Form 3File: March 2022 Form 3_compressed.pdf | 30 May 2025 |
| Disclosure of Sold and Booked InventoryFile: March 2022 Sold Unsold.pdf | 30 May 2025 |
| Form 1File: June 2022 Form 1.pdf | 30 May 2025 |
| Form 2File: june 2022 Form 2.pdf | 30 May 2025 |
| Form 3File: Jun 2022 Form 3.pdf | 30 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Jun 2022 Sold Unsold.pdf | 30 May 2025 |
| Form 1File: Sep 2022 Form 1.pdf | 30 May 2025 |
| Form 2File: Sep 2023 Form 2.pdf | 30 May 2025 |
| Form 3File: Sep 2022 Form 3.pdf | 30 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Sep 2022 Sold Unsold.pdf | 30 May 2025 |
| Form 1File: Dec 2022 Form 1.pdf | 30 May 2025 |
| Form 2File: Dec 2022 Form 2.pdf | 30 May 2025 |
| Form 3File: Dec 2022 Form 3.pdf | 30 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Dec 2022 Sold Unsold.pdf | 30 May 2025 |
| Form 1File: March 2023 Form 1.pdf | 30 May 2025 |
| Form 2File: March 2023 form 2.pdf | 30 May 2025 |
| Form 3File: March 2023 Form 3.pdf | 30 May 2025 |
| Disclosure of Sold and Booked InventoryFile: March 2023 Sold Unsold.pdf | 30 May 2025 |
| Form 1File: June 2023 Form 1.pdf | 30 May 2025 |
| Form 2File: Jun 2023 Form 2.pdf | 30 May 2025 |
| Form 3File: Jun 2023 Form 3.pdf | 30 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Jun 2023 Sold Unsold.pdf | 30 May 2025 |
| Form 1File: Sep 2023 Form 1.pdf | 30 May 2025 |
| Form 2File: Sep 2023 Form 2.pdf | 30 May 2025 |
| Form 3File: Sep 2023 Form 3.pdf | 30 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Sep 2023 Sold Unsold.pdf | 30 May 2025 |
| Form 1File: Dec 2023 Form 1.pdf | 30 May 2025 |
| Form 2File: Dec 2023 Form 2.pdf | 30 May 2025 |
| Form 3File: Dec 2023 Form 3.pdf | 30 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Dec 2023 Sold Unsold.pdf | 30 May 2025 |
| Form 1File: March 2024 Form 1.pdf | 30 May 2025 |
| Form 2File: March 2024 Form 2.pdf | 30 May 2025 |
| Form 3File: March 2024 Form 3.pdf | 30 May 2025 |
| Disclosure of Sold and Booked InventoryFile: March 2024 Sold Unsold.pdf | 30 May 2025 |
| Form 1File: jun 2024 Form 1.pdf | 30 May 2025 |
| Form 2File: Jun 2024 Form 2.pdf | 30 May 2025 |
| Form 3File: Jun 2024 Form 3.pdf | 30 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Jun 2024 Sold Unsold.pdf | 30 May 2025 |
| Form 1File: Spe 2024 Form 1.pdf | 30 May 2025 |
| Form 2File: Sep 2024 Form 2.pdf | 30 May 2025 |
| Form 3File: Sep 2024 Form 3.pdf | 30 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Sep 2024 Sold Unsold.pdf | 30 May 2025 |
| Form 1File: Dec 2024 Form 1.pdf | 30 May 2025 |
| Form 2File: Dec 2024 Form 2.pdf | 30 May 2025 |
| Form 3File: Dec 2024 Form 3.pdf | 30 May 2025 |
| Disclosure of Sold and Booked InventoryFile: Dec 2024 Sold Unsold.pdf | 30 May 2025 |
| Form 1File: March 2025 Form 1.pdf | 30 May 2025 |
| Form 2File: March 2025 Form 2 kamal Residency (1).pdf | 30 May 2025 |
| Form 3File: March 2025 Form 3_compressed.pdf | 30 May 2025 |
| Disclosure of Sold and Booked InventoryFile: March 2025 Sold Unsold.pdf | 30 May 2025 |
| Declaration in FORM BFile: DocScanner Feb 27, 2025 1-15 PM(1).pdf | 27 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold.pdf | 27 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: rera varad 2 1 25.pdf | 12 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New Doc 01-24-202511zon.pdf | 12 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 12 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: kamal recidency dec qtr.pdf | 12 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: New Doc 01-24-2025.pdf | 12 Feb 2025 |
| Declaration in FORM BFile: P52100033597_FileName_2.pdf | 9 Jan 2025 |
| Declaration about Commencement CertificateFile: Declaration Commencement.pdf | 9 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Rera sold-unsold inventory upto 30_09_2024_241113_154135.pdf | 6 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GetUserDocumentFileContent (34) (1).pdf | 5 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rera Certificate _20221124_0001_241205_113049_11zon.pdf | 5 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rera Certificate _20221124_0001_241205_113049_compressed.pdf | 5 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22) (7) (1).pdf | 5 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) (23) (1).pdf | 5 Dec 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 151 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep KAMAL RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CHIKHALI13,700+ in Pune
Filed coordinates, straight-line distance. 225 registered projects within 2 km.
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: M/S VARAD DEVELOPERS
M/S VARAD DEVELOPERS has 1 registration on MahaRERA, including KAMAL RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that KAMAL RESIDENCY shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if KAMAL RESIDENCY is delayed beyond 30 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of KAMAL RESIDENCY?
The registered promoter entity is M/S VARAD DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in KAMAL RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for KAMAL RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at KAMAL RESIDENCY?
The professionals named in the filing: Architect: CP DESIGN STUDIO; Engineer: MR SANKALP M PATIL; Engineer: Rohinee Badgujar; Chartered Accountant: ANITA L LIMAYE; Chartered Accountant: Mahesh Malhotra. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in KAMAL RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback