ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Kalpataru Radiance C

Completed Litigation declared Residential / Group Housing project

Kalpataru Radiance C

By Keyana Estate LLP

RG-MH-09144 · RERA P51800000482 · Last updated on MahaRERA portal: 11 Oct 2024

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • 33 complaints at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Internal walls, 99%
33Complaints at MahaRERAon this registration
Jump to the 35 documents Report an error

Kalpataru Radiance C is a Residential / Group Housing project by Keyana Estate LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800000482 on 18 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2023. The completion date has moved by 18 months from the original filing. 33 complaints are on record with the regulator.

At a glance

Project

  • NameKalpataru Radiance C
  • TypeResidential / Group Housing
  • Location
    • Rood No. 13
    • Motilal Nagar
    • Goregaon West
    • Borivali
    • Mumbai Suburban
    • 400104
  • Pincode400104
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800000482
  • ReraGenie IDRG-MH-09144

Builder

  • NameKeyana Estate LLP
  • Entity typeOthers
  • PartnerImtiaz Kanga
  • Named personsAzure Tree Developers LLP, Kalpataru Limited, Ananta Ventures LLP, Trustee of Rajmani Trust, Data Bank Office Staples (I) Private Limited, Durable Stationary Private Limited
  • Other registrations4 more →
  • Completed5 of 5

Key dates

this monthRegisteredJul 2017First promiseJun 2022Revised toDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Jul 2017
  • Promised completion30 Dec 2023
  • Revised completionRevised to 30 Dec 2023 (originally 30 Jun 2022)
  • Buildings1 building record
  • Documents filed35 files

Current status

90.6%Work done, per cost certificate

Figures as on 11 Oct 2024, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing C-AlluraNA380000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 99%.

Wing C-Allura: 97% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Sanitary Fittings within the flats / premises88%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities19

As on 11 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes92%
Water SupplyYes75%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes78%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes60%
Water conservation /Rain water harvestingYes80%
Energy managemcntYes30%
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationYes73%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
NANoNot applicable
Club House,Fitness Centre Swimming pool & other Recreation areasYes27%
3 Nos. of Common Podiums/E-deckYes81%
2 Nos. of Common BasementsYes80%

Parking filed275

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots275
Closed/Covered270
Open Space5

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area895 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI21280.0
Proposed, not sanctioned20,930 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFree Press House, 215, Nariman Point, Mumbai - 400021
Estimated costRs 127.64 cr
Cost incurredRs 115.63 cr
Work done90.58%
BuildingWingEstimatedIncurred
Wing C-AlluraNARs 97.55 crRs 93.72 cr
-NARs 30.09 crRs 21.90 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/S Entech Consultant (Form 1 & Form 4)
ArchitectSpace Moulders
ArchitectArchitect Hafeez Contractor
EngineerMukesh Jadhav
EngineerPravin Gala Consultants Pvt Ltd
Chartered AccountantC.R Mohnot & Co.
PartnerRole in project
Keyana Estate LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800006084Jun 2022 → Jun 2023

Reason as filed by the promoterWe hereby submit for your kind advice and guidance in the matter: Kiyana Ventures LLP (Promoter) is a promoter of the real estate projects namely Kalpataru Radiance C (Project) (bearing Maha-RERA Registration No P51800000482). At the time of filing of application on MahaRERA portal, we have submitted the Project completion date as 31st December, 2021. We may inform that the development and construction of the Project is fully completed. However, due to pending litigation, pertaining to the redevelopment of Sidharth Nagar at Goregaon (“Larger land”), which includes the Project land, before the

Litigation declared1

CaseCourtStatus
Suit Lodging No 176/2018Bombay High CourtPending

Complaints filed with MahaRERA33

Case no.ComplainantRespondentFiled
CC006000000429257RAJIVE KHOSLAKeyana Estate LLP15/02/2024
CC006000000110892Anurag LakhaniKiyana Ventures LLP27/12/2019
CC006000000171610Gopika GajariaKiyana Ventures LLP24/12/2019
CC006000000192312Dusmanta PradhanKiyana Venture LLP28/01/2020
CC006000000192945JAYESH J DAVEKIYANA VENTURES LLP15/03/2020
CC006000000193698Ashok Ramachandran NairKiyana Ventures LLP13/08/2020
CC006000000194344ASHOK D KARWAM/S KIYANA VENTURES LLP12/10/2020
CC006000000195075Nilufer PanthankiKiyana Ventures LLP30/11/2020
CC006000000480041Kalpataru LimitedAbdulhusen M Neemuchwala11/04/2024
CC006000000198312AJAY MOHAN KAWALE AND VARSHA AJAY KAWALEKIYANA VENTURES LLP09/09/2021
CC006000000198846RAMESH ASHARKIYANA VENTURES LLP28/10/2021
CC006000000209471Ashish Nandan PisharodiKiyana Ventures LLP31/03/2022
CC006000000209676PARUL SAMIR UNADKAT AND SAMIR JAYSUKHLAL UNADKATKIYANA VENTURES LLP12/01/2022
CC006000000209730Tanishk DaasKIYANA VENTURES PVT LLP11/02/2022
CC006000000292573Abdulhusen M NeemuchwalaKiyana Ventures LLP07/09/2022
CC006000000302886Ramesh Bhoorchand ShahKIYANA VENTURES LLP29/09/2022
CC006000000210509Jitendra K JainM/s Kiyana Ventures LLP31/03/2022
CC006000000364563GAURAV HARI SHANKAR SINGHALKIARA VENTURES LLP26/06/2023
CC006000000375377Shirley Nagesh BurlaKiyana Ventures LLP25/04/2023
CC006000000395445Mr Mosalakanti Venkata Raghavendra Prabhu and Mrs Mosalakanti Vaishali PrabhuKiyana Ventures LLP01/05/2023
CC006000000408557SHERYL sethiKiyana Ventures07/01/2024
CC006000000428746Alka AgarwalKeyana Estate LLP06/01/2024
CC006000000469755RAJESH VOHRAKIYAAN VENTURES LLP27/03/2024
CC006000000480122Keyana Estate LLPAbdulhusen Neemuchwala & Nafisa A. Neemuchwala18/04/2024
CC006000000480226Keyana Estate LLPKarthiyayani Nair and Anr25/04/2024
CC006000000480224Bhavik H BhandariKiyana Ventures LLP25/04/2024
CC12400226Prayagraj Kshatrapal YadavKeyana Estate LLP25/09/2024
CC12502356Keyana Estate LLPSUNIL SHARMA11/07/2025
CC12503333Keyana Estate LLPsheryll Gurdev Sethi18/09/2025
CC12503567Vinit JindalKeyana Estate LLP07/10/2025
CC12503826Haresh Ishwardas KhatwaniKeyana Estate LLP01/11/2025
CC12504024Sunil SharmaKeyana Estate LLP15/11/2025
CC12504290Keyana Estate LLPASHOK KARWA04/12/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Apr 2023

Documents filed35

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Radiance C.pdf11 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Radiance C.pdf11 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Radiance C.pdf30 Sep 2023
Disclosure of sold/ booked inventoryFile: K Radiance C.pdf28 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC LETTER 10-04-2023.pdf19 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Rediance C.PDF19 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiance C.pdf23 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiance C.pdf23 Feb 2023
Certificates of CA (Form 3)File: Radiance C Dec22.pdf23 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 2 Certificates of CA (Form 5) (15).pdf19 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Radiance C.pdf30 Sep 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 Kiyana Radiance C.pdf5 Oct 2021
Declaration about Commencement CertificateFile: radiance c.pdf4 Oct 2021
Layout approvalFile: download.pdf15 Aug 2021
Copy of Layout Approval (in case of layout)File: download.pdf15 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5_Kiyana_Radiance C_F.pdf9 Oct 2020
Architect’s Certificate on Completion of Project (Form 4)File: Radiance C.pdf24 Jan 2020
Certificates of CA (Form 5)File: Kalpataru Radiance C.pdf30 Sep 2019
Certificates of CA (Form 5)File: Kiyana C.pdf29 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: 4 Radiance.pdf23 Mar 2018
Details of encumbrancesFile: Radiance C.pdf2 Feb 2018
Details of encumbrancesFile: Radiance C.pdf6 Dec 2017
Proforma of Allotment letterFile: LOI and AFS - Project C.pdf14 Jul 2017
Building plan approvalFile: Radiance Issue Letter_amended plan.pdf13 Jul 2017
Layout approvalFile: LayoutPlan-compressed.pdf13 Jul 2017
Copy of the legal title reportFile: Title Search Report Radiance.pdf13 Jul 2017
Copy of Layout Approval (in case of layout)File: LayoutPlan-compressed.pdf13 Jul 2017
Building Plan Approval (IOD)File: Radiance Issue Letter_amended plan.pdf13 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC_Wing A_C_D.pdf13 Jul 2017
Declaration in FORM BFile: Form B Radiance C.pdf12 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate Radiance C.pdf12 Jul 2017
Certificates of CA (Form 3)File: CA certificate Radiance C 1.pdf12 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiance C Engineer Certificate.pdf11 Jul 2017
Details of encumbrancesFile: Encumbrance Certificate (Radiance) IL.pdf8 Jul 2017
PAN CardFile: Kiyana Ventre LLP.pdf30 Jun 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 18 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kalpataru Radiance C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Goregaon West6,700+ in Mumbai Suburban

2 kmKalpataru Radiance CCompleted 140Lapsed / revoked 82Abeyance 1Other 143Dot size: filed unitsN

Filed coordinates, straight-line distance. 366 registered projects within 2 km.

Builder: Keyana Estate LLP

Keyana Estate LLP has 5 registrations on MahaRERA, including Kalpataru Radiance A and Kalpataru Radiance C. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Kalpataru Radiance C is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kalpataru Radiance C?

The registered promoter entity is Keyana Estate LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kalpataru Radiance C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Kalpataru Radiance C?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Kalpataru Radiance C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kalpataru Radiance C?

The professionals named in the filing: Architect: M/S Entech Consultant (Form 1 & Form 4); Architect: Space Moulders; Architect: Architect Hafeez Contractor; Engineer: Mukesh Jadhav; Engineer: Pravin Gala Consultants Pvt Ltd; Chartered Accountant: C.R Mohnot & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kalpataru Radiance C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kalpataru Radiance C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kalpataru Radiance C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.