Completed Litigation declared Residential / Group Housing project

Kalpataru Radiance B

By Keyana Estate LLP

RG-MH-11277 · RERA P51800000810 · Last updated on MahaRERA portal: 11 Oct 2024

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • 28 complaints at MahaRERA
  • Completion date moved by 30 months
  • 2 extensions taken

Clear

  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Installation of Lifts, 90%
28Complaints at MahaRERAon this registration
Jump to the 120 documents Report an error

Kalpataru Radiance B is a Residential / Group Housing project by Keyana Estate LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800000810 on 23 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2024. The completion date has moved by 30 months from the original filing. 28 complaints are on record with the regulator.

At a glance

Project

  • NameKalpataru Radiance B
  • TypeResidential / Group Housing
  • Location
    • Road No. 13
    • Motilal Nagar
    • Goregaon West
    • Borivali
    • Mumbai Suburban
    • 400104
  • Pincode400104
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800000810
  • ReraGenie IDRG-MH-11277

Builder

  • NameKeyana Estate LLP
  • Entity typeOthers
  • PartnerImtiaz Kanga
  • Named personsAzure Tree Developers LLP, Kalpataru Limited, Ananta Ventures LLP, Trustee of Rajmani Trust, Data Bank Office Staples (I) Private Limited, Durable Stationary Private Limited
  • Other registrations4 more →
  • Completed5 of 5

Key dates

this monthRegisteredJul 2017First promiseJun 2022Revised toDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Jul 2017
  • Promised completion30 Dec 2024
  • Revised completionRevised to 30 Dec 2024 (originally 30 Jun 2022)
  • Buildings1 building record
  • Documents filed120 files

Current status

94.2%Work done, per cost certificate

Figures as on 11 Oct 2024, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing B - BrillianceNA370000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 90%.

Wing B - Brilliance: 95% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities18

As on 11 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes94%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
2 No. of Common BasementYes100%
3 Nos of Podiums E DeckYes100%
Club House Fitness Centre Swimming Pool and other Recreational AreasYes85%

Parking filed283

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots283
Closed/Covered283

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area851 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI19835.0
Proposed, not sanctioned19,485 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFree Press House, 215, Nariman Point Mumbai 400021
Estimated costRs 128.37 cr
Cost incurredRs 120.85 cr
Work done94.15%
BuildingWingEstimatedIncurred
Wing B - BrillianceNARs 100.10 crRs 94.43 cr
-NARs 28.27 crRs 26.43 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/S Entech Consultant (Form 1 & Form 4)
ArchitectSpace Moulders
ArchitectArchitect Hafeez Contractor
EngineerMukesh Jadhav
EngineerPravin Gala Consultants Pvt Ltd
Chartered AccountantC.R Mohnot & Co.
PartnerRole in project
Keyana Estate LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800006087Jun 2022 → Jun 2023

Reason as filed by the promoterWe hereby submit for your kind advice and guidance in the matter: Kiyana Ventures LLP (Promoter) is a promoter of the real estate projects namely Kalpataru Radiance B (Project) (bearing Maha-RERA Registration No P51800000810). At the time of filing of application on MahaRERA portal, we have submitted the Project completion date as 31st December, 2021. We may inform that due to pending litigation, pertaining to the redevelopment of Sidharth Nagar at Goregaon (“Larger land”), which includes the Project land, before the Hon’ble Bombay High Court, grant of occupancy certificate for the Project fro

EXT51800018535Jun 2022 → Dec 2024

Reason as filed by the promoterRespected Sir, We, Keyana Estate LLP (the Promoter), are promoter of large residential cum commercial complex having a common layout consisting of 5 (five) real estate projects bearing registration nos. P51800000591 (Kalpataru Radiance A), P51800000482 (Kalpataru Radiance C), P51800000579 (Kalpataru Radiance D), P51800013245 (Kalpataru Radiance E) and P51800000810 [Kalpataru Radiance B, (herein referred to as ‘Project’) and collectively referred to as ‘Real Estate Projects’] Status of 4 Projects out of Total 5 Real Estate Projects (Completed) 4 (four) out of total 5 Real Estate Projects, beari

Litigation declared1

CaseCourtStatus
Suit Lodging No 176/2018Bombay High CourtPending

Complaints filed with MahaRERA28

Case no.ComplainantRespondentFiled
CC006000000000702VISHAL JAINKALPATARU BUILDER19/09/2017
CC006000000193027Shuvam PanditKiyana Ventures LLP14/03/2020
CC006000000194363SANTOSH SONAR & MRS SWATI SONARKIYANA VENTURES LLP09/10/2020
CC006000000480018Kalpataru LimitedShyam Milan Desai & Hetvi Shyam Desai11/04/2024
CC006000000480037Kalpataru LimitedAnand Suresh Desai, Ami Anand Desai and Urmila Anand Desai11/04/2024
CC006000000196695Rashmi SatheKiyana Ventures LLP12/04/2021
CC006000000196899Pankaj Awasthi and Sonia AwasthiKiyana Ventures LLP04/05/2021
CC006000000197494Sunita SinghKiyana Ventures LLP29/07/2021
CC006000000197497Aahana KumraKiyana Ventures LLP30/07/2021
CC006000000198191Steve Roshan RebelloKiyana Ventures LLP09/09/2021
CC006000000210370Vilesh Hasmukhlal MehtaKiyana Ventures LLP14/04/2022
CC006000000221085BHAVESH VEDKiyana Ventures LLP14/05/2022
CC006000000221129SHYAM DESAIKIYANA VENTURES LLP10/05/2022
CC006000000251326SANJAY K DESAIKIYANA VENTURES LLP12/06/2022
CC006000000292807Anand Suresh DesaiKiyana Ventures LLP24/09/2022
CC006000000303114Mr. Rajeev and Mrs. Priyanka MohtaKIYANA VENTURES LLP28/11/2022
CC006000000303531Ramgopal Rameshwarlal PanchbhaiKiyana Venture LLP01/12/2022
CC006000000303578DHRUTI JIGAR MEHTAKIYANA VENTURES LLP07/12/2022
CC006000000303700Nikhil Mukesh WadhwaniM/s. Kiyana Ventures LLP24/12/2022
CC006000000397049Dwiti Hitanshu MehtaKiyana Ventures LLP12/08/2023
CC006000000428823PIYUSH RAMESHCHANDRA SHAHKEYANA ESTATE LLP31/01/2024
CC006000000480137Keyana Estate LLPSteve Roshan Rebello and Kern Lynda Rebello25/04/2024
CC12502439Keyana Estate LLPMILAP PANCHAL17/07/2025
CC12502440Keyana Estate LLPPradip Bhardwaj17/07/2025
CC12502498Keyana Estate LLPRupesh Chamedia21/07/2025
CC12502701Arindam DeKeyana Estate LLP02/08/2025
CC12503337Keyana Estate LLPPINAK MEHTA18/09/2025
CC12504333Kavita ShrivastavaKeyana Estate LLP07/12/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 May 2024

Documents filed120

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 120 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Radiance B.pdf11 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Radiance B.pdf11 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Rediance B.pdf14 Jun 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC 16MAY24.pdf22 May 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Radiance Wing B.pdf22 May 2024
Disclosure of sold/ booked inventoryFile: Radiacne B.pdf3 May 2024
Certificates of CA (Form 3)File: CA Certificate Radiance Mar24.pdf20 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Kalpataru Radiance B.pdf19 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Kalpataru Radiance B.pdf19 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf14 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate as on 24 Feb 2024.pdf27 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Radiance B Form 2A 19-20.pdf8 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Radiance B Form 2A 20-21.pdf8 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Radiance B Form 2A 21-22.pdf8 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Radiance B Form 2A 22-23.pdf8 Feb 2024
Disclosure of sold/ booked inventoryFile: K Radiance B.pdf7 Feb 2024
Disclosure of sold/ booked inventoryFile: Radiance B 31March 22.pdf7 Feb 2024
Disclosure of sold/ booked inventoryFile: Radiance B 30 June 22.pdf7 Feb 2024
Disclosure of sold/ booked inventoryFile: Radiance B 30Sept22.pdf7 Feb 2024
Disclosure of sold/ booked inventoryFile: Radiance B 31Dec22.pdf7 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiacne B Aug 2017.pdf6 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiacne B Nov2017.pdf6 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiacne B Feb2018.pdf6 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiacne B May2018.pdf6 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiacne B Aug 2018_UPLOAD.pdf6 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiacne B Nov2018.pdf6 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiacne B Feb2019.pdf6 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiacne B May2019.pdf6 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiacne B Aug 2019.pdf6 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiacne B Nov2019.pdf6 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiance B Oct2020.pdf6 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiance B April2021.pdf6 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiance B June2021.pdf6 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiance B Sept2021.pdf6 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiance B Dec2021.pdf6 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiance B.pdf6 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiance B.pdf6 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: kalpataru Radiance B.pdf6 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: K Radiance B.pdf6 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: K Radiance B.pdf6 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiacne B Aug 2017.pdf6 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiacne B Sept2017.pdf6 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiacne B Feb2018.pdf6 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiacne B May2018.pdf6 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiacne B Aug2018.pdf6 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiacne B Nov2018.pdf6 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiacne B Feb2019.pdf6 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiacne B May2019.pdf6 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiacne B Aug2019.pdf6 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiacne B Nov2019.pdf6 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiacne B Feb2020.pdf6 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiacne B oct2020.pdf6 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiacne B April2021.pdf6 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiacne B June2021.pdf6 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiance B Sept2021.pdf6 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiance B Dec2021.pdf6 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiance B.pdf6 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiance B.pdf6 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: kalpataru Radiance B.pdf6 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiance B.pdf6 Feb 2024
Certificates of CA (Form 3)File: Radiance B Sept2017.pdf6 Feb 2024
Certificates of CA (Form 3)File: Radiance B Feb2018.pdf6 Feb 2024
Certificates of CA (Form 3)File: Radiance B May2018.pdf6 Feb 2024
Certificates of CA (Form 3)File: Radiance B Aug2018.pdf6 Feb 2024
Certificates of CA (Form 3)File: Radiance B Nov2018.pdf6 Feb 2024
Certificates of CA (Form 3)File: Radiance B Feb2019.pdf6 Feb 2024
Certificates of CA (Form 3)File: Radiance B May2019.pdf6 Feb 2024
Certificates of CA (Form 3)File: Radiance B Aug2019.pdf6 Feb 2024
Certificates of CA (Form 3)File: Radiance B Nov2019.pdf6 Feb 2024
Certificates of CA (Form 3)File: Radiance B Feb2020.pdf6 Feb 2024
Certificates of CA (Form 3)File: Radiance B Oct2020.pdf6 Feb 2024
Certificates of CA (Form 3)File: Radiance B Apr2021.pdf6 Feb 2024
Certificates of CA (Form 3)File: Radiance B Jun2021.pdf6 Feb 2024
Certificates of CA (Form 3)File: Radiance B Sept2021.pdf6 Feb 2024
Certificates of CA (Form 3)File: Radiance B Dec2021.pdf6 Feb 2024
Certificates of CA (Form 3)File: Kalpataru Radiance B March 22.pdf6 Feb 2024
Certificates of CA (Form 3)File: Kalpataru Radiance B June 2022.pdf6 Feb 2024
Certificates of CA (Form 3)File: Radiance B.pdf6 Feb 2024
Certificates of CA (Form 3)File: Radiance B.pdf6 Feb 2024
Disclosure of sold/ booked inventoryFile: K Radiance B.pdf30 Jan 2024

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 30 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kalpataru Radiance B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Goregaon West6,700+ in Mumbai Suburban

2 kmKalpataru Radiance BCompleted 141Lapsed / revoked 82Abeyance 1Other 143Dot size: filed unitsN

Filed coordinates, straight-line distance. 367 registered projects within 2 km.

Builder: Keyana Estate LLP

Keyana Estate LLP has 5 registrations on MahaRERA, including Kalpataru Radiance A and Kalpataru Radiance C. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Kalpataru Radiance B is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kalpataru Radiance B?

The registered promoter entity is Keyana Estate LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kalpataru Radiance B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Kalpataru Radiance B?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Kalpataru Radiance B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kalpataru Radiance B?

The professionals named in the filing: Architect: M/S Entech Consultant (Form 1 & Form 4); Architect: Space Moulders; Architect: Architect Hafeez Contractor; Engineer: Mukesh Jadhav; Engineer: Pravin Gala Consultants Pvt Ltd; Chartered Accountant: C.R Mohnot & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kalpataru Radiance B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kalpataru Radiance B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kalpataru Radiance B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.