Home / Browse projects / Mumbai Suburban, Maharashtra / Kalpataru Radiance B
Kalpataru Radiance B
RG-MH-11277 · RERA P51800000810 · Last updated on MahaRERA portal: 11 Oct 2024
Source: official MahaRERA filing
Red flags
- Litigation declared, 1 case
- 28 complaints at MahaRERA
- Completion date moved by 30 months
- 2 extensions taken
Clear
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Kalpataru Radiance B is a Residential / Group Housing project by Keyana Estate LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800000810 on 23 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2024. The completion date has moved by 30 months from the original filing. 28 complaints are on record with the regulator.
At a glance
Project
- NameKalpataru Radiance B
- TypeResidential / Group Housing
- Location
- Road No. 13
- Motilal Nagar
- Goregaon West
- Borivali
- Mumbai Suburban
- 400104
- Pincode400104
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800000810
- ReraGenie IDRG-MH-11277
Builder
- NameKeyana Estate LLP
- Entity typeOthers
- PartnerImtiaz Kanga
- Named personsAzure Tree Developers LLP, Kalpataru Limited, Ananta Ventures LLP, Trustee of Rajmani Trust, Data Bank Office Staples (I) Private Limited, Durable Stationary Private Limited
- Other registrations4 more →
- Completed5 of 5
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on23 Jul 2017
- Promised completion30 Dec 2024
- Revised completionRevised to 30 Dec 2024 (originally 30 Jun 2022)
- Buildings1 building record
- Documents filed120 files
Current status
Figures as on 11 Oct 2024, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing B - Brilliance | NA | 37 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 11 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 90%.
Wing B - Brilliance: 95% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities18
As on 11 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 94% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
| 2 No. of Common Basement | Yes | 100% |
| 3 Nos of Podiums E Deck | Yes | 100% |
| Club House Fitness Centre Swimming Pool and other Recreational Areas | Yes | 85% |
Parking filed283
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing B - Brilliance | NA | Rs 100.10 cr | Rs 94.43 cr |
| - | NA | Rs 28.27 cr | Rs 26.43 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | M/S Entech Consultant (Form 1 & Form 4) |
| Architect | Space Moulders |
| Architect | Architect Hafeez Contractor |
| Engineer | Mukesh Jadhav |
| Engineer | Pravin Gala Consultants Pvt Ltd |
| Chartered Accountant | C.R Mohnot & Co. |
| Partner | Role in project |
|---|---|
| Keyana Estate LLP | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe hereby submit for your kind advice and guidance in the matter: Kiyana Ventures LLP (Promoter) is a promoter of the real estate projects namely Kalpataru Radiance B (Project) (bearing Maha-RERA Registration No P51800000810). At the time of filing of application on MahaRERA portal, we have submitted the Project completion date as 31st December, 2021. We may inform that due to pending litigation, pertaining to the redevelopment of Sidharth Nagar at Goregaon (“Larger land”), which includes the Project land, before the Hon’ble Bombay High Court, grant of occupancy certificate for the Project fro
Reason as filed by the promoterRespected Sir, We, Keyana Estate LLP (the Promoter), are promoter of large residential cum commercial complex having a common layout consisting of 5 (five) real estate projects bearing registration nos. P51800000591 (Kalpataru Radiance A), P51800000482 (Kalpataru Radiance C), P51800000579 (Kalpataru Radiance D), P51800013245 (Kalpataru Radiance E) and P51800000810 [Kalpataru Radiance B, (herein referred to as ‘Project’) and collectively referred to as ‘Real Estate Projects’] Status of 4 Projects out of Total 5 Real Estate Projects (Completed) 4 (four) out of total 5 Real Estate Projects, beari
Litigation declared1
| Case | Court | Status |
|---|---|---|
| Suit Lodging No 176/2018 | Bombay High Court | Pending |
Complaints filed with MahaRERA28
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000000702 | VISHAL JAIN | KALPATARU BUILDER | 19/09/2017 |
| CC006000000193027 | Shuvam Pandit | Kiyana Ventures LLP | 14/03/2020 |
| CC006000000194363 | SANTOSH SONAR & MRS SWATI SONAR | KIYANA VENTURES LLP | 09/10/2020 |
| CC006000000480018 | Kalpataru Limited | Shyam Milan Desai & Hetvi Shyam Desai | 11/04/2024 |
| CC006000000480037 | Kalpataru Limited | Anand Suresh Desai, Ami Anand Desai and Urmila Anand Desai | 11/04/2024 |
| CC006000000196695 | Rashmi Sathe | Kiyana Ventures LLP | 12/04/2021 |
| CC006000000196899 | Pankaj Awasthi and Sonia Awasthi | Kiyana Ventures LLP | 04/05/2021 |
| CC006000000197494 | Sunita Singh | Kiyana Ventures LLP | 29/07/2021 |
| CC006000000197497 | Aahana Kumra | Kiyana Ventures LLP | 30/07/2021 |
| CC006000000198191 | Steve Roshan Rebello | Kiyana Ventures LLP | 09/09/2021 |
| CC006000000210370 | Vilesh Hasmukhlal Mehta | Kiyana Ventures LLP | 14/04/2022 |
| CC006000000221085 | BHAVESH VED | Kiyana Ventures LLP | 14/05/2022 |
| CC006000000221129 | SHYAM DESAI | KIYANA VENTURES LLP | 10/05/2022 |
| CC006000000251326 | SANJAY K DESAI | KIYANA VENTURES LLP | 12/06/2022 |
| CC006000000292807 | Anand Suresh Desai | Kiyana Ventures LLP | 24/09/2022 |
| CC006000000303114 | Mr. Rajeev and Mrs. Priyanka Mohta | KIYANA VENTURES LLP | 28/11/2022 |
| CC006000000303531 | Ramgopal Rameshwarlal Panchbhai | Kiyana Venture LLP | 01/12/2022 |
| CC006000000303578 | DHRUTI JIGAR MEHTA | KIYANA VENTURES LLP | 07/12/2022 |
| CC006000000303700 | Nikhil Mukesh Wadhwani | M/s. Kiyana Ventures LLP | 24/12/2022 |
| CC006000000397049 | Dwiti Hitanshu Mehta | Kiyana Ventures LLP | 12/08/2023 |
| CC006000000428823 | PIYUSH RAMESHCHANDRA SHAH | KEYANA ESTATE LLP | 31/01/2024 |
| CC006000000480137 | Keyana Estate LLP | Steve Roshan Rebello and Kern Lynda Rebello | 25/04/2024 |
| CC12502439 | Keyana Estate LLP | MILAP PANCHAL | 17/07/2025 |
| CC12502440 | Keyana Estate LLP | Pradip Bhardwaj | 17/07/2025 |
| CC12502498 | Keyana Estate LLP | Rupesh Chamedia | 21/07/2025 |
| CC12502701 | Arindam De | Keyana Estate LLP | 02/08/2025 |
| CC12503337 | Keyana Estate LLP | PINAK MEHTA | 18/09/2025 |
| CC12504333 | Kavita Shrivastava | Keyana Estate LLP | 07/12/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Aug 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 22 May 2024
Documents filed120
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 120 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Radiance B.pdf | 11 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Radiance B.pdf | 11 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Rediance B.pdf | 14 Jun 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC 16MAY24.pdf | 22 May 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Radiance Wing B.pdf | 22 May 2024 |
| Disclosure of sold/ booked inventoryFile: Radiacne B.pdf | 3 May 2024 |
| Certificates of CA (Form 3)File: CA Certificate Radiance Mar24.pdf | 20 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Kalpataru Radiance B.pdf | 19 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Kalpataru Radiance B.pdf | 19 Apr 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf | 14 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate as on 24 Feb 2024.pdf | 27 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Radiance B Form 2A 19-20.pdf | 8 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Radiance B Form 2A 20-21.pdf | 8 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Radiance B Form 2A 21-22.pdf | 8 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Radiance B Form 2A 22-23.pdf | 8 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: K Radiance B.pdf | 7 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Radiance B 31March 22.pdf | 7 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Radiance B 30 June 22.pdf | 7 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Radiance B 30Sept22.pdf | 7 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Radiance B 31Dec22.pdf | 7 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiacne B Aug 2017.pdf | 6 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiacne B Nov2017.pdf | 6 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiacne B Feb2018.pdf | 6 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiacne B May2018.pdf | 6 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiacne B Aug 2018_UPLOAD.pdf | 6 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiacne B Nov2018.pdf | 6 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiacne B Feb2019.pdf | 6 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiacne B May2019.pdf | 6 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiacne B Aug 2019.pdf | 6 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiacne B Nov2019.pdf | 6 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiance B Oct2020.pdf | 6 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiance B April2021.pdf | 6 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiance B June2021.pdf | 6 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiance B Sept2021.pdf | 6 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiance B Dec2021.pdf | 6 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiance B.pdf | 6 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Radiance B.pdf | 6 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: kalpataru Radiance B.pdf | 6 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: K Radiance B.pdf | 6 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: K Radiance B.pdf | 6 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiacne B Aug 2017.pdf | 6 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiacne B Sept2017.pdf | 6 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiacne B Feb2018.pdf | 6 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiacne B May2018.pdf | 6 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiacne B Aug2018.pdf | 6 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiacne B Nov2018.pdf | 6 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiacne B Feb2019.pdf | 6 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiacne B May2019.pdf | 6 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiacne B Aug2019.pdf | 6 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiacne B Nov2019.pdf | 6 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiacne B Feb2020.pdf | 6 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiacne B oct2020.pdf | 6 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiacne B April2021.pdf | 6 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiacne B June2021.pdf | 6 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiance B Sept2021.pdf | 6 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiance B Dec2021.pdf | 6 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiance B.pdf | 6 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiance B.pdf | 6 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: kalpataru Radiance B.pdf | 6 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Radiance B.pdf | 6 Feb 2024 |
| Certificates of CA (Form 3)File: Radiance B Sept2017.pdf | 6 Feb 2024 |
| Certificates of CA (Form 3)File: Radiance B Feb2018.pdf | 6 Feb 2024 |
| Certificates of CA (Form 3)File: Radiance B May2018.pdf | 6 Feb 2024 |
| Certificates of CA (Form 3)File: Radiance B Aug2018.pdf | 6 Feb 2024 |
| Certificates of CA (Form 3)File: Radiance B Nov2018.pdf | 6 Feb 2024 |
| Certificates of CA (Form 3)File: Radiance B Feb2019.pdf | 6 Feb 2024 |
| Certificates of CA (Form 3)File: Radiance B May2019.pdf | 6 Feb 2024 |
| Certificates of CA (Form 3)File: Radiance B Aug2019.pdf | 6 Feb 2024 |
| Certificates of CA (Form 3)File: Radiance B Nov2019.pdf | 6 Feb 2024 |
| Certificates of CA (Form 3)File: Radiance B Feb2020.pdf | 6 Feb 2024 |
| Certificates of CA (Form 3)File: Radiance B Oct2020.pdf | 6 Feb 2024 |
| Certificates of CA (Form 3)File: Radiance B Apr2021.pdf | 6 Feb 2024 |
| Certificates of CA (Form 3)File: Radiance B Jun2021.pdf | 6 Feb 2024 |
| Certificates of CA (Form 3)File: Radiance B Sept2021.pdf | 6 Feb 2024 |
| Certificates of CA (Form 3)File: Radiance B Dec2021.pdf | 6 Feb 2024 |
| Certificates of CA (Form 3)File: Kalpataru Radiance B March 22.pdf | 6 Feb 2024 |
| Certificates of CA (Form 3)File: Kalpataru Radiance B June 2022.pdf | 6 Feb 2024 |
| Certificates of CA (Form 3)File: Radiance B.pdf | 6 Feb 2024 |
| Certificates of CA (Form 3)File: Radiance B.pdf | 6 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: K Radiance B.pdf | 30 Jan 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 120 filed documents as one ZIP, foldered, with a manifest
Keep Kalpataru Radiance B on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Goregaon West6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 367 registered projects within 2 km.
Opulence
ARIHA BUILDTECH LLP
SHEETAL KIARA
A & A Developers
4TH AVENUE Sunteck City, ODC, Goregaon West
Satguru Corporate Services Pvt. Ltd.
Narang Valora
Narang Realty Private Limited
VIVAN
GOREGAON ELECTRICAL INDUSTRIES LLP
Integrated Ramicon
Integrated Affordable Home Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: Keyana Estate LLP
Keyana Estate LLP has 5 registrations on MahaRERA, including Kalpataru Radiance A and Kalpataru Radiance C. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Kalpataru Radiance B is delayed beyond 30 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Kalpataru Radiance B?
The registered promoter entity is Keyana Estate LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Kalpataru Radiance B?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Kalpataru Radiance B?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Kalpataru Radiance B?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Kalpataru Radiance B?
The professionals named in the filing: Architect: M/S Entech Consultant (Form 1 & Form 4); Architect: Space Moulders; Architect: Architect Hafeez Contractor; Engineer: Mukesh Jadhav; Engineer: Pravin Gala Consultants Pvt Ltd; Chartered Accountant: C.R Mohnot & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Kalpataru Radiance B?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback