Home / Browse projects / Raigarh, Maharashtra / Kalpataru Aria - Phase C

Completed No litigation declared Plotted project

Kalpataru Aria - Phase C

By Arena Orchards Private Limited

RG-MH-05544 · RERA P52000051573 · Last updated on MahaRERA portal: 22 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
28 of 166Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

Kalpataru Aria - Phase C is a Plotted project by Arena Orchards Private Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000051573 on 27 Jun 2023. The registration is recorded completed; possession was promised by 31 Dec 2025. 138 of the 166 units on this registration are recorded sold or booked.

At a glance

Project

  • NameKalpataru Aria - Phase C
  • TypePlotted
  • Location
    • Karjat khopoli Highway - NH 548A
    • Karjat
    • Varne
    • Raigarh
    • 410201
  • Pincode410201
  • RERA no.P52000051573
  • ReraGenie IDRG-MH-05544

Builder

  • NameArena Orchards Private Limited
  • Entity typeCompany
  • CINU01403MH2007PTC172833
  • GSTIN27AAGCA4638R2Z0
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorDevesh Bhatt
  • Other registrations4 more →
  • Completed2 of 5

Key dates

this monthRegisteredJun 2023PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on27 Jun 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed85 files

Current status

83%138 of 166 units booked

Figures as on 22 Jun 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area44,705 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Arena Enviro Farms Private LimitedAndheriMumbai Suburban
Ambrosia Enviro Farms Private LimitedAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMaharashtra State Road Development Corporation Limited
Permissible FSI74888.11

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor Jehangir Building M G Road Fort Mumbai 400023

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJethe & Associates
ArchitectNandkumar V Jethe (Form 1 and Form 4)
EngineerPrashant Palande
EngineerAshish Chandanshive (Form 2 and Form 2A)
Chartered AccountantSinghi & Co.
Chartered AccountantC.R Mohnot & Co.
Chartered AccountantC R Mohnot & Co (Form 3)
PartnerRole in project
Arena Orchards Private Limited-

Litigation declared2

CaseCourtStatus
RCS No 115 of 2016/2016Civil Judge Junior Division KarjatPending
RTS Appeal No 123 of 2022 /2022Sub Divisional Officer KarjatPending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Jan 2026

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A Aria Phase C.pdf22 Jun 2026
Completion CertificateFile: OC.pdf29 Jan 2026
Form 1File: Aria Phase C AC.pdf21 Jan 2026
Form 2File: Aria Phase C EC.pdf21 Jan 2026
Form 3File: Aria Phase C (Combined).pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: Aria Phase C.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: Kalpataru Aria Phase C.pdf20 Oct 2025
Form 1File: Aria Phase C AC.pdf20 Oct 2025
Form 2File: Aria Phase C EC.pdf20 Oct 2025
Form 3File: Aria Phase C.pdf20 Oct 2025
Form 5 (FY 2024-2025)File: Aria Phase C.pdf19 Sep 2025
Form 2A (FY 2024-2025)File: Aria Phase -C.pdf12 Aug 2025
Form 3File: Phase C (Combined).pdf20 Jul 2025
Form 1File: Arena Orcherds Phase C.pdf20 Jul 2025
Form 2File: EC Aria Phase C.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: AriaC.pdf20 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aria C Arena Orchards AC.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aria C Arena Orchards EC.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aria Phase C (Comb).pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aria C Arena Orchards EC.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aria C AC.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Arena Orchards Phase C.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aria C EC.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Aria - Phase C.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Aria C.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aria D Arena O.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PHC (002).pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aria C Arena.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aria D Arena.pdf20 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Aria C.pdf11 Oct 2024
Disclosure of sold/ booked inventoryFile: Aira C.pdf6 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aria Phase C.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aria Phase C.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: [Untitled].pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Aria Phase C.pdf14 Jun 2024
Disclosure of sold/ booked inventoryFile: K Aria Phase C.pdf9 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kalpataru Aria- Phase C.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Kalpataru Aria- Phase C.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CONSO ARENA PHASE C.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: K Aria Phase C.pdf30 Jan 2024
Layout approvalFile: Phase-II - Sheet-1_Upload.pdf29 Jan 2024
Building plan approval or NA orderFile: Final Approval_22122023.pdf29 Jan 2024
Copy of Layout Approval (in case of layout)File: Phase-II - Sheet-1_Upload.pdf29 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: Final Approval_22122023.pdf29 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aria Phase C.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aria Phase C.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aria Phase C.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Aria C.pdf3 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K Aria C.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K Aria C.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA FORM 3 CONSO ARENA PHASE C.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: K Aria C.pdf12 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Aria Phase C.pdf21 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Authorised Ltter.pdf21 Jun 2023
Copy of the legal title reportFile: TC.pdf15 Jun 2023
Other - LegalFile: Declaration Karjat Authorised to AOPL.pdf12 Jun 2023
Other - LegalFile: Annexure A A Goyal.pdf12 Jun 2023
Other - LegalFile: Annexure A P Kataria.pdf12 Jun 2023
Other - LegalFile: Conveyance_38_2 red_upload (1).pdf12 Jun 2023
Other - LegalFile: Conveyance_52_5 red_upload (1).pdf12 Jun 2023
Other - TechnicalFile: Total no plot entity wise.pdf12 Jun 2023
Declaration about Commencement CertificateFile: Aria C CCD.pdf6 Jun 2023
Other - LegalFile: Form B Final.pdf6 Jun 2023
Other - TechnicalFile: Total Plot Area Declaration.pdf6 Jun 2023
Proforma of Agreement for saleFile: AFS-Sector II - Arena Orchards (3152023) - Clean.pdf5 Jun 2023
Other - LegalFile: Revised CTS Declaration.pdf2 Jun 2023
Other - FinanceFile: Revised CTS Declaration.pdf2 Jun 2023
Layout approvalFile: Layout_upload.pdf17 May 2023
Copy of Layout Approval (in case of layout)File: Layout_upload.pdf17 May 2023
Other - TechnicalFile: S No and Boundaries Declaration.pdf17 May 2023
Building plan approval or NA orderFile: Tentative Approval_20042023.pdf16 May 2023
PAN CardFile: PAN.pdf16 May 2023
Details of encumbrances concerned to FinanceFile: EC Finance.pdf16 May 2023
Details of encumbrances concerned to LegalFile: EC Finance.pdf16 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Tentative Approval_20042023.pdf16 May 2023
Commencement Certificates / NA Order for plotted developmentFile: Tentative Approval_20042023.pdf16 May 2023
Declaration in FORM BFile: Form B- Arena Orchards Pvt Ltd.pdf16 May 2023
CERSAI detailsFile: CERSAI_Search_Report_200264023211_For_Asset_Based_Search_23_03_2023_15_45_25_164.pdf16 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Amit Shah.pdf16 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - VGB.pdf16 May 2023

How this compares with Raigarh

83%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kalpataru Aria - Phase C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Karjat5,900+ in Raigarh

Builder: Arena Orchards Private Limited

Arena Orchards Private Limited has 5 registrations on MahaRERA, including Kalpataru Aria - Phase A and Kalpataru Aria - Phase B. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Kalpataru Aria - Phase C is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kalpataru Aria - Phase C?

The registered promoter entity is Arena Orchards Private Limited, a company as per the filing. Its CIN U01403MH2007PTC172833 and GSTIN 27AAGCA4638R2Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kalpataru Aria - Phase C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kalpataru Aria - Phase C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kalpataru Aria - Phase C?

The professionals named in the filing: Architect: Jethe & Associates; Architect: Nandkumar V Jethe (Form 1 and Form 4); Engineer: Prashant Palande; Engineer: Ashish Chandanshive (Form 2 and Form 2A); Chartered Accountant: Singhi & Co.; Chartered Accountant: C.R Mohnot & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kalpataru Aria - Phase C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kalpataru Aria - Phase C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kalpataru Aria - Phase C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.