Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 12 months from the original
107 of 198Construction stages doneacross 18 buildings; furthest along: Installation of Lifts, 25%
3 of 18Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 129 documents Report an error

Kalpataru Aria - Phase B is a Residential / Group Housing project by Arena Orchards Private Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000050704 on 28 Apr 2023. Possession is promised by 31 Mar 2027. The completion date has moved by 12 months from the original filing. 15 of the 18 units on this registration are recorded sold or booked, and 107 of 198 construction stages are filed complete.

At a glance

Project

  • NameKalpataru Aria - Phase B
  • TypeResidential / Group Housing
  • Location
    • Karjat Khopoli Highway NH 548A
    • Karjat
    • Varne
    • Raigarh
    • 410201
  • Pincode410201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000050704
  • ReraGenie IDRG-MH-96216

Builder

  • NameArena Orchards Private Limited
  • Entity typeCompany
  • CINU01403MH2007PTC172833
  • GSTIN27AAGCA4638R2Z0
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorDevesh Bhatt
  • Other registrations4 more →
  • Completed2 of 5

Key dates

this monthRegisteredApr 2023First promiseMar 2026Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Apr 2023
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 31 Mar 2026)
  • Buildings18 building records
  • Documents filed129 files

Current status

83%15 of 18 units booked
75.7%Work done, per cost certificate

Figures as on 18 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Row House A1NA22101
Row House A2NA22101
Row House A3NA22101
Row House A4NA22101
Row House A5NA22101
Row House A6NA22101
Row House A7NA22101
Row House A8NA22101
Row House A9NA22101
Row House B19NA22101
Row House B20NA22101
Row House B21NA22101
Row House B22NA22101
Row House B23NA22101
Row House B24NA22101
Row House B25NA22101
Row House B26NA22101
Row House B27NA22101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building18

As on 18 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

107 of 198 construction stages are filed complete across 18 buildings. The stage furthest along is Installation of Lifts, at 25%.

Row House A157%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Row House A257%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Row House A357%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Row House A457%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Row House A557%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Row House A657%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Row House A757%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Row House A857%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Row House A948%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Row House B1957%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Row House B2057%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Row House B2157%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Row House B2257%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Row House B2357%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Row House B2457%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Row House B2557%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Row House B2657%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Row House B2757%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 18 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes95%
Street LightingYes95%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes65%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceYes95%
Open ParkingNoNot applicable

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,101 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Mar 2026
LandownerVillageDistrict
Arena Enviro Farms Private LimitedAndheriMumbai Suburban
Ambrosia Enviro FarmsAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMaharashtra State Road Development Corporation Limited
Permissible FSI4031.86
Proposed, not sanctioned1,916 sq m
Buildings approved18
Buildings sanctioned18

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor Jehangir Building M G Road Fort Mumbai 400023
Estimated costRs 14.05 cr
Cost incurredRs 10.63 cr
Work done75.71%
BuildingWingEstimatedIncurred
-NARs 4.19 crRs 3.50 cr
Row House B19NARs 54.98 lakhRs 51.08 lakh
Row House B20NARs 54.98 lakhRs 51.08 lakh
Row House B21NARs 54.98 lakhRs 51.08 lakh
Row House B22NARs 54.98 lakhRs 51.08 lakh
Row House B23NARs 54.98 lakhRs 51.08 lakh
Row House B24NARs 54.98 lakhRs 51.08 lakh
Row House B25NARs 54.98 lakhRs 51.08 lakh
Row House B26NARs 54.98 lakhRs 51.08 lakh
Row House B27NARs 54.98 lakhRs 51.08 lakh
Row House A1NARs 54.53 lakhRs 28.17 lakh
Row House A2NARs 54.53 lakhRs 28.17 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJethe & Associates
ArchitectNandkumar V Jethe (Form 1 and Form 4)
EngineerPrashant Palande
EngineerPravin Suryawanshi (Form 2 and Form 2A)
Chartered AccountantSinghi & Co.
Chartered AccountantC.R Mohnot & Co.
Chartered AccountantC R Mohnot & Co (Form 3)
PartnerRole in project
Arena Orchards Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA25032620366Mar 2026 → Mar 2027

Reason as filed by the promoterThe Promoter has appointed the Contractor for the construction of the said Project, however due to his non- performance the Project got delayed. Thereafter, to avoid further delay, the Promoter has appointed another contractor to complete the balance work of the Project by discontinuing the service of earlier Contractor. The Promoter states that due to non-performance of the Contractor, the Project is affected and the delay is occurred.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed129

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 129 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Aria Phase B merged.pdf18 Jul 2026
Withdrawal Update Form 1File: Aria Phase B merged.pdf18 Jul 2026
Withdrawal Update Form 2File: Aria Phase B merged EC.pdf18 Jul 2026
Withdrawal Update Form 2File: Aria Phase B merged EC.pdf18 Jul 2026
Withdrawal Update Form 3File: Aria Phase B Merged.pdf18 Jul 2026
Withdrawal Update Form 3File: Aria Phase B.pdf18 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A Aria Phase B.pdf22 Jun 2026
Withdrawal Update Form 1File: Aria Phase B Merged.pdf21 Apr 2026
Withdrawal Update Form 2File: Aria Phase B_Merged.pdf21 Apr 2026
Withdrawal Update Form 3File: Aria Phase B Merged.pdf21 Apr 2026
Disclosure of Sold and Booked InventoryFile: Aria Phase B .pdf21 Jan 2026
Form 1File: Aria Phase B (Arena Orchards) AC.pdf21 Jan 2026
Form 2File: Aria Phase B (Arena Orchards) EC.pdf21 Jan 2026
Form 3File: Aria Phase B (Arena Orchards).pdf21 Jan 2026
Form 1File: Aria Phase B (Arena Orchards) AC.pdf20 Oct 2025
Form 2File: Aria Phase B (Arena Orchards) EC.pdf20 Oct 2025
Form 3File: Aria Phase B.pdf20 Oct 2025
Disclosure of Sold and Booked InventoryFile: Kalpataru Aria Phase B.pdf20 Oct 2025
Form 5 (FY 2024-2025)File: Aria Phase B.pdf29 Sep 2025
Form 2A (FY 2024-2025)File: Aria Phase -B.pdf12 Aug 2025
Form 1File: Areana Orchards Phase B.pdf20 Jul 2025
Form 2File: Arena Orchards Row.pdf20 Jul 2025
Form 3File: Phase B.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: AriaB.pdf20 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aria B Arena Orchards AC.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aria Phase B.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aria B Arena Orchards EC.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aria B Arena Orchards AC.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Arena Orchards Phase B.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aria B Arena Orchards EC.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Aria - Phase B.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Aria B.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aria A Arena O.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aria B Arena O.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RH.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aria B Arena.pdf20 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Aria B.pdf11 Oct 2024
Disclosure of sold/ booked inventoryFile: Aria B.pdf6 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aria Phase B Arena Orchards.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aria Phase B Arena Orchards.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA phase B.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PH B ARIA.pdf20 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Aria Phase B.pdf14 Jun 2024
Disclosure of sold/ booked inventoryFile: K Aria Phase B.pdf9 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K Aria Phase B_Arena orchards.pdf6 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aria Phase B Arena Orchards_compressed.pdf6 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K Aria Phase B Arena Orchard.pdf6 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: aria phB arena orchards.pdf6 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PHASE B ARENA SEP 2023 FORM 3.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Kalpataru Aria_Phase B Arena Orchards.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Kalpataru Aria_Phase B Arena Orchads.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PH B.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: K Aria Phase B.pdf30 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aria Phase B Arena Orchards.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aria Phase B Arena Orchards.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aria Phase B Arena Orchard.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Aria B.pdf3 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: K Aria B Arena Orchard.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: K Aria B Arena Orchards.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: K Aria B.pdf12 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Letter_Survey No 59_A_1_130423.pdf24 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Letter_Survey No 59_A_3_130423.pdf24 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Letter_Survey No 59_A_4_130423.pdf24 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Letter_Survey No 59_A_9_130423.pdf24 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Letter_Survey No 59_B_19_130423.pdf24 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Letter_Survey No 59_B_27_130423.pdf24 Apr 2023
Other - TechnicalFile: CC Plan_59_A_1_upload.pdf24 Apr 2023
Other - TechnicalFile: CC Plan_59_A_3_upload.pdf24 Apr 2023
Other - TechnicalFile: CC Plan_59_A_4_upload.pdf24 Apr 2023
Other - TechnicalFile: CC Plan_59_A_9_upload.pdf24 Apr 2023
Other - TechnicalFile: CC Plan_59_B_19_upload.pdf24 Apr 2023
Other - TechnicalFile: CC Plan_59_B_27_upload.pdf24 Apr 2023
CERSAI detailsFile: CERSAI Upload.pdf21 Apr 2023
Details of encumbrances concerned to FinanceFile: EC Finance.pdf20 Apr 2023
Details of encumbrances concerned to LegalFile: EC Finance.pdf20 Apr 2023
Layout approvalFile: 59-A-2 Layout 1_upload.pdf11 Apr 2023
Building plan approvalFile: 59-A-2 Layout.pdf11 Apr 2023
Building plan approvalFile: 59-A-5 Layout.pdf11 Apr 2023
Building plan approvalFile: 59-A-6 Layout.pdf11 Apr 2023
Building plan approvalFile: 59-A-7 Layout.pdf11 Apr 2023

How this compares with Raigarh

83%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 12 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Kalpataru Aria - Phase B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Karjat5,900+ in Raigarh

2 kmKalpataru Aria - Phase BCompleted 3Lapsed / revoked 7Other 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 15 registered projects within 2 km.

Builder: Arena Orchards Private Limited

Arena Orchards Private Limited has 5 registrations on MahaRERA, including Kalpataru Aria - Phase A and Kalpataru Aria - Phase B. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Kalpataru Aria - Phase B is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Kalpataru Aria - Phase B?

The registered promoter entity is Arena Orchards Private Limited, a company as per the filing. Its CIN U01403MH2007PTC172833 and GSTIN 27AAGCA4638R2Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Kalpataru Aria - Phase B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Kalpataru Aria - Phase B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Kalpataru Aria - Phase B?

The professionals named in the filing: Architect: Jethe & Associates; Architect: Nandkumar V Jethe (Form 1 and Form 4); Engineer: Prashant Palande; Engineer: Pravin Suryawanshi (Form 2 and Form 2A); Chartered Accountant: Singhi & Co.; Chartered Accountant: C.R Mohnot & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Kalpataru Aria - Phase B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Kalpataru Aria - Phase B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Kalpataru Aria - Phase B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.