Home / Browse projects / Pune, Maharashtra / K K TATHASTU

Registered No litigation declared Others project

K K TATHASTU

By Vrunda Skyscrapers

RG-MH-31824 · RERA P52100080148 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2035Possession promisedno revision filed
2 of 110Construction stages doneacross 10 buildings; furthest along: Excavation, 0%
341 of 455Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

K K TATHASTU is a Others project by Vrunda Skyscrapers in Pune, Maharashtra, registered with MahaRERA as P52100080148 on 2 May 2025. Possession is promised by 31 Dec 2035. 114 of the 455 units on this registration are recorded sold or booked, and 2 of 110 construction stages are filed complete.

At a glance

Project

  • NameK K TATHASTU
  • TypeOthers
  • Location
    • BORHADEWADI
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • RERA no.P52100080148
  • ReraGenie IDRG-MH-31824

Builder

  • NameVrunda Skyscrapers
  • Entity typePartnership
  • PartnersSATBIR MITTAL, AMIT AGARWAL, GITESH AGARWAL, VISHAL AGARWAL, RAKESH GUPTA, VIJAY VARDHAPPA, SANJAY VARDHAPPA, SATYANARAYAN GOYAL, SHWETA GUPTA, GAURAV GUPTA

Key dates

this monthRegisteredMay 2025PromisedDec 2035

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 May 2025
  • Promised completion31 Dec 2035
  • Revised completionNone
  • Buildings10 building records
  • Documents filed64 files

Current status

25%114 of 455 units booked
4.0%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ENA51033
BUILDING FNA30000
BUILDING F1NA40000
BUILDING A WING A1NA20000
BUILDING A WING A2NA20000
BUILDING B WING B1NA20000
BUILDING B WING B2NA20000
BUILDING B WING B3NA20000
BUILDING CNA25232260226
BUILDING DNA25232260226

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building10

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 110 construction stages are filed complete across 10 buildings. The stage furthest along is Excavation, at 0%.

Building E0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING F0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING F10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING A WING A10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING A WING A20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING B WING B10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING B WING B20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING B WING B30%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING C9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING D9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1002

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,002
Closed/Covered961
Open Space41
BuildingClosed/CoveredOpen SpaceTotal
BUILDING C49110501
BUILDING D47031501

Land and ownership9

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area25,412 sq m
Land owned byThe promoter, with other names on the file
Named landowners9
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Jun 2025
LandownerVillageDistrict
Aroha Construction and Developers LLPPune (M Corp.)Pune
Kirankumar Kantilal ShahPune (M Corp.)Pune
Parvati BoratePune (M Corp.)Pune
dashrath boratePune (M Corp.)Pune
tejaswini boratePune (M Corp.)Pune
tejas boratePune (M Corp.)Pune
sunil boratePune (M Corp.)Pune
suhas boratePune (M Corp.)Pune
anita bhujbalPune (M Corp.)Pune

Approvals and building plan

Sanctioning authoritypimpri chinchwad municipal corporation
Permissible FSI37862.62
Proposed, not sanctioned37,863 sq m
Buildings approved10
Buildings sanctioned10

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD GRD AND MEZZ FLOOR SR NO 42 2 7 8 DWARKA SAI SOCIETY GODAMBE CHOWK RAHATNI PIRANGUT MAHARASHTRA 411017
Estimated costRs 145.00 cr
Cost incurredRs 5.75 cr
Work done3.97%
BuildingWingEstimatedIncurred
BUILDING CNARs 70.48 crRs 2.80 cr
BUILDING DNARs 59.72 crRs 2.37 cr
-NARs 14.50 crRs 57.52 lakh
Building ENARs 30.03 lakhRs 1.19 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArcon associates
EngineerShashikant Rajaram Patil
EngineerSANDESH ARJUN MOTE
EngineerNeelkanth Darandale
Chartered AccountantNavdeep Jindal and Associates
Chartered AccountantCA Dolly Gandhi
PartnerRole in project
Vrunda Skyscrapers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Apr 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2035

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1.pdf20 Apr 2026
Withdrawal Update Form 2File: Form-2 Mar_26.pdf20 Apr 2026
Withdrawal Update Form 3File: Form-3 Sign.pdf20 Apr 2026
Withdrawal Update Form 1File: Form-1.pdf17 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf17 Jan 2026
Withdrawal Update Form 3File: Form 3 Sign edit.pdf17 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf15 Oct 2025
Withdrawal Update Form 2File: Form - 2.pdf15 Oct 2025
Withdrawal Update Form 3File: Form - 3_Sign.pdf15 Oct 2025
Withdrawal Update Form 1File: Form 1.pdf22 Jul 2025
Withdrawal Update Form 2File: From - 2.pdf22 Jul 2025
Withdrawal Update Form 3File: From - 3_compressed.pdf22 Jul 2025
Withdrawal Update Form 1File: Form 1.pdf16 Jul 2025
Withdrawal Update Form 2File: From - 2.pdf16 Jul 2025
Withdrawal Update Form 3File: From - 3_compressed.pdf16 Jul 2025
Withdrawal Update Form 1File: Form 1.pdf15 Jul 2025
Withdrawal Update Form 2File: From - 2.pdf15 Jul 2025
Withdrawal Update Form 3File: From - 3_compressed.pdf15 Jul 2025
Other - TechnicalFile: 0 fsi declaration final.pdf30 Apr 2025
Details of encumbrances concerned to FinanceFile: tathastu financial encumbrance final.pdf29 Apr 2025
CERSAI detailsFile: cersai final.pdf29 Apr 2025
Details of encumbrances concerned to LegalFile: tathastu financial encumbrance final.pdf29 Apr 2025
Copy of the legal title reportFile: 1 Copy of the legal title report_page-0001.pdf28 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: 26 format A.pdf28 Apr 2025
Other - FinanceFile: landowner finance.pdf28 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 26 Format B.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 signed.pdf23 Apr 2025
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2.pdf11 Apr 2025
Other - TechnicalFile: 33 Annexure A_Date Change.pdf10 Apr 2025
Details of encumbrances concerned to FinanceFile: 4 Declaration Legal Encumbrance.pdf9 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 Form 1 Architects Certificate_page-Date change.pdf9 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold-Booked Inventory.pdf9 Apr 2025
Declaration about Commencement CertificateFile: 8 Tathastu Declaration of CC_Circular 32_Date Change.pdf9 Apr 2025
Details of encumbrances concerned to LegalFile: 4 Declaration Legal Encumbrance.pdf9 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 17 Disclosure in other real estate org 1_Date Change.pdf9 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 17 Disclosure in other real estate org 2_Date Change.pdf9 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 17 Disclosure in other real estate org 3_Date Change.pdf9 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: 13 Disclosure for Secured and Unsecured Finance_Date Change.pdf9 Apr 2025
Proforma of Allotment letterFile: 1 Proforma of Allotment letter.pdf6 Apr 2025
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter.pdf6 Apr 2025
Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement.pdf6 Apr 2025
Layout approvalFile: 1 Layout edited.pdf4 Mar 2025
Copy of Layout Approval (in case of layout)File: 1 Layout edited.pdf4 Mar 2025
Building plan approvalFile: 2.pdf3 Mar 2025
Building plan approvalFile: 3.pdf3 Mar 2025
Building plan approvalFile: 4.pdf3 Mar 2025
Building plan approvalFile: 5.pdf3 Mar 2025
Building plan approvalFile: 6.pdf3 Mar 2025
PAN CardFile: 1 Vrunda Skyscrapers - PAN CARD.pdf3 Mar 2025
Copy of the legal title reportFile: 1 Copy of the legal title report1.pdf3 Mar 2025
Copy of the legal title reportFile: 1 Copy of the legal title report6.pdf3 Mar 2025
Copy of the legal title reportFile: 1 Copy of the legal title report5.pdf3 Mar 2025
Copy of the legal title reportFile: 1 Copy of the legal title report4.pdf3 Mar 2025
Copy of the legal title reportFile: 1 Copy of the legal title report3.pdf3 Mar 2025
Copy of the legal title reportFile: 1 Copy of the legal title report2.pdf3 Mar 2025
Declaration in FORM BFile: 9 tathastu Promoter Declaration_FORM B.pdf3 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: 7 Tatavstu _CC.pdf3 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf3 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf3 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf3 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf3 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf3 Mar 2025
Other - LegalFile: PARTNERSHIP DEED VRUNDA SKYSCRSPERS_compressed.pdf3 Mar 2025

How this compares with Pune

25%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep K K TATHASTU on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BORHADEWADI13,700+ in Pune

Builder: Vrunda Skyscrapers

Vrunda Skyscrapers has 1 registration on MahaRERA, including K K TATHASTU. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if K K TATHASTU is delayed beyond 31 Dec 2035?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of K K TATHASTU?

The registered promoter entity is Vrunda Skyscrapers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in K K TATHASTU?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for K K TATHASTU?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at K K TATHASTU?

The professionals named in the filing: Architect: Arcon associates; Engineer: Shashikant Rajaram Patil; Engineer: SANDESH ARJUN MOTE; Engineer: Neelkanth Darandale; Chartered Accountant: Navdeep Jindal and Associates; Chartered Accountant: CA Dolly Gandhi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in K K TATHASTU?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About K K TATHASTU. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save K K TATHASTU to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.