Home / Browse projects / Bengaluru Rural, Karnataka / Juniper at Brigade Orchards

Registration approved Residential/Group Housing project

Juniper at Brigade Orchards

By BCV Developers Pvt Ltd

RG-KA-11179 · RERA PRM/KA/RERA/1250/303/PR/170916/000462

Source: official RERA Karnataka filing

Red flags

  • 10 complaints at RERA Karnataka

Clear

  • Completion date never moved
  • Separate project account declared
Dec 2019Possession promisedno revision filed
10Complaints at RERA Karnatakaon this registration
Jump to the 51 documents Report an error

Juniper at Brigade Orchards is a Residential/Group Housing project by BCV Developers Pvt Ltd in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/303/PR/170916/000462 on 16 Sep 2017. Possession is promised by 31 Dec 2019. 10 complaints are on record with the regulator.

At a glance

Project

  • NameJuniper at Brigade Orchards
  • TypeResidential/Group Housing
  • Location
    • Devanahalli
    • Bengaluru Rural
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1250/303/PR/170916/000462
  • ReraGenie IDRG-KA-11179

Builder

  • NameBCV Developers Pvt Ltd
  • Entity typeCompany
  • CINU45201KA2008PTC045861
  • Authorized SignatoryViswa Prathap Desu
  • OthersSunil Lakkundi, Harmeet Singh Rai, Srinivasa Murthy B S, Shubha N S
  • Other registrations9 more →
  • Declared earlier projects9 →

Key dates

this monthRegisteredSep 2017PromisedDec 2019

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on16 Sep 2017
  • Promised completion31 Dec 2019
  • Revised completionNone
  • Buildings6 building records
  • Documents filed51 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---35035
B---1050105
C---1170117
D---60060
E---59059
F---1170117

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etcNot applicable
Plastering inside , outside & CeilingNot applicable
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area21,508 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 24.90 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectStudio30 Architects & Planners
EngineerMelior Structural Solutions (P) ltd

Complaints filed with RERA Karnataka10

Case no.ComplainantRespondentFiled
CMP/201113/0007055-BCV Developers Pvt Ltd13/11/2020
CMP/210120/0007451-BCV Developers Pvt Ltd20/01/2021
CMP/210308/0007763-BCV Developers Pvt Ltd08/03/2021
CMP/220524/0009514-BCV Developers Pvt Ltd24/05/2022
00899/2023-BCV Developers Pvt Ltd05/06/2023
01327/2023-BCV Developers Pvt Ltd02/09/2023
01753/2023-BCV Developers Pvt Ltd24/11/2023
00118/2024-BCV Developers Pvt Ltd24/01/2024
00337/2025-BCV Developers Pvt Ltd20/02/2025
00455/2025-BCV Developers Pvt Ltd11/03/2025

Documents filed51

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/303/PR/170916/000462 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Registration Certificate_BCV_CTC.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Architect Certificate for work completed.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engineer certificate for completed work - Juniper.pdf-
CA Certificate for Funds UtilizationFile: CA Certificate - Funds Utilised.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Architect Certificate for pending work.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engineer certificate for pending works - Juniper.pdf-
CA Certificate for Funds required for Project CompletionFile: CA Certificate - Funds Required.pdf-
AffidavitFile: Affdavit for Extension - Juniper.pdf-
Latest Encumbrance CertificateFile: Juniper - EC.pdf-
Details Of Sold/ Un-sold UnitsFile: sold unsold details.pdf-
NOC DetailsFile: Brigade Juniper -CFE Corrigendum Validity Extension.pdf-
Plan Sanction and Commecement Certificate_Juniper_CTC-
Site Plan_Juniper_CTC-
Development Plan_Juiper_CTC-
Awaiting sale deed draft from RERA-
Awaiting draft agreements from RERA-
Title Opinion_Juniper_CTC-
Section Plan_Juniper_CTC-
Development Plan_Juiper_CTC-
Juniper - Allotment Notice-
Juniper Brochure for web-
All NOC_Juiper_CTC1-
Juniper specifications-
EC_Juiper_CTC-
Khatha-
Joint Venture Agreement-
Balance Sheet 2015 - 2016File: Balance Sheet - 2016-17.pdf-
Balance Sheet 2014 - 2015File: Balance Sheet - 2015-16.pdf-
Balance Sheet 2013 - 2014File: Balance Sheet - 2014-15.pdf-
Audited Profit and Loss Statement 2015 - 2016File: P&L - 2016-17.pdf-
Audited Profit and Loss Statement 2014 - 2015File: P&L - 2015-16.pdf-
Audited Profit and Loss Statement 2013 - 2014File: P&L - 2014-15.pdf-
Director's Report 2015 - 2016File: Directors' Report - 2015-16.pdf-
Director's Report 2014 - 2015File: Directors' Report - 2014-15.pdf-
Director's Report 2013 - 2014File: Directors' Report - 2013-14.pdf-
Cash Flow Statement 2015 - 2016File: Cash Flow Statement- 2016-17.pdf-
Cash Flow Statement 2014 - 2015File: Cash Flow Statement - 2015-16.pdf-
Auditor's Report 2015 - 2016File: Independant Auditors Report-2016-17.pdf-
Auditor's Report 2014 - 2015File: Independant Auditors Report- 2015-16.pdf-
Auditor's Report 2013 - 2014File: Independant Auditors Report- 2014-15.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR FY 2015-16.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: ITR FY 2014-15.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: ITR FY 2013-14.pdf-
Form B - Juniper at Orchards-
Prospectus/BrochureFile: Juniper A4 brochure v4.pdf-
Advertisement Copy 1File: Classified ad-01.jpg-
Tower Excel SheetFile: PRM_KA_RERA_1250_303_PR_170916_000462.xlsx-
Occupancy CertificateFile: Juniper @ Brigade Orchards - Occupancy Certificate.pdf-
Completion certificateFile: Juniper @ Brigade Orchards - Occupancy Certificate.pdf-
Registered Agreement of SaleFile: Sale Agreement- Juniper.pdf-
Registered conveyance deed for an individual unitFile: Sale Deed.pdf-

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
Villas at Brigade Orchards-Completed-No date filed
Parkside at Brigade Orchards-Completed-No date filed
Deodar at Brigade Orchards-Completed-No date filed
Cedar at Brigade Orchards-Completed-No date filed
Banyan at Brigade Orchards-Completed-No date filed
Aspen at Brigade Orchards-Completed-No date filed

How this compares with Bengaluru Rural

20%of Bengaluru Rural projects moved their completion datethis one has not
0%of Bengaluru Rural registrations are shown as withdrawn or revokedthis one is not

Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.

Keep Juniper at Brigade Orchards on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Rural650+ in Bengaluru Rural

Builder: BCV Developers Pvt Ltd

BCV Developers Pvt Ltd has 10 registrations on RERA Karnataka, including Laurel & Maple at Brigade Orchards and IVORY PHASE 2 AT BRIGADE ORCHARDS. Its filings declare 9 earlier projects, 6 of them declared completed. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Bengaluru Rural district page.

Frequently asked questions

What are my rights if Juniper at Brigade Orchards is delayed beyond 31 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Juniper at Brigade Orchards?

The registered promoter entity is BCV Developers Pvt Ltd, a company as per the filing. Its CIN U45201KA2008PTC045861 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Juniper at Brigade Orchards?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Juniper at Brigade Orchards?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Juniper at Brigade Orchards?

The professionals named in the filing: Architect: Studio30 Architects & Planners; Engineer: Melior Structural Solutions (P) ltd. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Juniper at Brigade Orchards?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Juniper at Brigade Orchards. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Juniper at Brigade Orchards to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.