ReraGenieLog inGet a buyer report

Home / Browse projects / Amravati, Maharashtra / JIJAH PROSPERA

Registered No litigation declared Mixed project

JIJAH PROSPERA

By DIGVIJAY SURENDRA DESHMUKH

RG-MH-57922 · RERA P50300050216 · Last updated on MahaRERA portal: 3 Jan 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Amravati registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedno revision filed
10 of 11Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 39 documents Report an error

JIJAH PROSPERA is a Mixed project by DIGVIJAY SURENDRA DESHMUKH in Amravati, Maharashtra, registered with MahaRERA as P50300050216 on 27 Mar 2023. Possession is promised by 31 Mar 2028.

At a glance

Project

  • NameJIJAH PROSPERA
  • TypeMixed
  • Location
    • BADNERA ROAD
    • AKOLI
    • Amravati (M Corp.)
    • Amravati
    • 444607
  • Pincode444607
  • RERA no.P50300050216
  • ReraGenie IDRG-MH-57922

Builder

  • NameDIGVIJAY SURENDRA DESHMUKH
  • Entity typeIndividual

Key dates

this monthRegisteredMar 2023PromisedMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Mar 2023
  • Promised completion31 Mar 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed39 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
JIJAH PROSPERANA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 3 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

JIJAH PROSPERA91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 3 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed56

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots56
Closed/Covered56

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area632 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
DIGVIJAY SURENDRA DESHMUKHAmravati (M Corp.)Amravati

Approvals and building plan

Permissible FSI2517.13
Proposed, not sanctioned2,517 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJAISTAMBH COWK AMRAVATI

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHUBHAM MUNDHADA
EngineerSANTOSH GUPTA
Chartered AccountantSHRENIK BOTHRA
Chartered AccountantG S KALANTRI AND CO
PartnerRole in project
DIGVIJAY SURENDRA DESHMUKH-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2028

Documents filed39

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC 311223.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC 310324.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC 300624.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC 300924.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC 311223.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC 310324.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC 300624.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC 300924.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certi-Jun-23 (1).pdf23 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certi-Sep-23.pdf23 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG 3006.pdf23 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG 3009.pdf23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 3006.pdf23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 3009.pdf23 Feb 2024
CERSAI detailsFile: DECLARATION REGARDING SECURITY INTEREST OR MORTGAGE.pdf17 Mar 2023
Other - FinanceFile: REVISED FORM3_compressed.pdf17 Mar 2023
CERSAI detailsFile: CERSAI_Search_Report_200263166658_For_Asset_Based_Search_16_03_2023_15_51_58_209.pdf16 Mar 2023
Layout approvalFile: map (1).pdf14 Mar 2023
Building plan approval or NA orderFile: map (1).pdf14 Mar 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCES TO FINANCE.pdf14 Mar 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCES CONCERNED TO LEGAL.pdf14 Mar 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCES TO FINANCE.pdf14 Mar 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCES CONCERNED TO LEGAL.pdf14 Mar 2023
Copy of Layout Approval (in case of layout)File: map (1).pdf14 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: map (1).pdf14 Mar 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf14 Mar 2023
Declaration in FORM BFile: FORM B_compressed.pdf14 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE_compressed.pdf14 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf14 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: REVISED FORM3_compressed.pdf14 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST IN OTHER REAL ESTATE ORGANIZATION.pdf14 Mar 2023
Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf14 Mar 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf14 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION ABOUT SEPARATE BANK ACCOUNT.pdf14 Mar 2023
Deviation Report with respect to Allotment letterFile: DEVIATION TO ALLOTMENT LETTER.pdf14 Mar 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION TO AGREEMENT TO SELL.pdf14 Mar 2023
PAN CardFile: PAN CARD.pdf9 Mar 2023
Copy of the legal title reportFile: TITLE CERTIFICATE.pdf9 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf9 Mar 2023

How this compares with Amravati

8%of Amravati projects moved their completion datethis one has not
33%of Amravati registrations have lapsed or been cancelledthis one is on the register

Computed across the 450+ Amravati projects on ReraGenie, from their own filings.

Keep JIJAH PROSPERA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AKOLI450+ in Amravati

Builder: DIGVIJAY SURENDRA DESHMUKH

DIGVIJAY SURENDRA DESHMUKH has 1 registration on MahaRERA, including JIJAH PROSPERA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Amravati district page.

Frequently asked questions

What are my rights if JIJAH PROSPERA is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JIJAH PROSPERA?

The registered promoter entity is DIGVIJAY SURENDRA DESHMUKH, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JIJAH PROSPERA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JIJAH PROSPERA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JIJAH PROSPERA?

The professionals named in the filing: Architect: SHUBHAM MUNDHADA; Engineer: SANTOSH GUPTA; Chartered Accountant: SHRENIK BOTHRA; Chartered Accountant: G S KALANTRI AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JIJAH PROSPERA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JIJAH PROSPERA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JIJAH PROSPERA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.