ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / Jigyasa Nagari

Registered No litigation declared Plotted project

Jigyasa Nagari

By Prashant Thombare and Vishal Thombre

RG-MH-66612 · RERA P50500054343 · Last updated on MahaRERA portal: 18 Dec 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
14 of 54Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

Jigyasa Nagari is a Plotted project by Prashant Thombare and Vishal Thombre in Nagpur, Maharashtra, registered with MahaRERA as P50500054343 on 15 Jan 2024. Possession is promised by 31 Dec 2026. 40 of the 54 units on this registration are recorded sold or booked.

At a glance

Project

  • NameJigyasa Nagari
  • TypePlotted
  • Location
    • Kh No 105/1
    • P.H.No. 66
    • Mouza - Vasantnagar
    • Tah. - Katol
    • Distt - Nagpur
    • Vasantnagar
    • Katol
    • Vasantnagar
    • Katol
    • Nagpur
    • 445203
  • Pincode445203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500054343
  • ReraGenie IDRG-MH-66612

Builder

  • NamePrashant Thombare and Vishal Thombre
  • Entity typeOthers
  • Named personsPrashant G Thombare, Vishal G Thombre

Key dates

this monthRegisteredJan 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Jan 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed84 files

Current status

74%40 of 54 units booked
48.1%Work done, per cost certificate

Figures as on 18 Dec 2025, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 18 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes90%
Street LightingYes90%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes90%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,830 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Jul 2025

Approvals and building plan

Sanctioning authorityPrashant Thombare and Vishal Thombre

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKDK College Road
Estimated costRs 1.63 cr
Cost incurredRs 78.30 lakh
Work done48.12%
BuildingWingEstimatedIncurred
-NARs 1.63 crRs 78.30 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMahendra Khambalkar
EngineerMahendra Khambalkar
Chartered AccountantRishi Lashkare
Chartered AccountantCA Ravindra Lashkare
PartnerRole in project
Prashant Thombare and Vishal Thombre-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Jigyasa Nagari - Form 1 - September 2025.pdf18 Dec 2025
Withdrawal Update Form 2File: Jigyasa Nagri - Form 2 - September 2025.pdf18 Dec 2025
Withdrawal Update Form 3File: Jigyasa Nagari - Form 3 - September 2025.pdf18 Dec 2025
Form 2A (FY 2023-2024)File: Jigyasa Nagri - Form 2A - 2024.pdf18 Dec 2025
Form 2A (FY 2024-2025)File: Jigyasa Nagri - Form 2A - 2024-2025.pdf18 Dec 2025
Form 5 (FY 2023-2024)File: Jigyasa Nagri - Form 5 - 2024.pdf22 Nov 2025
Form 5 (FY 2024-2025)File: Jigyasa Nagri - Form 5 - 2024-2025.pdf22 Nov 2025
Withdrawal Update Form 1File: Jigyasa Nagri - Form 1 - June 2025.pdf12 Sep 2025
Withdrawal Update Form 2File: Jigyasa Nagri - Form 2 - June 2025.pdf12 Sep 2025
Withdrawal Update Form 3File: Jigyasa Nagri - Form 3 - June 2025.pdf12 Sep 2025
Form 1File: Architect Certificate - March 2024 (2).pdf11 Jul 2025
Form 2File: Engineer Certificate - March 2024 (2).pdf11 Jul 2025
Form 3File: CA Certificate - March 2024 (2)_compressed (3).pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold - March 2024 (2).pdf11 Jul 2025
Form 1File: Jigyasa Nagari - Form 1 - June 2024.pdf11 Jul 2025
Form 2File: Form 2 - June 2024.pdf11 Jul 2025
Form 3File: Jigyasa Nagari - Form 3 - June 2024.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - June 2024.pdf11 Jul 2025
Form 1File: Form 1 - September 2024.pdf11 Jul 2025
Form 2File: Form 2 - September 2024.pdf11 Jul 2025
Form 3File: Form 3 - September 2024.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - September 2024.pdf11 Jul 2025
Form 1File: Jigyasa Nagari - Form 1 - December 2024.pdf11 Jul 2025
Form 2File: Jigyasa Nagari - Form 2 - December 2024.pdf11 Jul 2025
Form 3File: Jigyasa Nagari - Form 3 - December 2024.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: Jigyasa Nagari - Disclosure - December 2024.pdf11 Jul 2025
Form 1File: Form 1 - Jigyasa Nagari.pdf11 Jul 2025
Form 2File: Form 2 - Jigyasa Nagari.pdf11 Jul 2025
Form 3File: Form 3 - Jigyasa Nagari.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - Jigyasa Nagari.pdf11 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Jigyasa Nagari.pdf30 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Jigyasa Nagari_compressed.pdf30 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Jigyasa Nagari.pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure - Jigyasa Nagari.pdf30 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Jigyasa Nagari - Form 1 - December 2024.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jigyasa Nagari - Form 3 - December 2024_compressed.pdf22 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Jigyasa Nagari - Form 2 - December 2024.pdf22 Apr 2025
Disclosure of sold/ booked inventoryFile: Jigyasa Nagari - Disclosure - December 2024.pdf22 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Jigyasa Nagari - Form 1 - June 2024.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - September 2024.pdf26 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jigyasa Nagari - Form 3 - June 2024_compressed.pdf26 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - September 2024_compressed (1).pdf26 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - June 2024.pdf26 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - September 2024.pdf26 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure - June 2024.pdf26 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure - September 2024.pdf26 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Jigyasa Nagri - 2023-24.pdf17 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - March 2024 (2).pdf29 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - March 2024 (2).pdf29 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold - March 2024 (2).pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - March 2024 (2)_compressed (3).pdf29 Apr 2024
Other - TechnicalFile: Verification of CC.pdf7 Jan 2024
Copy of the legal title reportFile: Jigyasa Nagri Legal Title Report.pdf30 Aug 2023
Other - TechnicalFile: Calirifcation of the Query - 30-08-2023.pdf30 Aug 2023
Copy of the legal title reportFile: Clarification of Query Jigyasa Nagari.pdf24 Aug 2023
Copy of the legal title reportFile: Jigyasa Nagri Sale Deed Copy.pdf24 Aug 2023
Other - TechnicalFile: Jigyasa Nagri Sale Deed Copy.pdf24 Aug 2023
Other - TechnicalFile: Clarification of Query Jigyasa Nagari.pdf24 Aug 2023
Details of encumbrances concerned to FinanceFile: Encumbrance - Finance Jigyasa Nagri.pdf11 Aug 2023
Details of encumbrances concerned to FinanceFile: Encumbrance - Legal Jigyasa Nagri.pdf11 Aug 2023
Details of encumbrances concerned to LegalFile: Encumbrance - Finance Jigyasa Nagri.pdf11 Aug 2023
Details of encumbrances concerned to LegalFile: Encumbrance - Legal Jigyasa Nagri.pdf11 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Seperate Bank Account Details.pdf11 Aug 2023
Layout approvalFile: Sanction Map Jigyasa Nagri.pdf3 Aug 2023
Copy of Layout Approval (in case of layout)File: Sanction Map Jigyasa Nagri.pdf3 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA CErtificate Jigyasa Nagri.pdf3 Aug 2023
Building plan approval or NA orderFile: NA ORder.pdf26 Jul 2023
PAN CardFile: PAN Prashant Thombare.pdf26 Jul 2023
PAN CardFile: PAN Vishal Thombare.pdf26 Jul 2023
PAN CardFile: Declaration for PAN.pdf26 Jul 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate - Legal.pdf26 Jul 2023
Details of encumbrances concerned to LegalFile: Encumbrance Certificate - Legal.pdf26 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: NA ORder.pdf26 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: NA ORder.pdf26 Jul 2023
Declaration about Commencement CertificateFile: Format D Declaration of CC.pdf26 Jul 2023
Declaration in FORM BFile: Form B.pdf26 Jul 2023
CERSAI detailsFile: CERSAI.pdf26 Jul 2023
CERSAI detailsFile: Self Declaration of CERSAI.pdf26 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annex A - Declaration of Interest in Other Organisation - Prashant Thombre.pdf26 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annex A - Declaration of Interest in Other Organisation - Vishal Thombre.pdf26 Jul 2023

How this compares with Nagpur

74%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Jigyasa Nagari on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vasantnagar, Katol2,800+ in Nagpur

Builder: Prashant Thombare and Vishal Thombre

Prashant Thombare and Vishal Thombre has 1 registration on MahaRERA, including Jigyasa Nagari. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Jigyasa Nagari is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Jigyasa Nagari?

The registered promoter entity is Prashant Thombare and Vishal Thombre, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Jigyasa Nagari?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Jigyasa Nagari?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Jigyasa Nagari?

The professionals named in the filing: Architect: Mahendra Khambalkar; Engineer: Mahendra Khambalkar; Chartered Accountant: Rishi Lashkare; Chartered Accountant: CA Ravindra Lashkare. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Jigyasa Nagari?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Jigyasa Nagari. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Jigyasa Nagari to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.