JEEVAN SHOBHA CHSL AND BHANSALI CHSL

By HIRANI REALTORS LLP

RG-MH-93440 · RERA P51800047979 · Last updated on MahaRERA portal: 5 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 22.00 crore secured on the land, in favour of STATE BANK OF INDIA

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2026Possession promisedregistration recorded completed
18 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 0%
93 of 159Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 130 documents Report an error

JEEVAN SHOBHA CHSL AND BHANSALI CHSL is a Residential / Group Housing project by HIRANI REALTORS LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800047979 on 2 Dec 2022. The registration is recorded completed; possession was promised by 31 Mar 2026. 66 of the 159 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.

At a glance

Project

  • NameJEEVAN SHOBHA CHSL AND BHANSALI CHSL
  • TypeResidential / Group Housing
  • Location
    • JAIN MANDIR CROSS ROAD
    • BORIVALI EAST
    • Borivali
    • Mumbai Suburban
    • 400066
  • Pincode400066
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800047979
  • ReraGenie IDRG-MH-93440

Builder

  • NameHIRANI REALTORS LLP
  • Entity typePartnership
  • GSTIN27AANFH1852J1Z3
  • PartnersARVIND GAJRAJ HIRANI, HARDIK HASMUKH HIRANI, HITEN ARVIND HIRANI

Key dates

this monthRegisteredDec 2022PromisedMar 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on2 Dec 2022
  • Promised completion31 Mar 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed130 files

Current status

42%66 of 159 units booked
99.6%Work done, per cost certificate

Figures as on 5 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
JEEVAN SHOBHA CHSL AND BHANSALI CHSL WING ANA242375277
JEEVAN SHOBHA CHSL AND BHANSALI CHSL WING BNA242282082

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 5 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 0%.

JEEVAN SHOBHA CHSL AND BHANSALI CHSL WING A82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
JEEVAN SHOBHA CHSL AND BHANSALI CHSL WING B82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed167

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots167
Closed/Covered167
BuildingClosed/CoveredTotal
JEEVAN SHOBHA CHSL AND BHANSALI CHSL WING A8181
JEEVAN SHOBHA CHSL AND BHANSALI CHSL WING B8686

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,250 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofSTATE BANK OF INDIA
Secured amountRs 22.00 crore
Declared on23 Sep 2024

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI11450.58
Proposed, not sanctioned11,449 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchP B nP 1 THANE
Estimated costRs 50.00 cr
Cost incurredRs 49.80 cr
Work done99.6%
BuildingWingEstimatedIncurred
JEEVAN SHOBHA CHSL AND BHANSALI CHSL WING ANARs 24.75 crRs 24.75 cr
JEEVAN SHOBHA CHSL AND BHANSALI CHSL WING BNARs 24.75 crRs 24.75 cr
-NARs 50.00 lakhRs 30.00 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSARC
EngineerJUGAL JAIN
Chartered AccountantSHRADHA VATSAL SHAH
Chartered AccountantPOONAM MURARKA
PartnerRole in project
HIRANI REALTORS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Mar 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Mar 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed130

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 130 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2022-2023)File: Form 2A 2023.pdf5 May 2026
Form 2A (FY 2023-2024)File: Form 2A 2024.pdf5 May 2026
Form 2A (FY 2024-2025)File: Form 2A 2025.pdf5 May 2026
Form 2A (FY 2025-2026)File: Form 2A 2026.pdf5 May 2026
Form 5 (FY 2023-2024)File: CLARIFICATION AND FORM 5-2023-2024.pdf5 May 2026
Withdrawal Update Form 1File: Architect Certificate.pdf29 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf29 Apr 2026
Withdrawal Update Form 3File: CA Certificate.pdf29 Apr 2026
Form 5 (FY 2022-2023)File: CLARIFICATION AND FORM 5-2022-2023.pdf15 Apr 2026
Layout approvalFile: OC plan-1-2.pdf24 Mar 2026
Building plan approvalFile: OC plan-1-2.pdf24 Mar 2026
Building plan approvalFile: OC plan-3-3.pdf24 Mar 2026
Building plan approvalFile: OC plan-4-8.pdf24 Mar 2026
Building plan approvalFile: OC plan-9-12.pdf24 Mar 2026
Withdrawal Update Form 1File: JS and BH Final Form 1 Sign.pdf22 Jan 2026
Withdrawal Update Form 2File: JS and BH Final Form 2 sign.pdf22 Jan 2026
Withdrawal Update Form 3File: JS and BH Final Form 3 sign.pdf22 Jan 2026
Withdrawal Update Form 1File: form 1 18-10-2025.pdf18 Oct 2025
Withdrawal Update Form 1File: form 1 18-10-2025.pdf18 Oct 2025
Withdrawal Update Form 1File: form 1 18-10-2025.pdf18 Oct 2025
Withdrawal Update Form 1File: form 1 18-10-2025.pdf18 Oct 2025
Withdrawal Update Form 1File: form 1 18-10-2025.pdf18 Oct 2025
Withdrawal Update Form 2File: Form 2 17-10-2025.pdf18 Oct 2025
Withdrawal Update Form 2File: Form 2 17-10-2025.pdf18 Oct 2025
Withdrawal Update Form 2File: Form 2 17-10-2025.pdf18 Oct 2025
Withdrawal Update Form 2File: Form 2 17-10-2025.pdf18 Oct 2025
Withdrawal Update Form 2File: Form 2 17-10-2025.pdf18 Oct 2025
Withdrawal Update Form 3File: Form 3 18-10-2025.pdf18 Oct 2025
Withdrawal Update Form 3File: Form 3 18-10-2025.pdf18 Oct 2025
Withdrawal Update Form 3File: Form 3 18-10-2025.pdf18 Oct 2025
Withdrawal Update Form 3File: Form 3 18-10-2025.pdf18 Oct 2025
Withdrawal Update Form 3File: Form 3 18-10-2025.pdf18 Oct 2025
Form 1File: ARCHITECT CERTIFICATE.pdf30 Aug 2025
Form 2File: ENGINEERS CERTIFICATE.pdf30 Aug 2025
Form 3File: CA CERTIFICATE.pdf30 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD 31-12-2024.pdf30 Aug 2025
Form 1File: ARCHITECT CERTIFICATE 30062024.pdf30 Aug 2025
Form 2File: ENGINEER CERTIFICATE 30062024.pdf30 Aug 2025
Form 3File: CA CERTIFICATE AS ON 30-06-2024_JEEVAN SHOBHA & BHANSALI CHSL.pdf30 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD 30062024.pdf30 Aug 2025
Form 5 (FY 2024-2025)File: Hirani realtors LLP Form 5 JS & BH.pdf30 Jul 2025
Form 1File: ARCHITECT CERTIFICATE.pdf27 May 2025
Form 2File: Form 2 Engineer Certificate JS & BH.pdf27 May 2025
Form 3File: CA CERTIFICATE 31032025_compressed (1).pdf27 May 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 31-03-2025.pdf27 May 2025
OthersFile: QUALITY ASSURANCE FY 24-25.pdf27 May 2025
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE.pdf27 May 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate JS u0026 BH.pdf27 May 2025
Withdrawal Update Form 3File: CA CERTIFICATE 31032025_compressed (1).pdf27 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 31032025_compressed (1).pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 31-03-2025.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD 31-12-2024.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE AS ON 30092024.pdf28 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED 30062023_compressed.pdf28 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE SOLD BOOKED 31032023.pdf28 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE SOLD BOOKED 31122023_compressed.pdf28 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOUSRE SOLD BOOKED 30092023_compressed.pdf28 Nov 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 30-09-2024_compressed.pdf28 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hirani Realtors_Jeevan Shobha Quality Assurance Certirficate_31-03-2024[1].pdf28 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5-2023-2024.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE AS ON 30-09-2024.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD Disclouser.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE AS ON 30-06-2024.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 30062024.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 30062024.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD 30062024.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY.pdf22 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Hirani Jeevan Shobha_Quality Assurance Certificate.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf11 May 2024
Building plan approvalFile: AMENDED PLANS_compressed-1-6.pdf6 May 2024
Building plan approvalFile: AMENDED PLANS_compressed-7-11 (1).pdf6 May 2024
Building Plan Approval / NA Order for plotted developmentFile: AMENDED PLANS_compressed-1-6.pdf6 May 2024
Building Plan Approval / NA Order for plotted developmentFile: AMENDED PLANS_compressed-7-11 (1).pdf6 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf6 May 2024

How this compares with Mumbai Suburban

42%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JEEVAN SHOBHA CHSL AND BHANSALI CHSL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BORIVALI EAST6,700+ in Mumbai Suburban

2 kmJEEVAN SHOBHA CHSL AND BCompleted 165Lapsed / revoked 99Other 230Dot size: filed unitsN

Filed coordinates, straight-line distance. 494 registered projects within 2 km.

Builder: HIRANI REALTORS LLP

HIRANI REALTORS LLP has 1 registration on MahaRERA, including JEEVAN SHOBHA CHSL AND BHANSALI CHSL. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if JEEVAN SHOBHA CHSL AND BHANSALI CHSL is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JEEVAN SHOBHA CHSL AND BHANSALI CHSL?

The registered promoter entity is HIRANI REALTORS LLP, a partnership as per the filing. Its GSTIN 27AANFH1852J1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JEEVAN SHOBHA CHSL AND BHANSALI CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JEEVAN SHOBHA CHSL AND BHANSALI CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JEEVAN SHOBHA CHSL AND BHANSALI CHSL?

The professionals named in the filing: Architect: SARC; Engineer: JUGAL JAIN; Chartered Accountant: SHRADHA VATSAL SHAH; Chartered Accountant: POONAM MURARKA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JEEVAN SHOBHA CHSL AND BHANSALI CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JEEVAN SHOBHA CHSL AND BHANSALI CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JEEVAN SHOBHA CHSL AND BHANSALI CHSL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.