ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / JAYHIND HILLSIDE

Completed No litigation declared Others project

JAYHIND HILLSIDE

By SAGAR JAYSING ERANDE

RG-MH-14559 · RERA P52100022761 · Last updated on MahaRERA portal: 27 Dec 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2024Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Installation of Lifts, 95%
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

JAYHIND HILLSIDE is a Others project by SAGAR JAYSING ERANDE in Pune, Maharashtra, registered with MahaRERA as P52100022761 on 16 Oct 2019. The registration is recorded completed; possession was promised by 30 Mar 2024.

At a glance

Project

  • NameJAYHIND HILLSIDE
  • TypeOthers
  • Location
    • ALANDI MOSHI ROAD
    • DUDULGAON
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100022761
  • ReraGenie IDRG-MH-14559

Builder

  • NameSAGAR JAYSING ERANDE
  • Entity typeIndividual
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredOct 2019PromisedMar 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on16 Oct 2019
  • Promised completion30 Mar 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed71 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
JAYHIND HILLSIDENA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 95%.

JAYHIND HILLSIDE: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 27 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes60%
Street LightingYes95%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes95%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,750 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
SANTOSH NAMDEV VAHILECHARHOLIPune
Santosh VahileCHARHOLIPune

Approvals and building plan

Permissible FSI4793.53
Proposed, not sanctioned4,794 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD SR NO 90 LAKSHADEEP P ALACE SHOP NO 1 PIMPLE SAUDAGAR AUNDH CAMP PUNE MAHARASHTRA 411

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANJALI ARBAT AND ASSOCIATES
EngineerDELTACOM STRUCTAL CONSULTANTS
Chartered AccountantPGMJ AND ASSOCIATES
PartnerRole in project
SAGAR JAYSING ERANDE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Nov 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Nov 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Nov 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Jul 2023

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf27 Dec 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: soc reg certi Jayhind hillside.pdf27 Dec 2024
Status of ConveyanceFile: Con deed jayhindhillside-3.pdf27 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Final.pdf19 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 2021-22 Final.pdf1 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Final form 5 FY 22-23.pdf1 Feb 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Complition Jaihind Group.pdf19 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Final.pdf2 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Final.pdf2 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 fINAL.pdf2 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final Signed UPLOAD.pdf2 Jun 2023
Disclosure of sold/ booked inventoryFile: Sold Circular 29.pdf18 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch cert sept 2022.pdf27 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2_FY 2022-23-Jayhind.pdf27 Oct 2022
Disclosure of sold/ booked inventoryFile: Sold and Booked Inventory.pdf27 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_CA Certified.pdf27 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Upload.pdf20 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Q1.pdf20 Jul 2022
Disclosure of sold/ booked inventoryFile: Sold Circular 29.pdf20 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Signed.pdf16 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf4 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5.pdf30 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_compressed.pdf19 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q2 2122.pdf19 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2 Q2 2122.pdf19 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_compressed.pdf19 Nov 2021
Disclosure of sold/ booked inventoryFile: circular 29.pdf19 Nov 2021
Layout approvalFile: Layout Plan.pdf17 Nov 2021
Building plan approvalFile: Sanction page 2.pdf17 Nov 2021
Building plan approvalFile: Sanction page 3.pdf17 Nov 2021
Building plan approvalFile: Sanction page 4.pdf17 Nov 2021
Building plan approvalFile: Sanction page 5.pdf17 Nov 2021
Building plan approvalFile: Sanction page 6.pdf17 Nov 2021
Copy of the legal title reportFile: title report final.pdf17 Nov 2021
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf17 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: Sanction page 2.pdf17 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: Sanction page 3.pdf17 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: Sanction page 4.pdf17 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: Sanction page 5.pdf17 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: Sanction page 6.pdf17 Nov 2021
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf17 Nov 2021
Declaration about Commencement CertificateFile: circular 32.pdf17 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 - Jayhind Hillside 1920.pdf27 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Signed.pdf27 Oct 2021
Declaration about Commencement CertificateFile: Circular 32.pdf4 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: From 2 A 2020.pdf4 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: From 2 A 2021.pdf4 Aug 2021
Disclosure of sold/ booked inventoryFile: Circular 29.pdf4 Aug 2021
Layout approvalFile: Layout Approval.pdf21 Jul 2021
Copy of Layout Approval (in case of layout)File: Layout Approval.pdf21 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: CC_rotated.pdf21 Jul 2021
Layout approvalFile: ilovepdf_merged_compressed-1-2.pdf14 Oct 2020
Layout approvalFile: ilovepdf_merged_compressed-3-5.pdf14 Oct 2020
Copy of Layout Approval (in case of layout)File: ilovepdf_merged_compressed-1-2.pdf14 Oct 2020
Copy of Layout Approval (in case of layout)File: ilovepdf_merged_compressed-3-5.pdf14 Oct 2020
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf14 Oct 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf9 Oct 2019
Layout approvalFile: LAYOUT.pdf7 Oct 2019
Building plan approvalFile: BUILDING.pdf7 Oct 2019
Building plan approvalFile: BUILDING 1.pdf7 Oct 2019
Building plan approvalFile: BUILDING 2.pdf7 Oct 2019
PAN CardFile: PAN CARD.pdf7 Oct 2019
Copy of the legal title reportFile: SEARCH TITLE.pdf7 Oct 2019
Details of encumbrancesFile: ENCUMBRANCE.pdf7 Oct 2019
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf7 Oct 2019
Building Plan Approval / NA Order for plotted developmentFile: BUILDING.pdf7 Oct 2019
Building Plan Approval / NA Order for plotted developmentFile: BUILDING 1.pdf7 Oct 2019
Building Plan Approval / NA Order for plotted developmentFile: BUILDING 2.pdf7 Oct 2019
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf7 Oct 2019
Declaration in FORM BFile: FORM B OF PROMOTER.pdf7 Oct 2019
Proforma of Allotment letterFile: AGREEMMENT.pdf7 Oct 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JAYHIND HILLSIDE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DUDULGAON13,700+ in Pune

2 kmJAYHIND HILLSIDECompleted 46Lapsed / revoked 22Other 79Dot size: filed unitsN

Filed coordinates, straight-line distance. 147 registered projects within 2 km.

Builder: SAGAR JAYSING ERANDE

SAGAR JAYSING ERANDE has 2 registrations on MahaRERA, including JAYHIND HOMES and JAYHIND HILLSIDE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if JAYHIND HILLSIDE is delayed beyond 30 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JAYHIND HILLSIDE?

The registered promoter entity is SAGAR JAYSING ERANDE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JAYHIND HILLSIDE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JAYHIND HILLSIDE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JAYHIND HILLSIDE?

The professionals named in the filing: Architect: ANJALI ARBAT AND ASSOCIATES; Engineer: DELTACOM STRUCTAL CONSULTANTS; Chartered Accountant: PGMJ AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JAYHIND HILLSIDE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JAYHIND HILLSIDE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JAYHIND HILLSIDE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.