ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / JAYHIND AMPLE

Registered No litigation declared Others project

JAYHIND AMPLE

By JAYHIND GROUP BUILDERS

RG-MH-05631 · RERA P52100055953 · Last updated on MahaRERA portal: 31 Aug 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2027Possession promisedno revision filed
9 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 90%
7 of 82Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

JAYHIND AMPLE is a Others project by JAYHIND GROUP BUILDERS in Pune, Maharashtra, registered with MahaRERA as P52100055953 on 2 May 2024. Possession is promised by 7 Apr 2027. 75 of the 82 units on this registration are recorded sold or booked, and 9 of 33 construction stages are filed complete.

At a glance

Project

  • NameJAYHIND AMPLE
  • TypeOthers
  • Location
    • DUDULGAON
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055953
  • ReraGenie IDRG-MH-05631

Builder

  • NameJAYHIND GROUP BUILDERS
  • Entity typePartnership
  • GSTIN27AAUFJ0037G2Z9
  • PartnersSAGAR JAYSING ERANDE, SANTOSH NAMADEV VAHILE, KIRAN SURESH KHALKAR

Key dates

this monthRegisteredMay 2024PromisedApr 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 May 2024
  • Promised completion7 Apr 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed83 files

Current status

91%75 of 82 units booked
87.2%Work done, per cost certificate

Figures as on 31 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA7624226
BUILDING BNA8728028
BUILDING CNA8728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 31 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 90%.

BUILDING A58%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
BUILDING B58%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
BUILDING C58%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities15

As on 31 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes50%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes40%
Electrical meter room, sub-station, receiving stationYes20%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,461 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Jun 2025

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL CORPORATION
Permissible FSI5844.0
Proposed, not sanctioned5,432 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPIMPLE SAUDAGAR PUNE HDFC BANK LTD SR NO 90 LAKSHADEEP P ALACE SHOP NO 1PIMPLE SAUDAGARAUNDH CAMPPUNE MAHARASHTRA 411027
Estimated costRs 19.63 cr
Cost incurredRs 17.11 cr
Work done87.17%
BuildingWingEstimatedIncurred
BUILDING CNARs 6.91 crRs 6.02 cr
BUILDING BNARs 6.12 crRs 5.33 cr
BUILDING ANARs 4.82 crRs 4.20 cr
-NARs 1.78 crRs 1.56 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANJALI ARBAT & ASSOCIATES
EngineerRATHI'S GROUP
EngineerSACHIN GAIKWAD
Chartered AccountantPGMJ & ASSOCIATES
Chartered AccountantAJINKYA SUNIL JANGADA
Chartered AccountantNITISH VAIDYA & ASSOCIATES
PartnerRole in project
JAYHIND GROUP BUILDERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 7 Apr 2027

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: Form-2A 24-25 SIGNED.pdf31 Aug 2026
Form 2A (FY 2025-2026)File: Form-2A 25-26 SIGNED.pdf31 Aug 2026
Withdrawal Update Form 1File: Form 1 Q1 FY 2026-27.pdf20 Jul 2026
Withdrawal Update Form 2File: Form 2 Q1 FY 2026-27.pdf20 Jul 2026
Withdrawal Update Form 3File: Form 3 Q1 FY 2026-27.pdf20 Jul 2026
Withdrawal Update Form 1File: Form 1 Q4 FY 2025-26.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 Q4 FY 2025-26.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 Q4 FY 2025-26.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 Q3.pdf19 Jan 2026
Withdrawal Update Form 1File: Form 1 Q3.pdf19 Jan 2026
Withdrawal Update Form 2File: Form 2 Q3.pdf19 Jan 2026
Withdrawal Update Form 2File: Form 2 Q3.pdf19 Jan 2026
Withdrawal Update Form 3File: Form 3 Q3.pdf19 Jan 2026
Withdrawal Update Form 3File: Form 3 Q3.pdf19 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 Signed.pdf29 Nov 2025
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf19 Oct 2025
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf19 Oct 2025
Withdrawal Update Form 3File: Withdrawal Application Form3.pdf19 Oct 2025
Withdrawal Update Form 1File: Form 1 Withdrawal Update.pdf3 Oct 2025
Withdrawal Update Form 2File: Form 2 Withdrawal Update.pdf3 Oct 2025
Withdrawal Update Form 3File: Form 3 Withdrawal Update.pdf3 Oct 2025
Form 1File: Form 1.pdf18 Jul 2025
Form 2File: form 2 eng cert.pdf18 Jul 2025
Form 3File: Form 3 CA Signed Final.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD CIRCULAR 29.pdf18 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Signed Final.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 eng cert.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD CIRCULAR 29.pdf17 Apr 2025
Layout approvalFile: Sanction Plan Highlight_compressed.pdf9 Apr 2025
Building plan approvalFile: Building 1.pdf9 Apr 2025
Building plan approvalFile: Building Plan 2.pdf9 Apr 2025
Building plan approvalFile: Bilding plan 3.pdf9 Apr 2025
Copy of Layout Approval (in case of layout)File: Sanction Plan Highlight_compressed.pdf9 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf9 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Building 1.pdf9 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 2.pdf9 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Bilding plan 3.pdf9 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 Final.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Circular.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form Q1-Final.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q2 Final.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form Q2.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: sold booked inventery.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Final.pdf13 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Final.pdf13 Jul 2024
Disclosure of sold/ booked inventoryFile: sold circular.pdf13 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final_compressed.pdf13 Jul 2024
CERSAI detailsFile: CERSAI.pdf29 Apr 2024
Details of encumbrances concerned to FinanceFile: Financial And Legal Encumbrance Final.pdf25 Apr 2024
Details of encumbrances concerned to LegalFile: Financial And Legal Encumbrance Final.pdf25 Apr 2024
Other - TechnicalFile: cc mail.pdf24 Apr 2024
Proforma of Allotment letterFile: 1 Proforma of Allotment letter.pdf23 Apr 2024
Proforma of Agreement for saleFile: Agreement to sale uploaded.pdf23 Apr 2024
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter.pdf23 Apr 2024
Deviation Report with respect to model copy of AgreementFile: no deviation agreement.pdf23 Apr 2024
Other - LegalFile: partnership deed english_11zon.pdf23 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Final_compressed.pdf22 Apr 2024
Layout approvalFile: FINAL LAYOUT HIGHLIGHTED (1)_compressed.pdf12 Apr 2024
Copy of the legal title reportFile: Legal Title Final_compressed.pdf12 Apr 2024
Details of encumbrances concerned to FinanceFile: no legel encumbrace.pdf12 Apr 2024
Details of encumbrances concerned to LegalFile: no legel encumbrace.pdf12 Apr 2024
Copy of Layout Approval (in case of layout)File: FINAL LAYOUT HIGHLIGHTED (1)_compressed.pdf12 Apr 2024
Declaration in FORM BFile: FORM B_compressed.pdf12 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: SAGAR.pdf12 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: KIRAN.pdf12 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: SANTOSH.pdf12 Apr 2024
Other - LegalFile: Order 50.pdf12 Apr 2024
Declaration about Commencement CertificateFile: declaration CC.pdf11 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK AC DETAILS.pdf11 Apr 2024
Building plan approvalFile: Blue Print Page 2.pdf6 Apr 2024
Building plan approvalFile: Blue Print Page 3.pdf6 Apr 2024
Building plan approvalFile: Blue Print Page 4.pdf6 Apr 2024
PAN CardFile: FIRM PAN.pdf6 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Blue Print Page 2.pdf6 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Blue Print Page 3.pdf6 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Blue Print Page 4.pdf6 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf6 Apr 2024

How this compares with Pune

91%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JAYHIND AMPLE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DUDULGAON13,700+ in Pune

2 kmJAYHIND AMPLECompleted 51Lapsed / revoked 25Other 79Dot size: filed unitsN

Filed coordinates, straight-line distance. 155 registered projects within 2 km.

Builder: JAYHIND GROUP BUILDERS

JAYHIND GROUP BUILDERS has 1 registration on MahaRERA, including JAYHIND AMPLE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if JAYHIND AMPLE is delayed beyond 7 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JAYHIND AMPLE?

The registered promoter entity is JAYHIND GROUP BUILDERS, a partnership as per the filing. Its GSTIN 27AAUFJ0037G2Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JAYHIND AMPLE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JAYHIND AMPLE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JAYHIND AMPLE?

The professionals named in the filing: Architect: ANJALI ARBAT & ASSOCIATES; Engineer: RATHI'S GROUP; Engineer: SACHIN GAIKWAD; Chartered Accountant: PGMJ & ASSOCIATES; Chartered Accountant: AJINKYA SUNIL JANGADA; Chartered Accountant: NITISH VAIDYA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JAYHIND AMPLE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JAYHIND AMPLE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JAYHIND AMPLE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.