Registered No litigation declared Residential / Group Housing project

JAMBRUNG VALLEY

By KIRTIRAJ NANASAHEB SAWANT

RG-MH-06600 · RERA P52000052903 · Last updated on MahaRERA portal: 20 Jun 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Nov 2026Possession promisedno revision filed
19 of 66Construction stages doneacross 6 buildings; furthest along: Slabs of Super Structure, 50%
10 of 22Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

JAMBRUNG VALLEY is a Residential / Group Housing project by KIRTIRAJ NANASAHEB SAWANT in Raigarh, Maharashtra, registered with MahaRERA as P52000052903 on 5 Oct 2023. Possession is promised by 30 Nov 2026. 12 of the 22 units on this registration are recorded sold or booked, and 19 of 66 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameJAMBRUNG VALLEY
  • TypeResidential / Group Housing
  • Location
    • JAMBRUNG
    • Kamatpada
    • Karjat
    • Raigarh
    • 410201
  • Pincode410201
  • RERA no.P52000052903
  • ReraGenie IDRG-MH-06600

Builder

  • NameKIRTIRAJ NANASAHEB SAWANT
  • Entity typeIndividual

Key dates

this monthRegisteredOct 2023PromisedNov 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Oct 2023
  • Promised completion30 Nov 2026
  • Revised completionNone
  • Buildings6 building records
  • Documents filed82 files

Current status

55%12 of 22 units booked
44.2%Work done, per cost certificate

Figures as on 20 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A TYPENA11101
B TYPENA11101
A1 TYPENA11303
B1 TYPENA11505
C TYPENA11909
D TYPENA11303

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 20 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

19 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Slabs of Super Structure, at 50%.

A TYPE73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B TYPE32%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
A1 TYPE0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B1 TYPE0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C TYPE0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D TYPE73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,179 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityCIDCO
Permissible FSI3176.58
Proposed, not sanctioned3,177 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGHATKOPAR EAST
Estimated costRs 18.96 cr
Cost incurredRs 8.38 cr
Work done44.21%
BuildingWingEstimatedIncurred
-NARs 5.00 crRs 3.08 cr
A TYPENARs 2.33 crRs 88.38 lakh
B TYPENARs 2.33 crRs 88.38 lakh
A1 TYPENARs 2.33 crRs 88.38 lakh
B1 TYPENARs 2.33 crRs 88.38 lakh
C TYPENARs 2.33 crRs 88.38 lakh
D TYPENARs 2.33 crRs 88.38 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCHAITANYA SHAHASANE AND ASSOCIATES
EngineerANIRUDDHA CONSULTANT
EngineerJay Gopichand Pende
Chartered AccountantD P SHEJWAL AND ASSOCIATES
Chartered AccountantMs Singh Ranjan & Co
PartnerRole in project
KIRTIRAJ NANASAHEB SAWANT-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600085Bhakti AchrekarKIRTIRAJ NANASAHEB SAWANT23/01/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Nov 2026

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 31-03-2026 1.pdf20 Jun 2026
Withdrawal Update Form 2File: Form 2 31-03-2026 2.pdf20 Jun 2026
Withdrawal Update Form 3File: From 3 Kirtiraj 31-03-2026 sign.pdf20 Jun 2026
Form 1File: Form 1.pdf20 Jan 2026
Form 2File: Form 2 31-12-2025.pdf20 Jan 2026
Form 3File: FORM 3 Kirtiraj 31-12-2025 - new.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold_ unsold.pdf20 Jan 2026
Form 1File: Form 1 30-09-25.pdf5 Dec 2025
Form 2File: Form 2 30-09-25.pdf5 Dec 2025
Form 3File: Form 3 30-09-25.pdf5 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold_ unsold 30-09-25.pdf5 Dec 2025
Form 1File: Form 1 30-06-25.pdf28 Nov 2025
Form 2File: Form 2 30-06-25.pdf28 Nov 2025
Form 3File: FORM 3 Kirtiraj 30-06-2025.pdf28 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold 30-06-25.pdf28 Nov 2025
Form 1File: Form 1 kirtiraj 31-03-25.pdf18 Jun 2025
Form 2File: Form 2 kirtiraj 31-03-25.pdf18 Jun 2025
Form 3File: KIRTIRAJ SAWANT FORM 3 31-3-25 new.pdf18 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold unsold kirtiraj 31-03-25.pdf18 Jun 2025
Self-declaration of Quarterly ProgressFile: Dclaration for qpr kirtiraj 31-03-25.pdf18 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - converted.pdf10 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf10 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf9 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - converted.pdf9 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf9 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Signed.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Signed.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Signed.pdf18 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Signed.pdf18 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed.pdf18 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3.pdf5 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - SIGNED.pdf30 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 -SINGED.pdf30 Mar 2024
Copy of the legal title reportFile: Legal Title Report NEw.pdf20 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: Plinth Intimation.pdf20 Sep 2023
Other - TechnicalFile: Plinth Intimation.pdf20 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 New.pdf28 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 new.pdf28 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 New 28-08-2023.pdf28 Aug 2023
Proforma of Allotment letterFile: 1 Proforma of Allotment letter (8)_1 (6 files merged).pdf28 Aug 2023
Other - TechnicalFile: CLARIFICATION ABT CC.pdf28 Aug 2023
Declaration about Commencement CertificateFile: declaration about comm cert.pdf26 Aug 2023
CERSAI detailsFile: CERSAI_Search_Report 1.pdf26 Aug 2023
CERSAI detailsFile: CERSAI_Search_Report 2.pdf26 Aug 2023
CERSAI detailsFile: CERSAI_Search_Report 3.pdf26 Aug 2023
CERSAI detailsFile: CERSAI_Search_Report 4.pdf26 Aug 2023
Proforma of Agreement for saleFile: AFS KIRTIRAJ.pdf26 Aug 2023
Layout approvalFile: Plan A Plot No 50.pdf25 Aug 2023
Layout approvalFile: Plan B Plot no 63.pdf25 Aug 2023
Layout approvalFile: Plan A.pdf25 Aug 2023
Layout approvalFile: Plan B1.pdf25 Aug 2023
Layout approvalFile: Plan C.pdf25 Aug 2023
Layout approvalFile: Plan D.pdf25 Aug 2023
Building plan approvalFile: Plan A Plot No 50.pdf25 Aug 2023
Building plan approvalFile: Plan B Plot no 63.pdf25 Aug 2023
Building plan approvalFile: Plan A.pdf25 Aug 2023
Building plan approvalFile: Plan B1.pdf25 Aug 2023
Building plan approvalFile: Plan C.pdf25 Aug 2023
Building plan approvalFile: Plan D.pdf25 Aug 2023
PAN CardFile: kns new pan card09032022_0001.pdf25 Aug 2023
Details of encumbrances concerned to FinanceFile: no encumbrances cert.pdf25 Aug 2023
Details of encumbrances concerned to LegalFile: no encumbrances cert.pdf25 Aug 2023
Copy of Layout Approval (in case of layout)File: Plan A Plot No 50.pdf25 Aug 2023
Copy of Layout Approval (in case of layout)File: Plan B Plot no 63.pdf25 Aug 2023
Copy of Layout Approval (in case of layout)File: Plan A.pdf25 Aug 2023
Copy of Layout Approval (in case of layout)File: Plan B1.pdf25 Aug 2023
Copy of Layout Approval (in case of layout)File: Plan C.pdf25 Aug 2023
Copy of Layout Approval (in case of layout)File: Plan D.pdf25 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan A Plot No 50.pdf25 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan B Plot no 63.pdf25 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan A.pdf25 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan B1.pdf25 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan C.pdf25 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan D.pdf25 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: CC 2 Bungalows Plot no 50 and 63.pdf25 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: CC 20 Bungalows.pdf25 Aug 2023
Declaration in FORM BFile: FORM B.pdf25 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest.pdf25 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: format A bank account.pdf25 Aug 2023

How this compares with Raigarh

55%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JAMBRUNG VALLEY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JAMBRUNG5,900+ in Raigarh

Builder: KIRTIRAJ NANASAHEB SAWANT

KIRTIRAJ NANASAHEB SAWANT has 1 registration on MahaRERA, including JAMBRUNG VALLEY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if JAMBRUNG VALLEY is delayed beyond 30 Nov 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JAMBRUNG VALLEY?

The registered promoter entity is KIRTIRAJ NANASAHEB SAWANT, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JAMBRUNG VALLEY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against JAMBRUNG VALLEY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for JAMBRUNG VALLEY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JAMBRUNG VALLEY?

The professionals named in the filing: Architect: CHAITANYA SHAHASANE AND ASSOCIATES; Engineer: ANIRUDDHA CONSULTANT; Engineer: Jay Gopichand Pende; Chartered Accountant: D P SHEJWAL AND ASSOCIATES; Chartered Accountant: Ms Singh Ranjan & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JAMBRUNG VALLEY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JAMBRUNG VALLEY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JAMBRUNG VALLEY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.