Completed No litigation declared Residential / Group Housing project

JAISHREE PARIKSHIT CHS LTD

By AAKAR SHIVAM REALTY

RG-MH-07366 · RERA P51800055043 · Last updated on MahaRERA portal: 13 Mar 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Feb 2026Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Basement (if any), 0%
23 of 27Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 55 documents Report an error

JAISHREE PARIKSHIT CHS LTD is a Residential / Group Housing project by AAKAR SHIVAM REALTY in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800055043 on 26 Feb 2024. The registration is recorded completed; possession was promised by 2 Feb 2026. The completion date has moved by 4 months from the original filing. 4 of the 27 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameJAISHREE PARIKSHIT CHS LTD
  • TypeResidential / Group Housing
  • Location
    • PAHADI
    • GOREGAON WEST
    • Pahadi-Goregaon
    • Borivali
    • Mumbai Suburban
    • 400104
  • Pincode400104
  • RERA no.P51800055043
  • ReraGenie IDRG-MH-07366

Builder

  • NameAAKAR SHIVAM REALTY
  • Entity typePartnership
  • PartnersGAURAV VINOD PATEL, MRUGESH RAJENDRA SHAH

Key dates

this monthRegisteredFeb 2024First promiseOct 2025Revised toFeb 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on26 Feb 2024
  • Promised completion2 Feb 2026
  • Revised completionRevised to 2 Feb 2026 (originally 18 Oct 2025)
  • Buildings1 building record
  • Documents filed55 files

Current status

15%4 of 27 units booked
105.2%Work done, per cost certificate

Figures as on 13 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
JAISHREE PARIKSHIT CHS LTDNA10927027

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

JAISHREE PARIKSHIT CHS LTD: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed17

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots17
Closed/Covered17

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area528 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Oct 2025
LandownerVillageDistrict
JAY SHREE PARIKSHIT CO-OP HSG SOC LTDPahadi-GoregaonMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1565.38
Proposed, not sanctioned1,565 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR MANISH CHAMBERS PREMISES CHSL MUMBAI 400063
Estimated costRs 7.15 cr
Cost incurredRs 7.52 cr
Work done105.25%
BuildingWingEstimatedIncurred
JAISHREE PARIKSHIT CHS LTDNARs 6.65 crRs 7.02 cr
-NARs 50.00 lakhRs 50.00 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANJAY B SHAH
EngineerMr. KEVIN R PATEL
EngineerRAHUL VARMA
Chartered AccountantNEHALI AND CO
PartnerRole in project
AAKAR SHIVAM REALTY-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA19112518371Oct 2025 → Dec 2025

Reason as filed by the promoterOur project is already completed, hence applied for oc and expecting oc soon

EA03022619693Oct 2025 → Feb 2026

Reason as filed by the promoterFULL OC RECEVIED

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed55

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: OCC issue letter -02-02-2026 Jayshree Parikshit CHS Ltd..pdf13 Mar 2026
Withdrawal Update Form 1File: Architect Form 1 Oct 25 to Dec 25.pdf4 Mar 2026
Withdrawal Update Form 2File: Engineer Form 2 Oct 25 to Dec 25.pdf4 Mar 2026
Withdrawal Update Form 3File: CA Form 3 Oct 25 to Dec 25.pdf4 Mar 2026
Withdrawal Update Form 1File: Architect Form-1 (July to Sept-250.pdf19 Nov 2025
Withdrawal Update Form 1File: Architect Form-1 (July to Sept-250.pdf19 Nov 2025
Withdrawal Update Form 2File: Engineeru0027s Form - 2 (Jult to Sept-25).pdf19 Nov 2025
Withdrawal Update Form 2File: Engineeru0027s Form - 2 (Jult to Sept-25).pdf19 Nov 2025
Withdrawal Update Form 3File: CA Form-3 (July to Sept-25).pdf19 Nov 2025
Withdrawal Update Form 3File: CA Form-3 (July to Sept-25).pdf19 Nov 2025
Withdrawal Update Form 1File: Architect Form-1 (July to Sept-250.pdf17 Nov 2025
Withdrawal Update Form 2File: Engineeru0027s Form - 2 (Jult to Sept-25).pdf17 Nov 2025
Withdrawal Update Form 3File: CA Form-3 (July to Sept-25).pdf17 Nov 2025
Withdrawal Update Form 1File: Architect Cert June 25.pdf14 Nov 2025
Withdrawal Update Form 2File: Engg Certificate June 25.pdf14 Nov 2025
Withdrawal Update Form 3File: CA Certificate June 25.pdf14 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect cert March 25.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate March-25.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate Form-2 March-25.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect ceri Dec-24.pdf15 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Cert Dec 24.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engg certi Dec-24.pdf15 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Engg crti 23-24.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Form-5 23-24.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Architect Sept24.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA certi Sept24.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg Sept24.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf10 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf10 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf10 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 Architect certificate.pdf17 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 Engineer Certificate.pdf15 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 C A Certificate.pdf15 Apr 2024
Details of encumbrances concerned to FinanceFile: Corrigendum Letter (1).pdf19 Jan 2024
Details of encumbrances concerned to LegalFile: Corrigendum Letter (1).pdf19 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf19 Jan 2024
CERSAI detailsFile: Corrigendum Letter (1).pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca part_merged.pdf11 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A DOI.pdf26 Dec 2023
Layout approvalFile: DrawingS.pdf25 Dec 2023
Building plan approvalFile: IOD.pdf25 Dec 2023
PAN CardFile: PAN Aakar Shivam Realty.pdf25 Dec 2023
Copy of the legal title reportFile: RERA Title Certificate Plot 59.pdf25 Dec 2023
Details of encumbrances concerned to FinanceFile: No encumbrance (2).pdf25 Dec 2023
Details of encumbrances concerned to LegalFile: No encumbrance (2).pdf25 Dec 2023
Copy of Layout Approval (in case of layout)File: DrawingS.pdf25 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf25 Dec 2023
Declaration about Commencement CertificateFile: Declaration Format D (1).pdf25 Dec 2023
Declaration in FORM BFile: Declaration Promoter.pdf25 Dec 2023
CERSAI detailsFile: Cersai Declaration.pdf25 Dec 2023
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale.pdf25 Dec 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER FINAL.pdf25 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Declaration (1).pdf25 Dec 2023
Deviation Report with respect to Allotment letterFile: No Deviation (2).pdf25 Dec 2023
Deviation Report with respect to model copy of AgreementFile: deviation agreement.pdf25 Dec 2023

How this compares with Mumbai Suburban

15%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 4 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep JAISHREE PARIKSHIT CHS LTD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GOREGAON WEST6,700+ in Mumbai Suburban

Builder: AAKAR SHIVAM REALTY

AAKAR SHIVAM REALTY has 1 registration on MahaRERA, including JAISHREE PARIKSHIT CHS LTD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if JAISHREE PARIKSHIT CHS LTD is delayed beyond 2 Feb 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of JAISHREE PARIKSHIT CHS LTD?

The registered promoter entity is AAKAR SHIVAM REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in JAISHREE PARIKSHIT CHS LTD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for JAISHREE PARIKSHIT CHS LTD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at JAISHREE PARIKSHIT CHS LTD?

The professionals named in the filing: Architect: SANJAY B SHAH; Engineer: Mr. KEVIN R PATEL; Engineer: RAHUL VARMA; Chartered Accountant: NEHALI AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in JAISHREE PARIKSHIT CHS LTD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About JAISHREE PARIKSHIT CHS LTD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save JAISHREE PARIKSHIT CHS LTD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.