Home / Browse projects / Nashik, Maharashtra / Jagruti Co-operative Housing Society Ltd.
Jagruti Co-operative Housing Society Ltd.
RG-MH-71576 · RERA P51600046354 · Last updated on MahaRERA portal: 29 Jul 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Jagruti Co-operative Housing Society Ltd. is a Others project by Moulik Jitendra Shah in Nashik, Maharashtra, registered with MahaRERA as P51600046354 on 22 Jun 2022. The registration is recorded completed; possession was promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 13 of the 51 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.
At a glance
Project
- NameJagruti Co-operative Housing Society Ltd.
- TypeOthers
- Location
- Gurudwara Road
- Shingada Talav
- Nashik
- 422001
- Pincode422001
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600046354
- ReraGenie IDRG-MH-71576
Builder
- NameMoulik Jitendra Shah
- Entity typeIndividual
- GSTIN27AWWPS8541E1ZS
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on22 Jun 2022
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
- Buildings1 building record
- Documents filed62 files
Current status
Figures as on 29 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Jagruti Co-operative Housing Society Ltd | NA | 8 | 7 | 45 | 6 | 51 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 90%.
Jagruti Co-operative Housing Society Ltd: 78% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 90% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 75% |
Progress on shared amenities15
As on 29 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 50% |
Parking filed187
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Jagruti Co-operative Housing Society Ltd. | Nashik | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Jagruti Co-operative Housing Society Ltd | NA | Rs 10.04 cr | Rs 9.33 cr |
| - | NA | Rs 30.25 lakh | Rs 15.12 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rasik Bothara |
| Engineer | Sanjeev Patel |
| Engineer | Sagar Shah |
| Chartered Accountant | Nirav Shah |
| Chartered Accountant | Saril Shah |
| Partner | Role in project |
|---|---|
| Mayur Builder & Developers | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterI was facing financial crunch in between due to which the progress on site was slow and hence things got delayed. So I was unable to obtain Occupancy Certificate till 31/12/2025.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Jun 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Jun 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Jun 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed62
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: OC.pdf | 29 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 26-27 Q1.pdf | 28 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 26-27 Q1.pdf | 28 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 26-27 Q1.pdf | 28 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 25-26 Q4.pdf | 30 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 25-26 Q4.pdf | 30 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 SD 25-26 Q4.pdf | 30 Apr 2026 |
| Form 2A (FY 2025-2026) | 13 Apr 2026 |
| Form 5 (FY 2022-2023)File: Form 5 - 2022-23.pdf | 9 Apr 2026 |
| Form 5 (FY 2023-2024)File: Form 5 - 2023-24.pdf | 9 Apr 2026 |
| Form 5 (FY 2024-2025)File: Form 5 - 2024-25.pdf | 9 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 25-26 Q1.pdf | 30 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 25-26 Q2.pdf | 30 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 25-26 Q3.pdf | 30 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 25-26 Q1.pdf | 30 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 25-26 Q2.pdf | 30 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 25-26 Q3.pdf | 30 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 SD 25-26 Q1.pdf | 30 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 SD 25-26 Q1.pdf | 30 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 25-26 Q3.pdf | 30 Mar 2026 |
| Form 1 24-25 Q4 | 29 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD 24-25 Q4.pdf | 29 Apr 2025 |
| Form 2 24-25 Q4 | 29 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory 31-03-2025.pdf | 29 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 23-24 Q4.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 24-25 Q1.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 24-25 Q2.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 24-25 Q3.pdf | 17 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 23-24 Q4.pdf | 17 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD 24-25 Q1.pdf | 17 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD 24-25 Q2.pdf | 17 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD 24-25 Q3.pdf | 17 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 23-24 Q4.pdf | 17 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 24-25 Q1.pdf | 17 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 24-25 Q2.pdf | 17 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 24-25 Q3.pdf | 17 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory 31-12-2024.pdf | 17 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - 2023.pdf | 17 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - 2024.pdf | 17 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - 2023-24.pdf | 8 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - 2022-23.pdf | 9 Nov 2023 |
| Layout approvalFile: Plot Layout.pdf | 19 Jun 2022 |
| Building plan approvalFile: SP 1.pdf | 19 Jun 2022 |
| Building plan approvalFile: SP 2.pdf | 19 Jun 2022 |
| Building plan approvalFile: SP 3.pdf | 19 Jun 2022 |
| Building plan approvalFile: SP 4.pdf | 19 Jun 2022 |
| PAN CardFile: PAN.pdf | 19 Jun 2022 |
| Copy of the legal title reportFile: Title Report.pdf | 19 Jun 2022 |
| Details of encumbrancesFile: No Encumbrance.pdf | 19 Jun 2022 |
| Copy of Layout Approval (in case of layout)File: Plot Layout.pdf | 19 Jun 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: SP 1.pdf | 19 Jun 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: SP 2.pdf | 19 Jun 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: SP 3.pdf | 19 Jun 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: SP 4.pdf | 19 Jun 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 19 Jun 2022 |
| Declaration about Commencement CertificateFile: Declaration About CC.pdf | 19 Jun 2022 |
| Declaration in FORM BFile: Form B - Builder.pdf | 19 Jun 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 19 Jun 2022 |
| CERSAI detailsFile: Cersai Report.pdf | 19 Jun 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 19 Jun 2022 |
| Proforma of Allotment letterFile: Agreement To Sale.pdf | 19 Jun 2022 |
| Proforma of Allotment letterFile: Allottment Letter.pdf | 19 Jun 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 62 filed documents as one ZIP, foldered, with a manifest
Keep Jagruti Co-operative Housing Society Ltd. on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Shingada Talav4,100+ in Nashik
Filed coordinates, straight-line distance. 314 registered projects within 2 km.
LOTUS CAPITAL
BORA REALTY LLP
SHREE KALIKA PLAZA
DEEPAK KALYANJI CHANDE
Shreeji Celestia
SHREEJI LIFE SPACE
BUSINESS PLUS
MANGO ESTTATE
Iconic Business Center Dwarka
BAGAD PROPERTIES
NAKSHTRA AVENUE
SHYAM DEVELOPERS
See every Nashik project, with the district possession charts
Builder: Moulik Jitendra Shah
Moulik Jitendra Shah has 1 registration on MahaRERA, including Jagruti Co-operative Housing Society Ltd.. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if Jagruti Co-operative Housing Society Ltd. is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Jagruti Co-operative Housing Society Ltd.?
The registered promoter entity is Moulik Jitendra Shah, an individual as per the filing. Its GSTIN 27AWWPS8541E1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Jagruti Co-operative Housing Society Ltd.?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Jagruti Co-operative Housing Society Ltd.?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Jagruti Co-operative Housing Society Ltd.?
The professionals named in the filing: Architect: Rasik Bothara; Engineer: Sanjeev Patel; Engineer: Sagar Shah; Chartered Accountant: Nirav Shah; Chartered Accountant: Saril Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Jagruti Co-operative Housing Society Ltd.?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback