J.P TOWER
By SHREE RADHAKRISHNA DEVELOPERS
RG-KA-54904 · RERA PRM/KA/RERA/1249/447/PR/191222/005533 · Last updated on RERA Karnataka portal: 30 Nov 2022
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
J.P TOWER is a Mixed Development project by SHREE RADHAKRISHNA DEVELOPERS in Belagavi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1249/447/PR/191222/005533 on 19 Dec 2022. Possession is promised by 31 Aug 2025.
At a glance
Project
- NameJ.P TOWER
- TypeMixed Development
- Location
- Belagavi
- 590001
- Pincode590001
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1249/447/PR/191222/005533
- ReraGenie IDRG-KA-54904
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on19 Dec 2022
- Promised completion31 Aug 2025
- Revised completionNone
- Buildings1 building record
- Documents filed76 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| J.P TOWER | - | - | - | - | - | 8 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 30 Nov 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | - |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 30 Nov 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | - |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | No | Not applicable |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | Yes | - |
| Terrace | No | Not applicable |
| Outer Wall | Yes | - |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership5
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| RAHUL RAMESH PATIL | - | - |
| BHARATI RAMESH PATIL | - | - |
| PRATIK BHAURAO PATIL | - | - |
| SHONALI BHAURAO PATIL | - | - |
| DHANASHRI RAMESH PATIL | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 3.51 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar. PRATIKSHA B KATTIMANI |
| Engineer | VINAY J BEHRE |
| Chartered Accountant | KASHISH PORWAL |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed76
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1249/447/PR/191222/005533 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| 2) Parking numbers mentioned in the details page not matching with the sanction plan.(Not Updated)File: Self Declaration of Covered Parking.pdf | 30 Nov 2022 |
| Upload revised chartered accountant certificate with UDIN.File: RERA Form 1 Certificate 2.pdf | 15 Nov 2022 |
| Upload relinquishment deed of the road widening Area. (Not Uploaded)File: Revised Khata for Reliquishment.pdf | 15 Nov 2022 |
| Upload village map showing the proposed site. (Uploaded Google map Instead)File: CTS Extract Map.pdf | 15 Nov 2022 |
| In the uploaded letter issued by KUWSDB, there is no clarity of water supply to the project and mentFile: Water NOC Merged Copy New-1-3.pdf | 15 Nov 2022 |
| 1. Partners details not matched with CA certificate.File: Partner Miss Match Declration from CA Copy.pdf | 27 Aug 2022 |
| 1)need to upload rtc and MRFile: Self Declaration of RTC & MR.pdf | 27 Aug 2022 |
| 2)need title deed (uploaded sale deed is difficult to read translate the page and re upload)File: Partition Deed Copy_merged.pdf | 27 Aug 2022 |
| 3)need ec reflecting all transactions in form 15 from 01-05-2005 to upto dateFile: New EC Copy_merged.pdf | 27 Aug 2022 |
| 4)need land owners signature separately in no litigation affidavit.File: Seperate No- Litigation Copy 1.pdf | 27 Aug 2022 |
| 4)need land owners signature separately in no litigation affidavit.File: Seperate No- Litigation Copy 2.pdf | 27 Aug 2022 |
| 4)need land owners signature separately in no litigation affidavit.File: Seperate No-Litigation Copy 3.pdf | 27 Aug 2022 |
| 4)need land owners signature separately in no litigation affidavit.File: Seperate No-Litigation Copy 4.pdf | 27 Aug 2022 |
| 4)need land owners signature separately in no litigation affidavit.File: Seperate No-LitigationCopy 5.pdf | 27 Aug 2022 |
| 2) Upload certified carpet area calculation.File: Certification of Carpet Area Copy.pdf | 27 Aug 2022 |
| 4) Upload single plot layout.File: Self Declaration of Single Plot Layout & Order.pdf | 27 Aug 2022 |
| 5) Upload single plot layout Order.File: Self Declaration of Single Plot Layout & Order.pdf | 27 Aug 2022 |
| 6) Upload relinquishment deed of the road widening Area.File: Self Declaration of Reliquishment Deed.pdf | 27 Aug 2022 |
| 7) Upload village map showing the proposed site.File: Village Map Demarcation.jpg | 27 Aug 2022 |
| 8) Upload commencement certificate.File: Self Declaration of Commencement Certificate.pdf | 27 Aug 2022 |
| 1) Please upload the brief estimated cost of construction certiied by the Engineer.File: Brief Estimation of Construction Copy.pdf | 27 Aug 2022 |
| 3) Uploaded only copy of fee receipt instead of NOC. please upload the HESCOM NOC.File: HESCOM Noc Copy_merged.pdf | 27 Aug 2022 |
| 5) Uploaded the copy of letter written to EE, KUWSDB, Therefore please upload the valid NOC issued bFile: Water NOC Copy New.pdf | 27 Aug 2022 |
| Registration CertificateFile: Firm Registration Copy.pdf | - |
| Partnership DeedFile: Partnership Deed Copy.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: RERA Form 1 Certificate 2.pdf | - |
| Certificate issued by Architect Form 2File: Form No-2 Approval Cost Final Copy.pdf | - |
| Certificate issued by Engineer Form 3File: Form No-3 Appeoval Cost Copy.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Non-Litigation Affidavit Copy.pdf | - |
| Certificate from Chartered AccountFile: RERA Form 1 Certificate 2.pdf | - |
| Balance Sheet 2020 - 2021File: Firm P_L Bslance Sheet 21-22.pdf | - |
| Balance Sheet 2019 - 2020File: Nil Return Declaration Copy.pdf | - |
| Balance Sheet 2018 - 2019File: Nil Return Declaration Copy.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: Firm P_L Bslance Sheet 21-22.pdf | - |
| Audited Profit and Loss Statement 2019 - 2020File: Nil Return Declaration Copy.pdf | - |
| Audited Profit and Loss Statement 2018 - 2019File: Nil Return Declaration Copy.pdf | - |
| Income Tax Return Acknowledgement 2020 - 2021File: Nil Return Declaration Copy.pdf | - |
| Income Tax Return Acknowledgement 2019 - 2020File: Nil Return Declaration Copy.pdf | - |
| Income Tax Return Acknowledgement 2018 - 2019File: Nil Return Declaration Copy.pdf | - |
| Commencement Certificate Copy | - |
| HESCOM Noc Paid Receipt | - |
| Water NOC Copy_merged | - |
| DC Conversion Order Copy | - |
| Approval Sanction Plan Drawing Copy | - |
| Approval Sanction Plan Drawing Copy | - |
| Project Specification Copy | - |
| Approval Sanction Plan Drawing Copy | - |
| Stability Certificate | - |
| Advocate Search Report | - |
| GPA Registered Copy | - |
| DC Conversion Order Copy | - |
| GPA Registered Copy | - |
| Proforma of Agreement of Sale PDF | - |
| ALLOTMENT LETTER PDF | - |
| Form-B Affidavit Copy | - |
| Section 3_1 Affidavit Copy | - |
| JD Cum Declaration Affidavit Copy | - |
| HESCOM Noc Paid Receipt | - |
| Water NOC Copy_merged | - |
| KSPCB Copy | - |
| GPA Registered Copy | - |
| KSPCB Challan Paid Receipt Copy | - |
| Sale Deed Copy | - |
| Location Demarcation | - |
| STP Demarcation Copy | - |
| SR Guidence Value Copy | - |
| CDP Demarcation & Master Plan Copy | - |
| Prospectus/BrochureFile: Project Brochure.jpg | - |
| Advertisement Copy 1File: Project Brochure.jpg | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Belagavi
Computed across the 460+ Belagavi projects on ReraGenie, from their own filings.
Keep J.P TOWER on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Belagavi460+ in Belagavi
Filed coordinates, straight-line distance. 59 registered projects within 2 km.
SHIVNERI Apartment
SHIVNERI CONSTRUCTIONS
ORIONIS OPAL
M/s. VARDHAMAN VENTURES
NORTH EAST AVENUE
Pristine Developer and Builders
KILLEDAR PRIDE
M/s. UNIQUE CONSTRUCTIONS
NORTH ENCLAVE
PRISTINE CONSTRUCTIONS
AADDI HOMES
PRATAP NALAVADE
See every Belagavi project, with the district possession charts
Builder: SHREE RADHAKRISHNA DEVELOPERS
SHREE RADHAKRISHNA DEVELOPERS has 2 registrations on RERA Karnataka, including J.P TOWER and SHREE DATTA SMRUTI. Its filings declare 1 earlier project, none of them declared completed. Read the full track record. See more projects on the Belagavi district page.
Frequently asked questions
What are my rights if J.P TOWER is delayed beyond 31 Aug 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of J.P TOWER?
The registered promoter entity is SHREE RADHAKRISHNA DEVELOPERS, a partnership firm as per the filing. Its GSTIN 29AENFS6386L1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in J.P TOWER?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at J.P TOWER?
The professionals named in the filing: Architect: Ar. PRATIKSHA B KATTIMANI; Engineer: VINAY J BEHRE; Chartered Accountant: KASHISH PORWAL. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in J.P TOWER?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.