Home / Browse projects / Pune, Maharashtra / IVORY VISTA

Registered No litigation declared Residential / Group Housing project

IVORY VISTA

By PHATE KAMTHE ASSOCIATES

RG-MH-70269 · RERA P52100055482 · Last updated on MahaRERA portal: 9 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 60%
59 of 90Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

IVORY VISTA is a Residential / Group Housing project by PHATE KAMTHE ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100055482 on 2 Apr 2024. Possession is promised by 30 Jun 2027. 31 of the 90 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameIVORY VISTA
  • TypeResidential / Group Housing
  • Location
    • GUJARWADI ROAD
    • KATRAJ
    • Haveli
    • Pune
    • 411046
  • Pincode411046
  • RERA no.P52100055482
  • ReraGenie IDRG-MH-70269

Builder

  • NamePHATE KAMTHE ASSOCIATES
  • Entity typePartnership
  • PartnersSANDESH DNYANOBA PHATE, SUNIL CHANDRAKANT KAMTHE, ATUL DINKAR PHATE, ATHARV VIKAS PHATE, SANKET RAJESH PHATE, RAJESH DNYANOBA PHATE, BALKRISHNA DNYANOBA PHATE
  • PartnersVINITESH DATTA PHATE, VIKAS DNYANOBA PHATE, GOPINATH CHANDRAKANT KAMTHE

Key dates

this monthRegisteredApr 2024PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Apr 2024
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed89 files

Current status

34%31 of 90 units booked
41.2%Work done, per cost certificate

Figures as on 9 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING B NA141290090

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 60%.

BUILDING B: 60% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed142

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots142
Closed/Covered142

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,751 sq m
Land owned byNot the promoter
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Sep 2024
LandownerVillageDistrict
LATA RAMESH BALWADKARKatrajPune
SHANTA SHIVAJI BALWADKARKatrajPune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI6184.56
Proposed, not sanctioned6,185 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchsaraswati bank ,MUDRA COMMERCIAL COMPLEX , vasant Baug, Vasant Baug Society, Bibwewadi, Pune, Mahara
Estimated costRs 22.11 cr
Cost incurredRs 9.10 cr
Work done41.17%
BuildingWingEstimatedIncurred
BUILDING BNARs 22.11 crRs 9.10 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVIKAS M DHERE
EngineerSATISH MARATHE
EngineerVINITESH PHATE
Chartered AccountantVINAY CHORDIA
Chartered AccountantVINOD MANE
PartnerRole in project
PHATE KAMTHE ASSOCIATES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf9 Jul 2026
Withdrawal Update Form 2File: FORM 2.pdf9 Jul 2026
Withdrawal Update Form 3File: FORM 3.pdf9 Jul 2026
Layout approvalFile: plan 1_compressed.pdf14 Apr 2026
Building plan approvalFile: plan 2_compressed (1).pdf14 Apr 2026
Building plan approvalFile: plan 3-compressed.pdf14 Apr 2026
Building plan approvalFile: plan 4-compressed.pdf14 Apr 2026
Building plan approvalFile: plan 5_compressed.pdf14 Apr 2026
Building plan approvalFile: plan 6_compressed (1).pdf14 Apr 2026
Building plan approvalFile: plan 7-compressed.pdf14 Apr 2026
Building plan approvalFile: plan 8_compressed (1).pdf14 Apr 2026
Building plan approvalFile: plan 9-compressed.pdf14 Apr 2026
Building plan approvalFile: plan 10-compressed.pdf14 Apr 2026
Form 1File: FORM 1.pdf9 Apr 2026
Form 2File: FORM 2.pdf9 Apr 2026
Form 3File: CA.pdf9 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf9 Apr 2026
Form 1File: form 1.pdf19 Jan 2026
Form 2File: form 2.pdf19 Jan 2026
Form 3File: form 3.pdf19 Jan 2026
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf19 Jan 2026
Withdrawal Update Form 1File: arc.pdf16 Oct 2025
Withdrawal Update Form 1File: arc.pdf16 Oct 2025
Withdrawal Update Form 1File: arc.pdf16 Oct 2025
Withdrawal Update Form 2File: engg.pdf16 Oct 2025
Withdrawal Update Form 2File: engg.pdf16 Oct 2025
Withdrawal Update Form 2File: engg.pdf16 Oct 2025
Withdrawal Update Form 3File: ca.pdf16 Oct 2025
Withdrawal Update Form 3File: ca.pdf16 Oct 2025
Withdrawal Update Form 3File: ca.pdf16 Oct 2025
Form 1File: f 1.pdf22 Jul 2025
Form 2File: F 2.pdf22 Jul 2025
Form 3File: F3.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: S UN.pdf22 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOL.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC.pdf11 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG.pdf11 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf11 Jan 2025
Layout approvalFile: 2 Ivory Vista SANCTION LAYOUT Temp00001.pdf8 Nov 2024
Building plan approvalFile: 2 Ivory Vista SANCTION LAYOUT Temp00002.pdf8 Nov 2024
Building plan approvalFile: 2 Ivory Vista SANCTION LAYOUT Temp00003.pdf8 Nov 2024
Building plan approvalFile: 2 Ivory Vista SANCTION LAYOUT Temp00004.pdf8 Nov 2024
Building plan approvalFile: 2 Ivory Vista SANCTION LAYOUT Temp00005.pdf8 Nov 2024
Copy of Layout Approval (in case of layout)File: 2 Ivory Vista SANCTION LAYOUT Temp00001.pdf8 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf8 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 2 Ivory Vista SANCTION LAYOUT Temp00002.pdf8 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 2 Ivory Vista SANCTION LAYOUT Temp00003.pdf8 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 2 Ivory Vista SANCTION LAYOUT Temp00004.pdf8 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 2 Ivory Vista SANCTION LAYOUT Temp00005.pdf8 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect dhere lett 1724.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: sold unsold inventory.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PHATE AND KAMTHE ASSOCIATES Form 3.pdf20 Jul 2024
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale.pdf28 Mar 2024
Copy of the legal title reportFile: search report as per RERA OK-page-001.pdf19 Mar 2024
Other - LegalFile: index-2.pdf11 Mar 2024
Declaration in FORM BFile: 1 Declaration in FORM B_page-0001 (1).pdf16 Feb 2024
Declaration in FORM BFile: 2 Declaration in FORM B_land owner (1).pdf16 Feb 2024
Other - TechnicalFile: PLAN.pdf16 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Certificate form 3.pdf31 Jan 2024
PAN CardFile: Phate Kamthe Associates Pan Card.pdf6 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate ivory vista-1.pdf6 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: organizaions.pdf6 Jan 2024
Building plan approvalFile: Temp00002.PDF5 Jan 2024
Building plan approvalFile: Temp00003.PDF5 Jan 2024
Building plan approvalFile: Temp00004.PDF5 Jan 2024
Layout approvalFile: Temp00001.PDF5 Jan 2024
Details of encumbrances concerned to FinanceFile: self declaration regarding financial encumbrances.pdf5 Jan 2024
Details of encumbrances concerned to FinanceFile: self declaration regarding legal encumbrances.pdf5 Jan 2024
Details of encumbrances concerned to LegalFile: self declaration regarding financial encumbrances.pdf5 Jan 2024
Details of encumbrances concerned to LegalFile: self declaration regarding legal encumbrances.pdf5 Jan 2024
Copy of Layout Approval (in case of layout)File: Temp00001.PDF5 Jan 2024

How this compares with Pune

34%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep IVORY VISTA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KATRAJ13,700+ in Pune

Builder: PHATE KAMTHE ASSOCIATES

PHATE KAMTHE ASSOCIATES has 1 registration on MahaRERA, including IVORY VISTA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if IVORY VISTA is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of IVORY VISTA?

The registered promoter entity is PHATE KAMTHE ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in IVORY VISTA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for IVORY VISTA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at IVORY VISTA?

The professionals named in the filing: Architect: VIKAS M DHERE; Engineer: SATISH MARATHE; Engineer: VINITESH PHATE; Chartered Accountant: VINAY CHORDIA; Chartered Accountant: VINOD MANE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in IVORY VISTA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About IVORY VISTA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save IVORY VISTA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.