Home / Browse projects / Pune, Maharashtra / INFINITY PLANET E WING

Registration lapsed Litigation declared Residential / Group Housing project

INFINITY PLANET E WING

By TULIP PROPERTIES

RG-MH-27463 · RERA P52100034091 · Last updated on MahaRERA portal: 22 Jun 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 5 months past the filed date
  • Litigation declared, 2 cases
  • Completion date moved by 5 months
  • 1 extension taken
  • Rs 18.00 crore secured on the land, in favour of Aditya Birla Capital Limited

Clear

  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2026Possession promised5 months past this date
10 of 11Construction stages donefurthest along: Basement (if any), 0%
57 of 232Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 212 documents Report an error

INFINITY PLANET E WING is a Residential / Group Housing project by TULIP PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100034091 on 24 Mar 2022. Possession was promised by 31 May 2026 and is now 5 months past that date. The completion date has moved by 5 months from the original filing. 175 of the 232 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameINFINITY PLANET E WING
  • TypeResidential / Group Housing
  • Location
    • MOSHI
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100034091
  • ReraGenie IDRG-MH-27463

Builder

  • NameTULIP PROPERTIES
  • Entity typePartnership
  • GSTIN27AAHFT8884A1ZU
  • PartnersAnand Balasheb Sathe, Sanjay Hariprasad Varma, Nalini Patel
  • Other registrations4 more →
  • Completed3 of 5
  • No longer live1 lapsed, de-registered or revoked

Key dates

5 months past promisethis monthRegisteredMar 2022First promiseDec 2025Revised toMay 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on24 Mar 2022
  • Promised completion31 May 2026
  • Revised completionRevised to 31 May 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed212 files

Current status

75%175 of 232 units booked
100.0%Work done, per cost certificate

Figures as on 22 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
E - URANUSNA21172320232

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

E - URANUS: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed95

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots95
Closed/Covered39
Open Space56

Land and ownership13

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area6,600 sq m
Land owned byThe promoter, with other names on the file
Named landowners13
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Capital Limited
Secured amountRs 18.00 crore
CERSAI search filedYes
Declared on14 Oct 2025
LandownerVillageDistrict
Mrs. Vaishali Kailas AlhatRavetPune
DIPALI AJAY BHIVSANKARMoshiPune
M/S ROYAL PROPERTIESMoshiPune
DIPALI LAXMAN ALHATMoshiPune
ASHOK VITHOBA ALHATMoshiPune
SARIKA ASHOK ALHATMoshiPune
KAMLABAI VITHOBA ALHATMoshiPune
SHARDA KISAN LOKHANDEMoshiPune
BAPURAV GANGARAM KARNEMoshiPune
UDAY BAPURAV KARNEMoshiPune
NITIN BAPURAV KARNEMoshiPune
Dnyaneshwar Vithoba AlhatMoshiPune
Santosh Dnyaneshwar AlhatMoshiPune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI21824.16
Proposed, not sanctioned9,329 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOffice No 101, 102 First floor next GE Avenue SB Road, Tilak Road pune
Estimated costRs 53.00 cr
Cost incurredRs 53.00 cr
Work done100.0%
BuildingWingEstimatedIncurred
E - URANUSNARs 52.37 crRs 52.37 cr
-NARs 62.66 lakhRs 62.66 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLANDMARK DESIGN GROUP
ArchitectUSHA RANGARAJAN
EngineerBhimrao Tengle
EngineerSAMISHTHI TECHNO SERVICES CONSULTANTS LLP
Chartered AccountantV S A P & COMPANY
Chartered AccountantS U N S V G & Associates
Chartered AccountantSnehal Patil
PartnerRole in project
TULIP PROPERTIES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA28022620050Dec 2025 → May 2026

Reason as filed by the promoterThe project has been completed, and the Occupancy Certificate (OC) was obtained on 16.12.2025. The project status is currently shown as lapsed; however, the OC has already been received and is attached herewith. Although the project is completed, the FSI and parking details are yet to be updated as per the latest sanctioned plan. Accordingly, we are submitting this application for extension to enable us to file a correction application and update all project details in line with the latest sanctioned plan.

Litigation declared2

CaseCourtStatus
380/2021CIVIL COURT SR DIVISION PUNEPENDING
131/2021CIVIL JUDGE JR DIVISION PIMPRIPENDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed212

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 212 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 for FY 2026-27 Final.pdf22 Jun 2026
Withdrawal Update Form 2File: Form 2 for FY 2026-27.pdf22 Jun 2026
Withdrawal Update Form 3File: Form 3 for FY 2026-27 Till 31 May 2026.pdf22 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A for Fy 2024-25 E Wing final.pdf22 Jun 2026
Form 5 (FY 2024-2025)File: Form 5 Annual Report - E wing FY 24-25 final.pdf22 Jun 2026
Form 5 (FY 2025-2026)File: Form 5 for FY 2025-26 final.pdf22 Jun 2026
Withdrawal Update Form 1File: Form 1 for FY 2025-26 Q4- E Wing.pdf21 Apr 2026
Withdrawal Update Form 2File: Form 2 for FY 2025-26 E Q4.pdf21 Apr 2026
Withdrawal Update Form 3File: Form 3 for FY 2025-26 Q4- E Wing final.pdf21 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A for FY 2025-26 E Wing final.pdf15 Apr 2026
Withdrawal Update Form 1File: Form 1 for FY 2025-26 Q3.pdf28 Feb 2026
Withdrawal Update Form 2File: Form 2 for FY 2025-26 Q3.pdf28 Feb 2026
Withdrawal Update Form 3File: Form 3 for FY 2025-26 Q3- E Wing.pdf28 Feb 2026
Withdrawal Update Form 1File: Form 1 For FY 2025-26 for Q2 E Wing.pdf18 Nov 2025
Withdrawal Update Form 2File: Form 2 For FY 2025-26 for Q2 E Wing.pdf18 Nov 2025
Withdrawal Update Form 3File: Form 3 for FY 2025-26 for Q2 E Wing.pdf18 Nov 2025
Withdrawal Update Form 1File: FORM 1.pdf8 Sep 2025
Withdrawal Update Form 2File: FORM 2.pdf8 Sep 2025
Withdrawal Update Form 3File: FORM 3 (3).pdf8 Sep 2025
Withdrawal Update Form 1File: FORM 1.pdf8 Aug 2025
Withdrawal Update Form 2File: FORM 2.pdf8 Aug 2025
Withdrawal Update Form 3File: FORM 3 (3).pdf8 Aug 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Planet E Registration Qtr 4 (4).pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1ArchitectsCertificate-Qtr4FY-2024-25_compressed.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Infinity Planet E wing Form 3 Q4.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: PromotersDisclosure-TP-E-wing-Qtr-4.pdf2 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Engineer's Certificate For Quality Assueance.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 For Q3 FY 2024-15.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 For Q3 FY 2024-15.pdf18 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate -Qtr-3 Planet E Wing.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Planet E Registration Qtr 3.pdf14 Feb 2025
Disclosure of sold/ booked inventoryFile: Promoters Disclosure Unit Wise Qtr 3 E Wing (1).pdf14 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate -Qtr-3 Planet E Wing.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Planet E Registration Qtr 3.pdf14 Feb 2025
Disclosure of sold/ booked inventoryFile: Promoters Disclosure Unit Wise Qtr 3 E Wing (1).pdf14 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: TP_Form 5_FY2023-24.pdf4 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: TP_Form 5_FY2023-24.pdf4 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 2024-25 Q1 Infinity Planet Wing E.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 (2024-25 ) Q2.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Planet E-Wing Form 1 Qtr2.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure Planet E-Wing Qtr 2.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 2024-25 Q1 Infinity Planet Wing E.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 (2024-25 ) Q2.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Planet E-Wing Form 1 Qtr2.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure Planet E-Wing Qtr 2.pdf16 Jan 2025
Building plan approvalFile: Plan-1.pdf7 Aug 2024
Building plan approvalFile: Plan-2.pdf7 Aug 2024
Building plan approvalFile: Plan-3.pdf7 Aug 2024
Building plan approvalFile: Plan-4.pdf7 Aug 2024
Building plan approvalFile: Plan-6.pdf7 Aug 2024
Building plan approvalFile: Plan-7.pdf7 Aug 2024
Building plan approvalFile: Plan-8.pdf7 Aug 2024
Building plan approvalFile: Plan-9-11-12-13-14-16.pdf7 Aug 2024
Building plan approvalFile: Plan-5-10-15.pdf7 Aug 2024
Building plan approvalFile: Plan-17.pdf7 Aug 2024
Building plan approvalFile: Scan 18.pdf7 Aug 2024
Building plan approvalFile: Scan 19.pdf7 Aug 2024
Building plan approvalFile: Scan -20.pdf7 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan-1.pdf7 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan-2.pdf7 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan-3.pdf7 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan-4.pdf7 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan-6.pdf7 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan-7.pdf7 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan-8.pdf7 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan-9-11-12-13-14-16.pdf7 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan-5-10-15.pdf7 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan-17.pdf7 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Scan 18.pdf7 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Scan 19.pdf7 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Scan -20.pdf7 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement 19 7 24.pdf7 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 FY 2024-25 Q1 Wing E.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 FY 2024-25 Q1 Wing E.pdf22 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure Planet E-Wing.pdf22 Jul 2024
Disclosure of sold/ booked inventoryFile: Promoter Disclosure FY 2024-25 Q1 Wing E.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 2023-24 Q4.pdf2 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Planet E- Wing.pdf1 Jul 2024

How this compares with Pune

75%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 5 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep INFINITY PLANET E WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MOSHI13,700+ in Pune

2 kmINFINITY PLANET E WINGCompleted 58Lapsed / revoked 32Other 69Dot size: filed unitsN

Filed coordinates, straight-line distance. 159 registered projects within 2 km.

Builder: TULIP PROPERTIES

Tulip Properties has 5 registrations on MahaRERA, including TULIP SWAPNALOK and INFINITY PLANET C AND D WING. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that INFINITY PLANET E WING shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if INFINITY PLANET E WING is delayed beyond 31 May 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of INFINITY PLANET E WING?

The registered promoter entity is TULIP PROPERTIES, a partnership as per the filing. Its GSTIN 27AAHFT8884A1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in INFINITY PLANET E WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for INFINITY PLANET E WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at INFINITY PLANET E WING?

The professionals named in the filing: Architect: LANDMARK DESIGN GROUP; Architect: USHA RANGARAJAN; Engineer: Bhimrao Tengle; Engineer: SAMISHTHI TECHNO SERVICES CONSULTANTS LLP; Chartered Accountant: V S A P & COMPANY; Chartered Accountant: S U N S V G & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in INFINITY PLANET E WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About INFINITY PLANET E WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save INFINITY PLANET E WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.