Home / Browse projects / Pune, Maharashtra / INFINITY PLANET C AND D WING

Completed No litigation declared Others project

INFINITY PLANET C AND D WING

By TULIP PROPERTIES

RG-MH-52224 · RERA P52100019792 · Last updated on MahaRERA portal: 12 Apr 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • 1 extension taken

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
12 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 90%
1Complaints at MahaRERAon this registration
Jump to the 127 documents Report an error

INFINITY PLANET C AND D WING is a Others project by TULIP PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100019792 on 5 Mar 2019. The registration is recorded completed; possession was promised by 31 Dec 2022. 1 complaint is on record with the regulator.

At a glance

Project

  • NameINFINITY PLANET C AND D WING
  • TypeOthers
  • Location
    • MOSHI
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100019792
  • ReraGenie IDRG-MH-52224

Builder

  • NameTULIP PROPERTIES
  • Entity typePartnership
  • GSTIN27AAHFT8884A1ZU
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersAnand Balasheb Sathe, Sanjay Hariprasad Varma, Nalini Patel
  • Other registrations4 more →
  • Completed3 of 5
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredMar 2019PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Mar 2019
  • Promised completion31 Dec 2022
  • Revised completionNone
  • Buildings2 building records
  • Documents filed127 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C MARSNA220000
D JUPITERNA220000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 12 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 90%.

C MARS83%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D JUPITER83%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes40%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed206

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots206
Closed/Covered150
Open Space56
BuildingClosed/CoveredOpen SpaceTotal
C MARS7528103
D JUPITER7528103

Land and ownership23

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,200 sq m
Land owned byThe promoter, with other names on the file
Named landowners23
LandownerVillageDistrict
PANDURANG MAHADU ALHATPimpri Chinchawad (M Corp.)Pune
ARVIND MAHADU ALHATPimpri Chinchawad (M Corp.)Pune
TANAJI MAHADEO ALHATPimpri Chinchawad (M Corp.)Pune
DHANANJAY MURLIDHAR ALHATPimpri Chinchawad (M Corp.)Pune
RAJU MURLIDHAR ALHATPimpri Chinchawad (M Corp.)Pune
VIJAY MURLIDHAR ALHATPimpri Chinchawad (M Corp.)Pune
KAILAS BABAN ALHATPimpri Chinchawad (M Corp.)Pune
ANANT SADHU ALHATPimpri Chinchawad (M Corp.)Pune
SANJAY ALHATPimpri Chinchawad (M Corp.)Pune
RUTURAJ NIVRUTTI ALHAPimpri Chinchawad (M Corp.)Pune
RUSHIKESH NIVRUTTI ALHATPimpri Chinchawad (M Corp.)Pune
ROHINI NIVRUTTI ALHATPimpri Chinchawad (M Corp.)Pune
KOMAL AJAY ALHATPimpri Chinchawad (M Corp.)Pune
KAJAL AKSHAY ALHAPimpri Chinchawad (M Corp.)Pune
VILAS BABAN ALHATPimpri Chinchawad (M Corp.)Pune
ARUNA C JAMBHULKARPimpri Chinchawad (M Corp.)Pune
JANABAI KAILAS ALHATPimpri Chinchawad (M Corp.)Pune
ASHISH KAILAS ALHATPimpri Chinchawad (M Corp.)Pune
SHANTARAM BABAN ALHATPimpri Chinchawad (M Corp.)Pune
VANDANA SHANTARAM ALHATPimpri Chinchawad (M Corp.)Pune
SANGITA VILAS ALHATPimpri Chinchawad (M Corp.)Pune
ANIKET VILAS ALHATPimpri Chinchawad (M Corp.)Pune
ABHISHEK VILAS ALHATPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Permissible FSI60000.0
Proposed, not sanctioned6,955 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOffice No 101 102 First floor next GE Avenue SB Road Tilak Road Pune

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLANDMARK DESIGN GROUP
EngineerSUDHIR KULKARNI
Chartered AccountantS U N S V G & Associates
Chartered AccountantVaibhav Mayur
PartnerRole in project
TULIP PROPERTIES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100002157Dec 2022 → Dec 2023

Reason as filed by the promoterDue to non availability of labour we have not started the project and also have not executed any agreements with the Allottees, hence before starting the project we wish to take 1 year extension

Litigation declared1

CaseCourtStatus
48/2017CIVIL COURT PIMPRIFRAMING OF ISSUES

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000290099Sameer Narendra PolgeTULIP PROPERTIES14/01/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Feb 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Nov 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Nov 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Feb 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Jan 2024

Documents filed127

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 127 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Annual Report TP C and D Wing.pdf12 Apr 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf8 Jul 2024
Certificates of CA (Form 3)File: Form 3 FY 2023-24 Q4.pdf4 Jul 2024
Disclosure of sold/ booked inventoryFile: Promoter Disclosure.pdf3 Jul 2024
Certificates of CA (Form 3)File: Form 3 FY 2023-24 Q3.pdf2 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate CD Wing 100.pdf5 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Planer CD Wing.pdf5 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate Planet CD Q4.pdf5 Jun 2024
Disclosure of sold/ booked inventoryFile: Promoter Disclosure Plant CD Wing Q3.pdf5 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Planet CD wing Q2.pdf23 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate -Planet CD Q2.pdf23 Jan 2024
Disclosure of sold/ booked inventoryFile: Promoter Disclosure Planet CD wing Q2.pdf23 Jan 2024
Certificates of CA (Form 3)File: Form 3 -CD Wing Q2.pdf23 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: CC Infinity Planet C and D Wing Dt 19-1-24.pdf20 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Annual Report - C and D Wing FY 2022-23.pdf10 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech Cirtificate Planet CD Wing Q1.pdf6 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cirtificate planet CD wing Q1.pdf6 Sep 2023
Disclosure of sold/ booked inventoryFile: Promoter disclosure Planet-CD wing Q1.pdf6 Sep 2023
Certificates of CA (Form 3)File: CA Certificate Q1 CD Wing.pdf6 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer Certificate Quality-2A.pdf27 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineers Certificate Form 2A.pdf27 May 2023
Disclosure of sold/ booked inventoryFile: Promoters Disclosure IP CD Wing Q4.pdf22 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf3 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf3 May 2023
Certificates of CA (Form 3)File: CA Certificate (2).pdf3 May 2023
PAN CardFile: pan cARD - tp.pdf1 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CD IP FY 19-20.pdf31 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CD IP FY 20-21.pdf31 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CD IP 21-22.pdf31 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate IP CD Wing Q3.pdf5 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate IP CD Wing Q3.pdf5 Mar 2023
Disclosure of sold/ booked inventoryFile: Promoters Disclosure IP CD Q3.pdf5 Mar 2023
Certificates of CA (Form 3)File: CA Certificate Q3 CD Wing.pdf5 Mar 2023
Certificates of CA (Form 3)File: CA Certificate Q2.pdf26 Nov 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Q2.pdf25 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate- Q2.pdf25 Nov 2022
Disclosure of sold/ booked inventoryFile: Promoters Disclosure Q2.pdf25 Nov 2022
Disclosure of sold/ booked inventoryFile: Promoter disclosure.pdf9 Aug 2022
Certificates of CA (Form 3)File: CA Certificate.pdf9 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate.pdf3 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf3 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect - Form 1.pdf9 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf9 Apr 2022
Form 2AFile: Engineer Certificate Quality.pdf9 Apr 2022
Disclosure of sold/ booked inventoryFile: Promoters Disclosure.pdf9 Apr 2022
Certificates of CA (Form 3)File: CA Certificate Q4.pdf9 Apr 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Reg certificate.pdf9 Mar 2022
Proforma of Allotment letterFile: Agreement Draft - Infinity Planet - MHADA.pdf7 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf4 Feb 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Q3.pdf4 Feb 2022
Disclosure of sold/ booked inventoryFile: Promoter disclosure.pdf4 Feb 2022
Certificates of CA (Form 3)File: CA Certificate Q3.pdf4 Feb 2022
Layout approvalFile: scan 001.pdf1 Nov 2021
Building plan approvalFile: C WING.pdf1 Nov 2021
Building plan approvalFile: D WING.pdf1 Nov 2021
Copy of Layout Approval (in case of layout)File: scan 001.pdf1 Nov 2021
Building Plan Approval (IOD)File: C WING.pdf1 Nov 2021
Building Plan Approval (IOD)File: D WING.pdf1 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-Q2.pdf22 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers certificate Q2.pdf22 Oct 2021
Form 2AFile: Engineers Certificate for Quality Assurance.pdf22 Oct 2021
Disclosure of sold/ booked inventoryFile: Promoter Disclosure-Planet.pdf22 Oct 2021
Certificates of CA (Form 3)File: CA Certificate Q2.pdf22 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera-Architect Certificate.pdf6 Aug 2021
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold-Booked Inventory.pdf5 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate cost Q1 Planet.pdf4 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Certificate Planet Quality.pdf31 Jul 2021
Certificates of CA (Form 3)File: CA Certificate - Q1 TP.pdf31 Jul 2021
Certificates of CA (Form 3)File: CA Certificate Q4.pdf2 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf23 Apr 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's certificate-Cost-Q4 Planet.pdf23 Apr 2021
Form 2AFile: Engineer's certificate-Quality-Q4 Planet.pdf23 Apr 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certficate Planet-Q3.pdf4 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Q3.pdf4 Feb 2021
Form 2AFile: Quality assurance Q3.pdf4 Feb 2021
Certificates of CA (Form 3)File: CA Certificate Q3.pdf4 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate TP.pdf22 Oct 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Certificate Q2 TP.pdf22 Oct 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate- RERA tp.pdf22 Oct 2020
Form 2AFile: Engineers Quality Assurance Certificate RERA Q2 SEPT 20.pdf22 Oct 2020

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep INFINITY PLANET C AND D WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MOSHI13,700+ in Pune

2 kmINFINITY PLANET C AND D Completed 40Lapsed / revoked 23Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 107 registered projects within 2 km.

Builder: TULIP PROPERTIES

Tulip Properties has 5 registrations on MahaRERA, including TULIP SWAPNALOK and INFINITY PLANET C AND D WING. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if INFINITY PLANET C AND D WING is delayed beyond 31 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of INFINITY PLANET C AND D WING?

The registered promoter entity is TULIP PROPERTIES, a partnership as per the filing. Its GSTIN 27AAHFT8884A1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in INFINITY PLANET C AND D WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against INFINITY PLANET C AND D WING?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for INFINITY PLANET C AND D WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at INFINITY PLANET C AND D WING?

The professionals named in the filing: Architect: LANDMARK DESIGN GROUP; Engineer: SUDHIR KULKARNI; Chartered Accountant: S U N S V G & Associates; Chartered Accountant: Vaibhav Mayur. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in INFINITY PLANET C AND D WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About INFINITY PLANET C AND D WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save INFINITY PLANET C AND D WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.