Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
INFINITY PLANET B WING is a Residential / Group Housing project by TULIP PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100030463 on 25 Aug 2021. The registration is recorded completed; possession was promised by 30 Jun 2026.
At a glance
Project
- NameINFINITY PLANET B WING
- TypeResidential / Group Housing
- Location
- MOSHI
- Haveli
- Pune
- 412105
- Pincode412105
- RERA no.P52100030463
- ReraGenie IDRG-MH-22028
Builder
- NameTULIP PROPERTIES
- Entity typePartnership
- GSTIN27AAHFT8884A1ZU
- PartnersAnand Balasheb Sathe, Sanjay Hariprasad Varma, Nalini Patel
- Other registrations4 more →
- Completed3 of 5
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on25 Aug 2021
- Promised completion30 Jun 2026
- Revised completionNone
- Buildings1 building record
- Documents filed145 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| B EARTH | NA | 22 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 8 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.
B EARTH: 85% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 8 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | Yes | 75% |
| Landscaping & Tree Planting | Yes | 80% |
| Street Lighting | Yes | 75% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 80% |
| Solid Waste Management And Disposal | Yes | 80% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 80% |
| Aggregate area of recreational Open Space | Yes | 70% |
| Open Parking | Yes | 70% |
Parking filed82
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership24
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| PANDURANG MAHADU ALHAT | Moshi | Pune |
| ARVIND MAHADU ALHAT | Moshi | Pune |
| TANAJI MAHADEO ALHAT | Moshi | Pune |
| DHANANJAY MURALIDHAR ALHAT | Moshi | Pune |
| RAJU MURALIDHAR ALHAT | Moshi | Pune |
| VIJAY MURALIDHAR ALHAT | Moshi | Pune |
| KAILAS BABAN ALHAT | Moshi | Pune |
| ANANT SADHU ALHAT | Moshi | Pune |
| SANJAY ANANT ALHAT | Moshi | Pune |
| RUTURAJ NIVRUTTI ALHAT | Moshi | Pune |
| RUSHIKESH NIVRUTTI ALHAT | Moshi | Pune |
| ROHINI NIVRUTTI ALHAT | Moshi | Pune |
| KOMAL AJAY ALHAT | Moshi | Pune |
| KAJAL AKSHAY ALHAT | Moshi | Pune |
| VILAS BABAN ALHAT | Moshi | Pune |
| ARUNA C JAMBHULKAR | Moshi | Pune |
| JANABAI KAILAS ALHAT | Moshi | Pune |
| ASHISH KAILAS ALHAT | Moshi | Pune |
| SANGITA VILAS ALHAT | Moshi | Pune |
| ANIKET VILAS ALHAT | Moshi | Pune |
| ABHISHEK VILAS ALHAT | Moshi | Pune |
| VANDANA SHANTARAM ALHAT | Moshi | Pune |
| Rushikesh Alhat | Moshi | Pune |
| RUTURAJ N AALHAT | Moshi | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | LANDMARK DESIGN GROUP |
| Engineer | JW CONSULTANTS LLP |
| Chartered Accountant | V S A P & Company |
| Chartered Accountant | S U N S V G & Associates |
| Partner | Role in project |
|---|---|
| TULIP PROPERTIES | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 48/2017 | CIVIL COURT PIMPRI | FRAMING OF ISSUES |
| 380/2021 | CIVIL COURT SENIOR DIVISION PUNE | PENDING |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jul 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Jul 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Nov 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 6 Aug 2024
Documents filed145
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 145 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Annual Report - TP B Wing 04-04-2025.pdf | 8 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Planet B Wing.pdf | 9 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Planet B Wing.pdf | 9 Nov 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Architect Certificate Form-4 T.pdf | 19 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion B wing.pdf | 6 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Planet B- Wing Q1.pdf | 26 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Planet B-Wing Q1.pdf | 26 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold planet B-wing Q1.pdf | 26 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 2024-25 Q1 Infinity Plant B Wing.pdf | 26 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 2023-24 Q4.pdf | 6 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 2023-24 Q3.pdf | 2 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cirtificate B Wing Q3.pdf | 5 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cirtificate B Wing Q3.pdf | 5 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1FY 23-24 Q4 Planet B Wing.pdf | 5 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Planet B-Wing.pdf | 5 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Planet B- Wing.pdf | 5 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineers Certificate Form 2A -.pdf | 5 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate Quality Planet BWing Q4.pdf | 5 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Promoter Disclosure Planet B-Wing Q3.pdf | 5 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure Planet B-Wing.pdf | 5 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Planet B wing Q2.pdf | 23 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Infinity Planet B wing Q2.pdf | 23 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Promoter Discloser Infinity Planet B wing Q2.pdf | 23 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Tulip Properties B Wing Q2.pdf | 23 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Annual Report - B Wing FY 2022-23.pdf | 10 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Cirtificate (IP B-Wing) Q1.pdf | 6 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cirtificate IP B Wing (Q1).pdf | 6 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Promoter Disclosure IP B Wing (Q1).pdf | 6 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - IP B wing (Q1).pdf | 6 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Planet-B Wing Q3.pdf | 16 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate IP B Wing Q4.pdf | 16 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Promoters Disclosure-IP B Wing Q1.pdf | 16 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Promoters Disclosure IP B Wing Q2.pdf | 16 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Promoters Disclosure IP B Wing Q3.pdf | 16 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Promoter Disclosure IP B wing Q4.pdf | 16 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate IP B-Wing Q3.pdf | 14 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate- Planet B Wing Q2.pdf | 14 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineers Certificate Form 2A -chngd.pdf | 27 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 3 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf | 3 May 2023 |
| Disclosure of sold/ booked inventoryFile: Promoter Disclosure.pdf | 3 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_.pdf | 3 May 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Formation Certificate -Planet B Wing.pdf | 4 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: IP B Wing FY 21-22.pdf | 31 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate B Wing Planet Q2.pdf | 26 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 15 Sep 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf | 15 Sep 2022 |
| Disclosure of sold/ booked inventoryFile: Promoter disclosure.pdf | 4 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 3 May 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-Q4 Infinity Planet B Wing.pdf | 2 May 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate- Form 2.pdf | 2 May 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Certificate-Quality.pdf | 2 May 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-Q3 Planet B Wing.pdf | 2 Feb 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-Planet B Wing.pdf | 2 Feb 2022 |
| Disclosure of sold/ booked inventoryFile: Promoters Disclosure-Infinity Planet B Wing.pdf | 2 Feb 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Q3 - B Wing.pdf | 2 Feb 2022 |
| Building plan approvalFile: scan 021.pdf | 17 Nov 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: scan 021.pdf | 17 Nov 2021 |
| Declaration about Commencement CertificateFile: Foramt D-Commencment Certificate.pdf | 13 Nov 2021 |
| Disclosure of sold/ booked inventoryFile: Promoters Disclosure-Final-Planet-B Wing.pdf | 13 Nov 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Phase-2-B wing Planet.pdf | 12 Nov 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate-B Wing Planet Q2.pdf | 12 Nov 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineers Certificate Quality Assurance-B Wing Planet Q2.pdf | 12 Nov 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Q2.pdf | 12 Nov 2021 |
| Building plan approvalFile: scan 001.pdf | 11 Nov 2021 |
| Building plan approvalFile: scan 002.pdf | 11 Nov 2021 |
| Building plan approvalFile: scan 003.pdf | 11 Nov 2021 |
| Building plan approvalFile: scan 004.pdf | 11 Nov 2021 |
| Building plan approvalFile: scan 005.pdf | 11 Nov 2021 |
| Building plan approvalFile: scan 006.pdf | 11 Nov 2021 |
| Building plan approvalFile: scan 007.pdf | 11 Nov 2021 |
| Building plan approvalFile: scan 008.pdf | 11 Nov 2021 |
| Building plan approvalFile: scan 009.pdf | 11 Nov 2021 |
| Building plan approvalFile: scan 010.pdf | 11 Nov 2021 |
| Building plan approvalFile: scan 011.pdf | 11 Nov 2021 |
| Building plan approvalFile: scan 012.pdf | 11 Nov 2021 |
| Building plan approvalFile: scan 013.pdf | 11 Nov 2021 |
| Building plan approvalFile: scan 014.pdf | 11 Nov 2021 |
| Building plan approvalFile: scan 015.pdf | 11 Nov 2021 |
| Building plan approvalFile: scan 016.pdf | 11 Nov 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 4 other registrations, which the RERA portal never shows together
- All 145 filed documents as one ZIP, foldered, with a manifest
Keep INFINITY PLANET B WING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MOSHI13,700+ in Pune
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: TULIP PROPERTIES
Tulip Properties has 5 registrations on MahaRERA, including TULIP SWAPNALOK and INFINITY PLANET C AND D WING. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if INFINITY PLANET B WING is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of INFINITY PLANET B WING?
The registered promoter entity is TULIP PROPERTIES, a partnership as per the filing. Its GSTIN 27AAHFT8884A1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in INFINITY PLANET B WING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for INFINITY PLANET B WING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at INFINITY PLANET B WING?
The professionals named in the filing: Architect: LANDMARK DESIGN GROUP; Engineer: JW CONSULTANTS LLP; Chartered Accountant: V S A P & Company; Chartered Accountant: S U N S V G & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in INFINITY PLANET B WING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback