Home / Browse projects / Pune, Maharashtra / INFINITY PLANET A WING
INFINITY PLANET A WING
RG-MH-23591 · RERA P52100078903 · Last updated on MahaRERA portal: 24 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 2 cases
- Rs 18.00 crore secured on the land, in favour of Aditya Birla Capital Limited
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
INFINITY PLANET A WING is a Commercial project by TULIP PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100078903 on 20 Jan 2025. Possession is promised by 30 Jun 2027. 19 of the 389 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.
At a glance
Project
- NameINFINITY PLANET A WING
- TypeCommercial
- Location
- Dehu Alandi BRT Road
- Moshi Pune
- Moshi
- Haveli
- Pune
- 412105
- Pincode412105
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100078903
- ReraGenie IDRG-MH-23591
Builder
- NameTULIP PROPERTIES
- Entity typePartnership
- GSTIN27AAHFT8884A1ZU
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersAnand Balasheb Sathe, Sanjay Hariprasad Varma, Nalini Patel
- Other registrations4 more →
- Completed3 of 5
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on20 Jan 2025
- Promised completion30 Jun 2027
- Revised completionNone
- Buildings1 building record
- Documents filed131 files
Current status
Figures as on 24 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A - Venus | NA | 9 | 8 | 0 | 389 | 389 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
A - Venus: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed196
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership78
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Mr Prakash Ratanchand Metha | Ravet | Pune |
| Mr. Laxman Vithoba Alhat | Ravet | Pune |
| Mr. Lalit Sohanlal Jain | Ravet | Pune |
| M/s Kubera Landmarks LLP | Ravet | Pune |
| Mrs. Laxmibai Mahadu Alhat | Ravet | Pune |
| Mrs. Harshada Shambhu Borate alias Harshada Arvind | Ravet | Pune |
| Mrs. Amruta Harish Alhat | Ravet | Pune |
| Mr. Harish Arvind Alhat | Ravet | Pune |
| Mrs. Sujata Arvind Alhat | Ravet | Pune |
| Mrs. Arvind Mahadu Alhat | Ravet | Pune |
| Mrs. Shital Shivaji Khedekar alias shital Tanaji A | Ravet | Pune |
| Mrs. Monali Sagar Alhat | Ravet | Pune |
| Mr. Sagar Tanaji Alhat | Ravet | Pune |
| Mrs. Sushma Tanaji Alhat | Ravet | Pune |
| Mr. Tanaji Mahadu Alhat | Ravet | Pune |
| Mrs. Hemlata Ajay Girame | Ravet | Pune |
| Mrs. Sarika Hemant Alhat | Ravet | Pune |
| Mr. Hemant Pandurang Alhat | Ravet | Pune |
| Mr. Swati Sachin Alhat | Ravet | Pune |
| Mr. Sachin Pandurang Alhat | Ravet | Pune |
| Mrs. Nanda Pandurang Alhat | Ravet | Pune |
| Mr. Pandurang Mahadu Alhat | Ravet | Pune |
| Mrs. Dipali Ajay Bhiwasankar | Ravet | Pune |
| Mr. Nitin Bapurao Karne | Ravet | Pune |
| Mr. Uday Bapurao Karne | Ravet | Pune |
| Mr. Bapurao Gangaram Karne | Ravet | Pune |
| Mrs. Sujata Dhananjay Alhat | Ravet | Pune |
| Mr. Dhananjay Murlidhar Alhat | Ravet | Pune |
| Mrs. Kalpana Vijay Alhat | Ravet | Pune |
| Mr. Vijay Murlidhar Alhat | Ravet | Pune |
| Ms. Shradha Raju Alhat | Ravet | Pune |
| Mrs. Sunita Raju Alhat | Ravet | Pune |
| Mr. Raju Murlidhar Alhat | Ravet | Pune |
| Mrs. Yamunabai Murlidhar Alhat | Ravet | Pune |
| Mr. Murlidhar Sadhu Alhat | Ravet | Pune |
| Mrs. Pratibha Sanjay Alhat | Ravet | Pune |
| Mr. Sanjay Anant Alhat | Ravet | Pune |
| Mrs. Sadhna Ravikant Mate | Ravet | Pune |
| Mrs. Sharmila Jalindar Jadhav | Ravet | Pune |
| Mr. Ajay Shantaram Alhat | Ravet | Pune |
| Mr. Prashant Pandurang Raut | Ravet | Pune |
| Mr. Rahul Pandurang Raut | Ravet | Pune |
| Mrs. Manda alias Mandakini Dilip Gaikwad | Ravet | Pune |
| Mrs. Shila Bhousaheb alias Sonba Kedari | Ravet | Pune |
| Mr. Sitaram Ramchandra Tamhane | Ravet | Pune |
| Mr. Yogesh Dnyaneshwar Alhat | Ravet | Pune |
| Mrs. Vaishali Kailas Alhat | Ravet | Pune |
| Mr. kailas Dnyaneshwar Alhat | Ravet | Pune |
| Mr. Abhijit Santosh Alhat | Ravet | Pune |
| Mrs. Lata Santosh Alhat | Ravet | Pune |
| Mr. Aniket Vilas Alhat | Ravet | Pune |
| Mrs. Sangita Vilas Alhat | Ravet | Pune |
| Mr. Vilas Baban Alhat | Ravet | Pune |
| Mr. Ashish Kailash Alhat | Ravet | Pune |
| Mrs. Ashwini Kailash Alhat alias Ashwini Rajkiran | Ravet | Pune |
| Mrs. Janabai Kailash Alhat | Ravet | Pune |
| Mr. Kailash Baban Alhat | Ravet | Pune |
| Mrs. Kajal Akshay Alhat | Ravet | Pune |
| Mr. Akshay Shantaram Alhat | Ravet | Pune |
| Mrs. Komal Ajay Alhat | Ravet | Pune |
| Mrs. Vandana Shantaram Alhat | Ravet | Pune |
| Mr. Shantaram Baban Alhat | Ravet | Pune |
| Mrs. Savita Chandrakant Satav | Ravet | Pune |
| Mrs. Rupali Yogesh Alhat | Ravet | Pune |
| Mr. Santosh Dnyaneshwar Alhat | Ravet | Pune |
| Mrs. Sushila Dnyaneshwar Alhat | Ravet | Pune |
| Mr. Dnyaneshwar Vithoba Alhat | Ravet | Pune |
| Mrs. Pramila Uttam Lendghar | Ravet | Pune |
| Mrs. Sangita Chandrakant Jadhav | Ravet | Pune |
| Mrs. Suman Anant Alhat | Ravet | Pune |
| Mr. Antu alias Anant Sadhu Alhat | Ravet | Pune |
| Mrs. Rohini Nivrutti Alhat | Ravet | Pune |
| Mrs. Priyanka Nivrutti Alhat | Ravet | Pune |
| Mrs. Shital Nivrutti Alhat alias Shital Yogesh Ban | Ravet | Pune |
| Mr. Rutiraj Nivrutti Alhat | Ravet | Pune |
| Mr. Rushilesh Nivrutti Alhat | Ravet | Pune |
| Mr. Abhishek Vilas Alhat | Ravet | Pune |
| Mr. Kartik Kisanrao Landge | Ravet | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A - Venus | NA | Rs 18.06 cr | Rs 4.72 cr |
| - | NA | Rs 3.19 cr | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Landmark Design Group |
| Engineer | BHIMRAO TENGLE |
| Chartered Accountant | VSAP & Company |
| Chartered Accountant | S U N S V G & Associates |
| Partner | Role in project |
|---|---|
| TULIP PROPERTIES | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 380/2021 | CIVIL COURT SR DIVISION PUNE | PENDING |
| 131/2021 | CIVIL JUDGE JR DIVISION PIMPRI | PENDING |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Dec 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Dec 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Feb 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2027
Documents filed131
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 131 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 for FY 2025-26 Q4 final.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 for FY 2025-26 Q4 final.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 for FY 2025-26 Q4.pdf | 24 Apr 2026 |
| Form 2A (FY 2025-2026)File: Form 2A For FY 2025-26 final.pdf | 24 Apr 2026 |
| Building plan approvalFile: scan 12 Sheet 4 5 6 7 floor unit.pdf | 27 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 for FY 2025-26 Q3.pdf | 16 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 for FY 2025-26 Q3.pdf | 16 Feb 2026 |
| Withdrawal Update Form 3File: CA Certificate Form 3 for FY 2025-26 Q3 A Wing.pdf | 16 Feb 2026 |
| Building plan approvalFile: scan (10).pdf | 8 Jan 2026 |
| Layout approvalFile: Layout plan Highlighted.pdf | 6 Dec 2025 |
| Building plan approvalFile: scan 2- A wing Parking.pdf | 6 Dec 2025 |
| Building plan approvalFile: scan (3).pdf | 6 Dec 2025 |
| Building plan approvalFile: scan (4).pdf | 6 Dec 2025 |
| Building plan approvalFile: scan (5).pdf | 6 Dec 2025 |
| Building plan approvalFile: scan (6).pdf | 6 Dec 2025 |
| Building plan approvalFile: scan (7).pdf | 6 Dec 2025 |
| Building plan approvalFile: scan (8)- A wing ground floor shops.pdf | 6 Dec 2025 |
| Building plan approvalFile: scan (9)- First second third floor units.pdf | 6 Dec 2025 |
| Declaration and undertaking (Annexure A)File: scan (10).pdf | 6 Dec 2025 |
| Building plan approvalFile: scan (11).pdf | 6 Dec 2025 |
| Building plan approvalFile: scan (13).pdf | 6 Dec 2025 |
| Building plan approvalFile: scan (14).pdf | 6 Dec 2025 |
| Building plan approvalFile: scan (15).pdf | 6 Dec 2025 |
| Building plan approvalFile: scan (15A).pdf | 6 Dec 2025 |
| Building plan approvalFile: scan (16).pdf | 6 Dec 2025 |
| Building plan approvalFile: scan (17).pdf | 6 Dec 2025 |
| Building plan approvalFile: scan (18).pdf | 6 Dec 2025 |
| Building plan approvalFile: scan (19).pdf | 6 Dec 2025 |
| Building plan approvalFile: scan (20).pdf | 6 Dec 2025 |
| Building plan approvalFile: scan (21).pdf | 6 Dec 2025 |
| Building plan approvalFile: scan (22).pdf | 6 Dec 2025 |
| Building plan approvalFile: scan (23).pdf | 6 Dec 2025 |
| Building plan approvalFile: scan (24).pdf | 6 Dec 2025 |
| Building plan approvalFile: scan (25).pdf | 6 Dec 2025 |
| Building plan approvalFile: scan (26).pdf | 6 Dec 2025 |
| Building plan approvalFile: scan (27).pdf | 6 Dec 2025 |
| Building plan approvalFile: scan (28).pdf | 6 Dec 2025 |
| Building plan approvalFile: scan (29).pdf | 6 Dec 2025 |
| Form 2A (FY 2024-2025)File: Form 2A Sign.pdf | 5 Dec 2025 |
| Form 5 (FY 2024-2025)File: CA Form 5.pdf | 1 Dec 2025 |
| Layout approvalFile: Layout plan (1).pdf | 12 Nov 2025 |
| Building plan approvalFile: scan (2).pdf | 12 Nov 2025 |
| Building plan approvalFile: scan (3).pdf | 12 Nov 2025 |
| Building plan approvalFile: scan (4).pdf | 12 Nov 2025 |
| Building plan approvalFile: scan (5).pdf | 12 Nov 2025 |
| Building plan approvalFile: scan (6).pdf | 12 Nov 2025 |
| Building plan approvalFile: scan (7).pdf | 12 Nov 2025 |
| Building plan approvalFile: scan (8).pdf | 12 Nov 2025 |
| Building plan approvalFile: scan (9).pdf | 12 Nov 2025 |
| Building plan approvalFile: scan (10).pdf | 12 Nov 2025 |
| Building plan approvalFile: scan (11).pdf | 12 Nov 2025 |
| Building plan approvalFile: scan (12).pdf | 12 Nov 2025 |
| Building plan approvalFile: scan (13).pdf | 12 Nov 2025 |
| Building plan approvalFile: scan (14).pdf | 12 Nov 2025 |
| Building plan approvalFile: scan (15).pdf | 12 Nov 2025 |
| Building plan approvalFile: scan (15A).pdf | 12 Nov 2025 |
| Building plan approvalFile: scan (16).pdf | 12 Nov 2025 |
| Building plan approvalFile: scan (17).pdf | 12 Nov 2025 |
| Building plan approvalFile: scan (18).pdf | 12 Nov 2025 |
| Building plan approvalFile: scan (19).pdf | 12 Nov 2025 |
| Building plan approvalFile: scan (20).pdf | 12 Nov 2025 |
| Building plan approvalFile: scan (21).pdf | 12 Nov 2025 |
| Building plan approvalFile: scan (22).pdf | 12 Nov 2025 |
| Building plan approvalFile: scan (23).pdf | 12 Nov 2025 |
| Building plan approvalFile: scan (24).pdf | 12 Nov 2025 |
| Building plan approvalFile: scan (25).pdf | 12 Nov 2025 |
| Building plan approvalFile: scan (26).pdf | 12 Nov 2025 |
| Building plan approvalFile: scan (27).pdf | 12 Nov 2025 |
| Building plan approvalFile: scan (28).pdf | 12 Nov 2025 |
| Building plan approvalFile: scan (29).pdf | 12 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 FY 2025-26 for Q2.pdf | 10 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 FY 2025-26 for Q2.pdf | 10 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 FY 2025-26 for Q2 Tulip properties A wing.pdf | 10 Nov 2025 |
| Withdrawal Update Form 1File: FORM 1.pdf | 8 Sep 2025 |
| Withdrawal Update Form 2File: FORM 2.pdf | 8 Sep 2025 |
| Withdrawal Update Form 3File: Form 3 Sign A wing.pdf | 8 Sep 2025 |
| Withdrawal Update Form 1File: FORM 1.pdf | 8 Aug 2025 |
| Withdrawal Update Form 2File: FORM 2.pdf | 8 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 Sign A wing.pdf | 8 Aug 2025 |
| Building plan approvalFile: Plan No 2.pdf | 1 Jul 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 131 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep INFINITY PLANET A WING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Moshi Pune13,700+ in Pune
Filed coordinates, straight-line distance. 146 registered projects within 2 km.
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: TULIP PROPERTIES
Tulip Properties has 5 registrations on MahaRERA, including TULIP SWAPNALOK and INFINITY PLANET C AND D WING. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if INFINITY PLANET A WING is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of INFINITY PLANET A WING?
The registered promoter entity is TULIP PROPERTIES, a partnership as per the filing. Its GSTIN 27AAHFT8884A1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in INFINITY PLANET A WING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for INFINITY PLANET A WING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at INFINITY PLANET A WING?
The professionals named in the filing: Architect: Landmark Design Group; Engineer: BHIMRAO TENGLE; Chartered Accountant: VSAP & Company; Chartered Accountant: S U N S V G & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in INFINITY PLANET A WING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback