Home / Browse projects / Pune, Maharashtra / INFINITY PLANET A WING

Registered Litigation declared Commercial project

INFINITY PLANET A WING

By TULIP PROPERTIES

RG-MH-23591 · RERA P52100078903 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • Rs 18.00 crore secured on the land, in favour of Aditya Birla Capital Limited

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
370 of 389Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 131 documents Report an error

INFINITY PLANET A WING is a Commercial project by TULIP PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100078903 on 20 Jan 2025. Possession is promised by 30 Jun 2027. 19 of the 389 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameINFINITY PLANET A WING
  • TypeCommercial
  • Location
    • Dehu Alandi BRT Road
    • Moshi Pune
    • Moshi
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100078903
  • ReraGenie IDRG-MH-23591

Builder

  • NameTULIP PROPERTIES
  • Entity typePartnership
  • GSTIN27AAHFT8884A1ZU
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersAnand Balasheb Sathe, Sanjay Hariprasad Varma, Nalini Patel
  • Other registrations4 more →
  • Completed3 of 5
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJan 2025PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Jan 2025
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed131 files

Current status

5%19 of 389 units booked
22.2%Work done, per cost certificate

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A - VenusNA980389389

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

A - Venus: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed196

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots196
Closed/Covered170
Open Space26

Land and ownership78

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,650 sq m
Land owned byNot the promoter
Named landowners78
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Capital Limited
Secured amountRs 18.00 crore
CERSAI search filedYes
Declared on14 Oct 2025
LandownerVillageDistrict
Mr Prakash Ratanchand MethaRavetPune
Mr. Laxman Vithoba AlhatRavetPune
Mr. Lalit Sohanlal JainRavetPune
M/s Kubera Landmarks LLPRavetPune
Mrs. Laxmibai Mahadu AlhatRavetPune
Mrs. Harshada Shambhu Borate alias Harshada ArvindRavetPune
Mrs. Amruta Harish AlhatRavetPune
Mr. Harish Arvind AlhatRavetPune
Mrs. Sujata Arvind AlhatRavetPune
Mrs. Arvind Mahadu AlhatRavetPune
Mrs. Shital Shivaji Khedekar alias shital Tanaji ARavetPune
Mrs. Monali Sagar AlhatRavetPune
Mr. Sagar Tanaji AlhatRavetPune
Mrs. Sushma Tanaji AlhatRavetPune
Mr. Tanaji Mahadu AlhatRavetPune
Mrs. Hemlata Ajay GirameRavetPune
Mrs. Sarika Hemant AlhatRavetPune
Mr. Hemant Pandurang AlhatRavetPune
Mr. Swati Sachin AlhatRavetPune
Mr. Sachin Pandurang AlhatRavetPune
Mrs. Nanda Pandurang AlhatRavetPune
Mr. Pandurang Mahadu AlhatRavetPune
Mrs. Dipali Ajay BhiwasankarRavetPune
Mr. Nitin Bapurao KarneRavetPune
Mr. Uday Bapurao KarneRavetPune
Mr. Bapurao Gangaram KarneRavetPune
Mrs. Sujata Dhananjay AlhatRavetPune
Mr. Dhananjay Murlidhar AlhatRavetPune
Mrs. Kalpana Vijay AlhatRavetPune
Mr. Vijay Murlidhar AlhatRavetPune
Ms. Shradha Raju AlhatRavetPune
Mrs. Sunita Raju AlhatRavetPune
Mr. Raju Murlidhar AlhatRavetPune
Mrs. Yamunabai Murlidhar AlhatRavetPune
Mr. Murlidhar Sadhu AlhatRavetPune
Mrs. Pratibha Sanjay AlhatRavetPune
Mr. Sanjay Anant AlhatRavetPune
Mrs. Sadhna Ravikant MateRavetPune
Mrs. Sharmila Jalindar JadhavRavetPune
Mr. Ajay Shantaram AlhatRavetPune
Mr. Prashant Pandurang RautRavetPune
Mr. Rahul Pandurang RautRavetPune
Mrs. Manda alias Mandakini Dilip GaikwadRavetPune
Mrs. Shila Bhousaheb alias Sonba KedariRavetPune
Mr. Sitaram Ramchandra TamhaneRavetPune
Mr. Yogesh Dnyaneshwar AlhatRavetPune
Mrs. Vaishali Kailas AlhatRavetPune
Mr. kailas Dnyaneshwar AlhatRavetPune
Mr. Abhijit Santosh AlhatRavetPune
Mrs. Lata Santosh AlhatRavetPune
Mr. Aniket Vilas AlhatRavetPune
Mrs. Sangita Vilas AlhatRavetPune
Mr. Vilas Baban AlhatRavetPune
Mr. Ashish Kailash AlhatRavetPune
Mrs. Ashwini Kailash Alhat alias Ashwini RajkiranRavetPune
Mrs. Janabai Kailash AlhatRavetPune
Mr. Kailash Baban AlhatRavetPune
Mrs. Kajal Akshay AlhatRavetPune
Mr. Akshay Shantaram AlhatRavetPune
Mrs. Komal Ajay AlhatRavetPune
Mrs. Vandana Shantaram AlhatRavetPune
Mr. Shantaram Baban AlhatRavetPune
Mrs. Savita Chandrakant SatavRavetPune
Mrs. Rupali Yogesh AlhatRavetPune
Mr. Santosh Dnyaneshwar AlhatRavetPune
Mrs. Sushila Dnyaneshwar AlhatRavetPune
Mr. Dnyaneshwar Vithoba AlhatRavetPune
Mrs. Pramila Uttam LendgharRavetPune
Mrs. Sangita Chandrakant JadhavRavetPune
Mrs. Suman Anant AlhatRavetPune
Mr. Antu alias Anant Sadhu AlhatRavetPune
Mrs. Rohini Nivrutti AlhatRavetPune
Mrs. Priyanka Nivrutti AlhatRavetPune
Mrs. Shital Nivrutti Alhat alias Shital Yogesh BanRavetPune
Mr. Rutiraj Nivrutti AlhatRavetPune
Mr. Rushilesh Nivrutti AlhatRavetPune
Mr. Abhishek Vilas AlhatRavetPune
Mr. Kartik Kisanrao LandgeRavetPune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI15560.34
Proposed, not sanctioned12,080 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGR FL SHOP NO04 05 AND 06 BIZ SNO 2031 RAVET PIMPRI CHINCHWAD PUNE MAHARASHTRA 412101
Estimated costRs 21.25 cr
Cost incurredRs 4.72 cr
Work done22.21%
BuildingWingEstimatedIncurred
A - VenusNARs 18.06 crRs 4.72 cr
-NARs 3.19 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLandmark Design Group
EngineerBHIMRAO TENGLE
Chartered AccountantVSAP & Company
Chartered AccountantS U N S V G & Associates
PartnerRole in project
TULIP PROPERTIES-

Litigation declared2

CaseCourtStatus
380/2021CIVIL COURT SR DIVISION PUNEPENDING
131/2021CIVIL JUDGE JR DIVISION PIMPRIPENDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Feb 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed131

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 131 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 for FY 2025-26 Q4 final.pdf24 Apr 2026
Withdrawal Update Form 2File: Form 2 for FY 2025-26 Q4 final.pdf24 Apr 2026
Withdrawal Update Form 3File: Form 3 for FY 2025-26 Q4.pdf24 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A For FY 2025-26 final.pdf24 Apr 2026
Building plan approvalFile: scan 12 Sheet 4 5 6 7 floor unit.pdf27 Feb 2026
Withdrawal Update Form 1File: Form 1 for FY 2025-26 Q3.pdf16 Feb 2026
Withdrawal Update Form 2File: Form 2 for FY 2025-26 Q3.pdf16 Feb 2026
Withdrawal Update Form 3File: CA Certificate Form 3 for FY 2025-26 Q3 A Wing.pdf16 Feb 2026
Building plan approvalFile: scan (10).pdf8 Jan 2026
Layout approvalFile: Layout plan Highlighted.pdf6 Dec 2025
Building plan approvalFile: scan 2- A wing Parking.pdf6 Dec 2025
Building plan approvalFile: scan (3).pdf6 Dec 2025
Building plan approvalFile: scan (4).pdf6 Dec 2025
Building plan approvalFile: scan (5).pdf6 Dec 2025
Building plan approvalFile: scan (6).pdf6 Dec 2025
Building plan approvalFile: scan (7).pdf6 Dec 2025
Building plan approvalFile: scan (8)- A wing ground floor shops.pdf6 Dec 2025
Building plan approvalFile: scan (9)- First second third floor units.pdf6 Dec 2025
Declaration and undertaking (Annexure A)File: scan (10).pdf6 Dec 2025
Building plan approvalFile: scan (11).pdf6 Dec 2025
Building plan approvalFile: scan (13).pdf6 Dec 2025
Building plan approvalFile: scan (14).pdf6 Dec 2025
Building plan approvalFile: scan (15).pdf6 Dec 2025
Building plan approvalFile: scan (15A).pdf6 Dec 2025
Building plan approvalFile: scan (16).pdf6 Dec 2025
Building plan approvalFile: scan (17).pdf6 Dec 2025
Building plan approvalFile: scan (18).pdf6 Dec 2025
Building plan approvalFile: scan (19).pdf6 Dec 2025
Building plan approvalFile: scan (20).pdf6 Dec 2025
Building plan approvalFile: scan (21).pdf6 Dec 2025
Building plan approvalFile: scan (22).pdf6 Dec 2025
Building plan approvalFile: scan (23).pdf6 Dec 2025
Building plan approvalFile: scan (24).pdf6 Dec 2025
Building plan approvalFile: scan (25).pdf6 Dec 2025
Building plan approvalFile: scan (26).pdf6 Dec 2025
Building plan approvalFile: scan (27).pdf6 Dec 2025
Building plan approvalFile: scan (28).pdf6 Dec 2025
Building plan approvalFile: scan (29).pdf6 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A Sign.pdf5 Dec 2025
Form 5 (FY 2024-2025)File: CA Form 5.pdf1 Dec 2025
Layout approvalFile: Layout plan (1).pdf12 Nov 2025
Building plan approvalFile: scan (2).pdf12 Nov 2025
Building plan approvalFile: scan (3).pdf12 Nov 2025
Building plan approvalFile: scan (4).pdf12 Nov 2025
Building plan approvalFile: scan (5).pdf12 Nov 2025
Building plan approvalFile: scan (6).pdf12 Nov 2025
Building plan approvalFile: scan (7).pdf12 Nov 2025
Building plan approvalFile: scan (8).pdf12 Nov 2025
Building plan approvalFile: scan (9).pdf12 Nov 2025
Building plan approvalFile: scan (10).pdf12 Nov 2025
Building plan approvalFile: scan (11).pdf12 Nov 2025
Building plan approvalFile: scan (12).pdf12 Nov 2025
Building plan approvalFile: scan (13).pdf12 Nov 2025
Building plan approvalFile: scan (14).pdf12 Nov 2025
Building plan approvalFile: scan (15).pdf12 Nov 2025
Building plan approvalFile: scan (15A).pdf12 Nov 2025
Building plan approvalFile: scan (16).pdf12 Nov 2025
Building plan approvalFile: scan (17).pdf12 Nov 2025
Building plan approvalFile: scan (18).pdf12 Nov 2025
Building plan approvalFile: scan (19).pdf12 Nov 2025
Building plan approvalFile: scan (20).pdf12 Nov 2025
Building plan approvalFile: scan (21).pdf12 Nov 2025
Building plan approvalFile: scan (22).pdf12 Nov 2025
Building plan approvalFile: scan (23).pdf12 Nov 2025
Building plan approvalFile: scan (24).pdf12 Nov 2025
Building plan approvalFile: scan (25).pdf12 Nov 2025
Building plan approvalFile: scan (26).pdf12 Nov 2025
Building plan approvalFile: scan (27).pdf12 Nov 2025
Building plan approvalFile: scan (28).pdf12 Nov 2025
Building plan approvalFile: scan (29).pdf12 Nov 2025
Withdrawal Update Form 1File: Form 1 FY 2025-26 for Q2.pdf10 Nov 2025
Withdrawal Update Form 2File: Form 2 FY 2025-26 for Q2.pdf10 Nov 2025
Withdrawal Update Form 3File: Form 3 FY 2025-26 for Q2 Tulip properties A wing.pdf10 Nov 2025
Withdrawal Update Form 1File: FORM 1.pdf8 Sep 2025
Withdrawal Update Form 2File: FORM 2.pdf8 Sep 2025
Withdrawal Update Form 3File: Form 3 Sign A wing.pdf8 Sep 2025
Withdrawal Update Form 1File: FORM 1.pdf8 Aug 2025
Withdrawal Update Form 2File: FORM 2.pdf8 Aug 2025
Withdrawal Update Form 3File: Form 3 Sign A wing.pdf8 Aug 2025
Building plan approvalFile: Plan No 2.pdf1 Jul 2025

How this compares with Pune

5%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep INFINITY PLANET A WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Moshi Pune13,700+ in Pune

2 kmINFINITY PLANET A WINGCompleted 50Lapsed / revoked 32Other 64Dot size: filed unitsN

Filed coordinates, straight-line distance. 146 registered projects within 2 km.

Builder: TULIP PROPERTIES

Tulip Properties has 5 registrations on MahaRERA, including TULIP SWAPNALOK and INFINITY PLANET C AND D WING. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if INFINITY PLANET A WING is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of INFINITY PLANET A WING?

The registered promoter entity is TULIP PROPERTIES, a partnership as per the filing. Its GSTIN 27AAHFT8884A1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in INFINITY PLANET A WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for INFINITY PLANET A WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at INFINITY PLANET A WING?

The professionals named in the filing: Architect: Landmark Design Group; Engineer: BHIMRAO TENGLE; Chartered Accountant: VSAP & Company; Chartered Accountant: S U N S V G & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in INFINITY PLANET A WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About INFINITY PLANET A WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save INFINITY PLANET A WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.