Home / Browse projects / Pune, Maharashtra / Infini Jagtap City
Infini Jagtap City
RG-MH-59972 · RERA PM1261012600140 · Last updated on MahaRERA portal: 7 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Allotment letter deviates from the model form
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Infini Jagtap City is a Mixed project by Infini Modern Builders LLP in Pune, Maharashtra, registered with MahaRERA as PM1261012600140 on 17 Apr 2026. Possession is promised by 31 Dec 2031. 0 of the 265 units on this registration are recorded sold or booked, and 0 of 90 construction stages are filed complete.
At a glance
Project
- NameInfini Jagtap City
- TypeMixed
- Location
- Opp Navsacha Ganpati Mandir
- Jagtap Wasti
- Charholi Bk.
- Wadmukhwadi
- Haveli
- Pune
- 412105
- Pincode412105
- MapView location on Google Maps (as filed on RERA)
- RERA no.PM1261012600140
- ReraGenie IDRG-MH-59972
Builder
- NameInfini Modern Builders LLP
- Entity typeLimited Liability Partnership
- LLPINABZ-2113
- GSTIN27ABVFM6451F1ZS
- Designated PartnersChetan Gendilal Salunke, Prashant Dattatray Thorat, Pritam Pratap Jagtap, Vivek Bhanudas Tapkir
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on17 Apr 2026
- Promised completion31 Dec 2031
- Revised completionNone
- Buildings9 building records
- Documents filed24 files
Current status
Figures as on 7 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A | NA | 4 | 0 | 0 | 0 | 0 |
| Wing B | NA | 4 | 0 | 0 | 0 | 0 |
| Wing C1 | NA | 5 | 1 | 10 | 0 | 10 |
| Wing C2 | NA | 14 | 10 | 99 | 0 | 99 |
| Wing D | NA | 4 | 1 | 8 | 0 | 8 |
| Wing E | NA | 10 | 7 | 56 | 0 | 56 |
| Wing G | NA | 3 | 0 | 0 | 0 | 0 |
| Wing H | NA | 20 | 0 | 52 | 0 | 52 |
| Wing I | NA | 7 | 5 | 0 | 40 | 40 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building9
As on 7 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 90 construction stages are filed complete across 9 buildings. The stage furthest along is Excavation, at 85%.
Wing A1%
| Activity | Progress |
|---|---|
| Excavation | 6% |
| Basement (if any) | 0% |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing B1%
| Activity | Progress |
|---|---|
| Excavation | 6% |
| Basement (if any) | 0% |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing C10%
| Activity | Progress |
|---|---|
| Excavation | 5% |
| Basement (if any) | 0% |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing C21%
| Activity | Progress |
|---|---|
| Excavation | 10% |
| Basement (if any) | 0% |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing D27%
| Activity | Progress |
|---|---|
| Excavation | 85% |
| Basement (if any) | 85% |
| Podiums (if any) | Not applicable |
| Plinth | 80% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 20% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing E27%
| Activity | Progress |
|---|---|
| Excavation | 85% |
| Basement (if any) | 85% |
| Podiums (if any) | Not applicable |
| Plinth | 80% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 20% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing G0%
| Activity | Progress |
|---|---|
| Excavation | 5% |
| Basement (if any) | 0% |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing H0%
| Activity | Progress |
|---|---|
| Excavation | 5% |
| Basement (if any) | 0% |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing I0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 7 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | No | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | 0% |
| Storm Water Drains | No | 0% |
| Landscaping & Tree Planting | No | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | 0% |
Parking filed630
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Stilt / Ground | Basement | Total |
|---|---|---|---|---|
| Wing A | 17 | 25 | 16 | 58 |
| Wing B | 31 | 17 | 37 | 85 |
| Wing C1 | 42 | 17 | 80 | 139 |
| Wing C2 | 33 | 13 | 53 | 99 |
| Wing D | 20 | 16 | 40 | 76 |
| Wing E | 38 | 24 | 44 | 106 |
| Wing G | 20 | 3 | 16 | 39 |
| Wing H | 9 | 1 | 18 | 28 |
Land and ownership48
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Chandrakant Subhash Jagtap | - | Pune |
| Shivaji Subhash Jagtap | - | Pune |
| Shashikala Subhash Jagtap | - | Pune |
| Savita Kumar Gaikwad | - | Pune |
| Suvarna Chandrakant Jagtap | - | Pune |
| Uma Shivaji Jagtap | - | Pune |
| Om Chandrakant Jagtap | - | Pune |
| Abhijeet Chandrakant Jagtap | - | Pune |
| Ajit Shivaji Jagtap | - | Pune |
| Anjali Shivaji Jagtap | - | Pune |
| Manda Sambhaji Jagtap | - | Pune |
| Sarthak Sambhaji Jagtap | - | Pune |
| Shamrao Kaluram Jagtap | - | Pune |
| Avinash Shamrao Jagtap | - | Pune |
| Kalpana Amar Kale | - | Pune |
| Sunita Yashwant Sawant | - | Pune |
| Nita Tukaram Gawali | - | Pune |
| Punam Avinash Jagtap | - | Pune |
| Archana Ganesh Jhanjale | - | Pune |
| Alka Shamrao Jagtap | - | Pune |
| Akshara Avinash Jagtap | - | Pune |
| Shivagya Avinash Jagtap | - | Pune |
| Asha Maruti Jagtap | - | Pune |
| Umesh Maruti Jagtap | - | Pune |
| Archana Umesh Jagtap | - | Pune |
| Harshvardhan Umesh Jagtap | - | Pune |
| Tejaswini Umesh Jagtap | - | Pune |
| Mahesh Maruti Jagtap | - | Pune |
| Alka Mahesh Jagtap | - | Pune |
| Ganesh Mahesh Jagtap | - | Pune |
| Shobhna Jagannath Kale | - | Pune |
| Nilesh Ashok Ghongade | - | Pune |
| Bandu Abhiman Nimbalkar | - | Pune |
| Bhagubai Dnyandeo Pokharkar | - | Pune |
| Mahesh Dashrath Avate | - | Pune |
| Mukund Jaykumar Lokhande | - | Nanded |
| Yogesh Pratap Jagtap | - | Pune |
| Yogesh Sureshrao Gaikwad | - | Pune |
| Ravindra Ganpat Hodge | - | Pune |
| Vivek Balshiram Kadam | - | Mumbai City |
| Shilpa Savta Kolhe | - | Pune |
| Alka Ganpatrao Indore | - | Pune |
| Tushar Anil Jagtap | - | Pune |
| Nagnath Baburao Ghuge | - | Aurangabad |
| Sandip Dilip Pathare | - | Pune |
| Prashant Dattatray Thorat | - | Pune |
| Pritam Pratap Jagtap | - | Pune |
| Chetan Gendilal Salunke | - | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | YW Architect |
| Engineer | Aadi Associates |
| Chartered Accountant | Pratik D Jain & Associates |
| Partner | Role in project |
|---|---|
| Infini Modern Builders LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportNot on the file
A lawyer's report on who owns the land and what is registered against it.
- Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Apr 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Apr 2026 - Commencement CertificateNot on the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
- Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2031
Documents filed24
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Building plan approvalFile: Blank Page.pdf | 7 Apr 2026 |
| Building plan approvalFile: Blank Page.pdf | 7 Apr 2026 |
| Building plan approvalFile: Blank Page.pdf | 7 Apr 2026 |
| Declaration and undertaking (Annexure A)File: Annexture A.pdf | 2 Apr 2026 |
| Layout approvalFile: Layout Plan-Infini.pdf | 1 Apr 2026 |
| Building plan approvalFile: Layout Plan No 1.pdf | 31 Mar 2026 |
| Building plan approvalFile: Club House Plan No 22.pdf | 27 Mar 2026 |
| Building plan approvalFile: Parking Floor Plan No 2.pdf | 27 Mar 2026 |
| Building plan approvalFile: Wing A Plan No 3.pdf | 27 Mar 2026 |
| Building plan approvalFile: Wing B Plan No 4.pdf | 27 Mar 2026 |
| Building plan approvalFile: Wing C1 Plan No 5.pdf | 27 Mar 2026 |
| Building plan approvalFile: Wing C1 Plan No 6.pdf | 27 Mar 2026 |
| Building plan approvalFile: Wing C2 Plan No 7.pdf | 27 Mar 2026 |
| Building plan approvalFile: Wing C2 Plan No 8.pdf | 27 Mar 2026 |
| Building plan approvalFile: Wing C2 Plan No 9.pdf | 27 Mar 2026 |
| Building plan approvalFile: Wing D Plan No 10.pdf | 27 Mar 2026 |
| Building plan approvalFile: Wing E Plan No 11.pdf | 27 Mar 2026 |
| Building plan approvalFile: Wing E Plan No 12.pdf | 27 Mar 2026 |
| Building plan approvalFile: Wing G Plan No 16.pdf | 27 Mar 2026 |
| Building plan approvalFile: Wing H Plan No 17.pdf | 27 Mar 2026 |
| Building plan approvalFile: Wing H Plan No 18.pdf | 27 Mar 2026 |
| Building plan approvalFile: Wing I Commercial Plan No 19.pdf | 27 Mar 2026 |
| Building plan approvalFile: Wing I Commercial Plan No 20.pdf | 27 Mar 2026 |
| Building plan approvalFile: Wing I Commercial Plan No 21.pdf | 27 Mar 2026 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Infini Jagtap City Building FP52100056348 | Jagtap Wasti, Charholi Bk., Pune | 135 | May 2024 | Ongoing | May 2028 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 24 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Infini Jagtap City on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Jagtap Wasti, Charholi Bk.13,700+ in Pune
Filed coordinates, straight-line distance. 134 registered projects within 2 km.
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: Infini Modern Builders LLP
Infini Modern Builders LLP has 1 registration on MahaRERA, including Infini Jagtap City. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Infini Jagtap City is delayed beyond 31 Dec 2031?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Infini Jagtap City?
The registered promoter entity is Infini Modern Builders LLP, a limited liability partnership as per the filing. Its LLPIN ABZ-2113 and GSTIN 27ABVFM6451F1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Infini Jagtap City?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Infini Jagtap City?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Infini Jagtap City?
The professionals named in the filing: Architect: YW Architect; Engineer: Aadi Associates; Chartered Accountant: Pratik D Jain & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Infini Jagtap City?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback